Freestanding photovoltaic installation with a maximum power of 0,95 MWp in Stare Czarnowo (Q137685): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in it, and other parts: Adding Italian translations)
(‎Changed label, description and/or aliases in es, and other parts: Adding Spanish translations)
label / eslabel / es
 
Instalación fotovoltaica independiente con una capacidad máxima de 0,95 MWp en Stare Czarnowo
Property / summary
 
El proyecto consistirá en plantar una instalación fotovoltaica con una capacidad máxima de 0,95 MWp. La inversión se ubicará en Stare Czarnowo, condado de Gryfin. El proyecto está inmóvil. Cubrirá parcelas con los números 74/2, 78/12, 78/14. La superficie total de inversión asciende a 1,5 hectáreas. La instalación constará de 3652 módulos con dimensiones de aprox. 982 mm x 1 670 mm y potencia 260 Wp cada uno, montados en marcos independientes. La instalación estará totalmente automatizada y conectada al sistema de monitoreo, analizando la eficiencia y el rendimiento energético. Para su construcción, se utilizarán módulos fotovoltaicos, montados en bastidores, manteniendo huecos entre filas individuales de racks. Más específicamente, la instalación fotovoltaica creará los siguientes elementos: estructuras separadas para el montaje de módulos fotovoltaicos; Módulos fotovoltaicos en la cantidad de 3.652 PC con una potencia de 260 W cada uno; inversores de hasta 50 piezas hasta 50 kVA; cables de baja tensión colocados en el suelo, a una profundidad de 70 δ 80 cm; estación de transformador SN/Nn contenedor con dimensiones de aproximadamente 3x6 m y altura hasta 4 m con transformador 15/0,4 kV, salida nominal de hasta 1250 kVA; conexión de potencia de media tensión. Se preparó una ficha informativa para el proyecto, se tomó la decisión de no elaborar un informe de impacto ambiental. El proyecto requiere un permiso de construcción y se presentó una solicitud el 13 de mayo de 2016. El inicio de la inversión está previsto para principios de septiembre, la inversión incluye la preparación del terreno, la fundación de la instalación y su conexión a la red eléctrica. La realización de la inversión está prevista para la primera quincena de diciembre. Alrededor del 8 % de la energía producida se consumirá para uso propio: iluminación, dispositivos de alimentación en modo de espera, monitorización visual de la instalación. El 92 % restante se devolverá a la red para su reventa. (Spanish)
Property / summary: El proyecto consistirá en plantar una instalación fotovoltaica con una capacidad máxima de 0,95 MWp. La inversión se ubicará en Stare Czarnowo, condado de Gryfin. El proyecto está inmóvil. Cubrirá parcelas con los números 74/2, 78/12, 78/14. La superficie total de inversión asciende a 1,5 hectáreas. La instalación constará de 3652 módulos con dimensiones de aprox. 982 mm x 1 670 mm y potencia 260 Wp cada uno, montados en marcos independientes. La instalación estará totalmente automatizada y conectada al sistema de monitoreo, analizando la eficiencia y el rendimiento energético. Para su construcción, se utilizarán módulos fotovoltaicos, montados en bastidores, manteniendo huecos entre filas individuales de racks. Más específicamente, la instalación fotovoltaica creará los siguientes elementos: estructuras separadas para el montaje de módulos fotovoltaicos; Módulos fotovoltaicos en la cantidad de 3.652 PC con una potencia de 260 W cada uno; inversores de hasta 50 piezas hasta 50 kVA; cables de baja tensión colocados en el suelo, a una profundidad de 70 δ 80 cm; estación de transformador SN/Nn contenedor con dimensiones de aproximadamente 3x6 m y altura hasta 4 m con transformador 15/0,4 kV, salida nominal de hasta 1250 kVA; conexión de potencia de media tensión. Se preparó una ficha informativa para el proyecto, se tomó la decisión de no elaborar un informe de impacto ambiental. El proyecto requiere un permiso de construcción y se presentó una solicitud el 13 de mayo de 2016. El inicio de la inversión está previsto para principios de septiembre, la inversión incluye la preparación del terreno, la fundación de la instalación y su conexión a la red eléctrica. La realización de la inversión está prevista para la primera quincena de diciembre. Alrededor del 8 % de la energía producida se consumirá para uso propio: iluminación, dispositivos de alimentación en modo de espera, monitorización visual de la instalación. El 92 % restante se devolverá a la red para su reventa. (Spanish) / rank
 
Normal rank
Property / summary: El proyecto consistirá en plantar una instalación fotovoltaica con una capacidad máxima de 0,95 MWp. La inversión se ubicará en Stare Czarnowo, condado de Gryfin. El proyecto está inmóvil. Cubrirá parcelas con los números 74/2, 78/12, 78/14. La superficie total de inversión asciende a 1,5 hectáreas. La instalación constará de 3652 módulos con dimensiones de aprox. 982 mm x 1 670 mm y potencia 260 Wp cada uno, montados en marcos independientes. La instalación estará totalmente automatizada y conectada al sistema de monitoreo, analizando la eficiencia y el rendimiento energético. Para su construcción, se utilizarán módulos fotovoltaicos, montados en bastidores, manteniendo huecos entre filas individuales de racks. Más específicamente, la instalación fotovoltaica creará los siguientes elementos: estructuras separadas para el montaje de módulos fotovoltaicos; Módulos fotovoltaicos en la cantidad de 3.652 PC con una potencia de 260 W cada uno; inversores de hasta 50 piezas hasta 50 kVA; cables de baja tensión colocados en el suelo, a una profundidad de 70 δ 80 cm; estación de transformador SN/Nn contenedor con dimensiones de aproximadamente 3x6 m y altura hasta 4 m con transformador 15/0,4 kV, salida nominal de hasta 1250 kVA; conexión de potencia de media tensión. Se preparó una ficha informativa para el proyecto, se tomó la decisión de no elaborar un informe de impacto ambiental. El proyecto requiere un permiso de construcción y se presentó una solicitud el 13 de mayo de 2016. El inicio de la inversión está previsto para principios de septiembre, la inversión incluye la preparación del terreno, la fundación de la instalación y su conexión a la red eléctrica. La realización de la inversión está prevista para la primera quincena de diciembre. Alrededor del 8 % de la energía producida se consumirá para uso propio: iluminación, dispositivos de alimentación en modo de espera, monitorización visual de la instalación. El 92 % restante se devolverá a la red para su reventa. (Spanish) / qualifier
 
point in time: 19 January 2022
Timestamp+2022-01-19T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 23:27, 18 January 2022

Project Q137685 in Poland
Language Label Description Also known as
English
Freestanding photovoltaic installation with a maximum power of 0,95 MWp in Stare Czarnowo
Project Q137685 in Poland

    Statements

    0 references
    2,274,495.49 zloty
    0 references
    545,878.92 Euro
    13 January 2020
    0 references
    3,055,668.3 zloty
    0 references
    733,360.39 Euro
    13 January 2020
    0 references
    74.44 percent
    0 references
    1 December 2016
    0 references
    30 April 2017
    0 references
    „SELFA GRZEJNICTWO ELEKTRYCZNE” SPÓŁKA AKCYJNA
    0 references
    0 references
    Przedsięwzięcie polegać będzie na posadowieniu instalacji fotowoltaicznej o mocy maksymalnej 0,95 MWp. Inwestycja zlokalizowana będzie w miejscowości Stare Czarnowo, w powiecie gryfińskim. Projekt ma charaktery stacjonarny. Swoim zasięgiem będzie obejmować działki o numerach ew. 74/2, 78/12, 78/14. Łączna powierzchnia przeznaczona pod inwestycję wynosi do 1,5 ha. Instalacja będzie się składać z 3652 modułów o wymiarach ok. 982 mm x 1670 mm i mocy 260 Wp każdy, montowanych na wolnostojących stelażach. Instalacja będzie w pełni zautomatyzowana i podłączona do systemu monitoringu, analizującego wydajność i uzysk energetyczny. Do jej budowy wykorzystane zostaną moduły PV, montowane na stelażach z zachowaniem przerw pomiędzy poszczególnymi rzędami stelaży. W ujęciu bardziej uszczegółowionym instalację fotowoltaiczną tworzyć będą następujące elementy: konstrukcje wolnostojące wbijane w ziemię do montażu modułów PV; moduły PV w ilości 3.652 szt. o mocy 260W każdy; inwertery w ilości do 50 szt. o mocy do 50 kVA; kablowe linie energetyczne niskiego napięcia układane w ziemi, na głębokości 70 ÷ 80 cm; stacja transformatorowa SN/Nn kontenerowa o wymiarach około 3x6 m i wysokości do 4 m z transformatorem 15/0,4 kV, moc znamionowa pozorna do 1250 kVA; przyłącze elektroenergetyczne średniego napięcia. Dla projektu przygotowana została karta informacyjna, uzyskano decyzję o braku obowiązku sporządzania raportu oddziaływania na środowisko. Projekt wymaga pozwolenia na budowę, w dniu 13.05.2016r. złożono wniosek o jego wydanie. Rozpoczęcie realizacji inwestycji planowane jest na początek września, inwestycja obejmuje przygotowanie gruntu, posadowienie instalacji oraz podłączenie jej do sieci energetycznej. Zakończenie inwestycji planowane jest na pierwszą połowę grudnia. Ok 8% wyprodukowanej energii zostanie zużytej na potrzeby własne: oświetlenie, zasilanie urządzeń w trybie stand by, monitoring wizyjny instalacji. Pozostałe 92% zostanie odprowadzone do sieci do odsprzedaży. (Polish)
    0 references
    The project will consist of planting a photovoltaic installation with a maximum capacity of 0,95 MWp. The investment will be located in Stare Czarnowo, in the Gryfin County. The project has a stationary character. The range will include plots with numbers of 74/2, 78/12, 78/14. The total area for the investment is up to 1.5 ha. The installation will consist of 3652 modules with dimensions approx. 982 mm x 1670 mm and 260 Wp each, mounted on standalone frames. The installation will be fully automated and connected to a monitoring system analysing efficiency and energy yield. For its construction, PV modules will be used, mounted on the frames, while maintaining gaps between individual rows of frames. In a more detailed way, the photovoltaic installation will create the following elements: ground-mounted freestanding structures for the installation of PV modules; PV modules in the amount of 3.652 units with a capacity of 260 W each; inverters up to 50 units up to 50 kVA; cable power lines of low voltage laid in the ground, at a depth of 70 ÷ 80 cm; SN/Nn container transformer station with dimensions of approximately 3x6 m and height up to 4 m with 15/0.4 kV transformer, rated output up to 1250 kVA; medium-voltage power supply. An information sheet was prepared for the project, and the decision was not made to compile an environmental impact report. The project requires a construction permit, and an application for its issue was submitted on 13.05.2016. The investment is planned to start at the beginning of September, the investment includes preparing the land, planting the plant and connecting it to the power grid. Completion of the investment is planned for the first half of December. About 8 % of the energy produced will be consumed for own consumption: lighting, power supply in stand by mode, video surveillance of the installation. The remaining 92 % will be returned to the network for resale. (English)
    21 October 2020
    0 references
    Le projet consistera à planter une installation photovoltaïque d’une capacité maximale de 0,95 MWc. L’investissement sera situé à Stare Czarnowo, dans le comté de Gryfin. Le projet est stationnaire. Il couvrira les colis portant les numéros 74/2, 78/12, 78/14. La superficie totale des investissements s’élève à 1,5 hectare. L’installation se composera de 3652 modules avec des dimensions d’env. 982 mm x 1 670 mm et puissance 260 Wp chacun, monté sur châssis autoportants. L’installation sera entièrement automatisée et connectée au système de surveillance, en analysant l’efficacité et le rendement énergétique. Pour sa construction, des modules PV seront utilisés, montés sur des cadres, en gardant les écarts entre les différentes rangées de racks. Plus précisément, l’installation PV créera les éléments suivants: structures détachées pour le montage de modules photovoltaïques; Modules PV d’une quantité de 3.652 pcs d’une puissance de 260 W chacun; onduleurs jusqu’à 50 pièces jusqu’à 50 kVA; câbles basse tension posés dans le sol, à une profondeur de 70 ″ 80 cm; station de transformateur SN/Nn conteneur d’environ 3x6 m et hauteur jusqu’à 4 m avec transformateur 15/0,4 kV, puissance nominale jusqu’à 1250 kVA; connexion d’alimentation moyenne tension. Une fiche d’information a été préparée pour le projet, une décision a été obtenue de ne pas établir de rapport d’impact sur l’environnement. Le projet nécessite un permis de construire et une demande a été présentée le 13 mai 2016. Le début de l’investissement est prévu pour début septembre, l’investissement comprend la préparation du terrain, la fondation de l’installation et sa connexion au réseau électrique. L’achèvement de l’investissement est prévu pour la première quinzaine de décembre. Environ 8 % de l’énergie produite sera consommée à des fins propres: éclairage, alimentation en mode veille, surveillance visuelle de l’installation. Les 92 % restants seront retournés au réseau en vue de leur revente. (French)
    2 December 2021
    0 references
    Das Projekt wird in der Anpflanzung einer Photovoltaikanlage mit einer maximalen Kapazität von 0,95 MWp bestehen. Die Investition wird in Stare Czarnowo, Gryfin County, liegen. Das Projekt ist stationär. Es deckt Pakete mit den Nummern 74/2, 78/12, 78/14 ab. Die Gesamtinvestitionsfläche beträgt bis zu 1,5 Hektar. Die Installation besteht aus 3652 Modulen mit Abmessungen von ca. 982 mm x 1 670 mm und Leistung 260 Wp je, montiert auf freistehenden Rahmen. Die Anlage wird vollautomatisiert und an das Überwachungssystem angeschlossen, wobei Effizienz und Energieertrag analysiert werden. Für seine Konstruktion werden PV-Module verwendet, montiert auf Rahmen, halten Lücken zwischen einzelnen Reihen von Racks. Genauer gesagt, die PV-Anlage wird die folgenden Elemente erstellen: freistehende Strukturen für die Montage von PV-Modulen; PV-Module in Höhe von 3,652 Stück mit einer Leistung von je 260 W; Wechselrichter bis 50 Stück bis 50 kVA; im Boden verlegte Niederspannungskabel in einer Tiefe von 70 cm, 80 cm; Transformatorstation SN/Nn Behälter mit Abmessungen von ca. 3x6 m und Höhe bis 4 m mit Transformator 15/0,4 kV, Nennleistung bis 1250 kVA; mittlere Spannungsversorgung. Für das Projekt wurde ein Informationsblatt erstellt, in dem beschlossen wurde, keinen Umweltverträglichkeitsbericht zu erstellen. Das Projekt erfordert eine Baugenehmigung und am 13. Mai 2016 wurde ein Antrag gestellt. Der Beginn der Investition ist für Anfang September geplant, die Investition umfasst die Vorbereitung des Grundstücks, die Gründung der Anlage und ihre Anbindung an das Stromnetz. Der Abschluss der Investition ist für die erste Dezemberhälfte geplant. Etwa 8 % der erzeugten Energie werden für den Eigenverbrauch verbraucht: Beleuchtung, Stromversorgungsgeräte im Standby-Modus, visuelle Überwachung der Installation. Die restlichen 92 % werden zum Weiterverkauf an das Netz zurückgegeben. (German)
    13 December 2021
    0 references
    Het project zal bestaan uit het planten van een fotovoltaïsche installatie met een maximale capaciteit van 0,95 MWp. De investering zal plaatsvinden in Stare Czarnowo, Gryfin County. Het project is stil. Het zal betrekking hebben op pakketten met de nummers 74/2, 78/12, 78/14. Het totale investeringsareaal bedraagt maximaal 1,5 hectare. De installatie bestaat uit 3652 modules met afmetingen van ca. 982 mm x 1 670 mm en vermogen 260 Wp elk, gemonteerd op vrijstaande frames. De installatie wordt volledig geautomatiseerd en aangesloten op het monitoringsysteem, waarbij de efficiëntie en het energierendement worden geanalyseerd. Voor de bouw zullen PV modules worden gebruikt, gemonteerd op frames, het houden van gaten tussen de afzonderlijke rijen rekken. Meer in het bijzonder zal de PV-installatie de volgende elementen creëren: losstaande constructies voor de montage van PV-modules; PV modules in de hoeveelheid van 3.652 stuks met een vermogen van 260 W elk; omvormers tot 50 stuks tot 50 kVA; laagspanningskabels in de grond, op een diepte van 70 р 80 cm; transformatorstation SN/Nn container met afmetingen ongeveer 3x6 m en hoogte tot 4 m met transformator 15/0,4 kV, nominaal vermogen tot 1250 kVA; middenspanningsvoedingsaansluiting. Voor het project werd een informatieblad opgesteld, waarbij werd besloten geen milieueffectrapportage op te stellen. Voor het project is een bouwvergunning vereist en op 13 mei 2016 is een aanvraag ingediend. De start van de investering is gepland voor begin september, de investering omvat de voorbereiding van de grond, de fundering van de installatie en de aansluiting ervan op het elektriciteitsnet. De voltooiing van de investering is gepland voor de eerste helft van december. Ongeveer 8 % van de geproduceerde energie zal voor eigen gebruik worden verbruikt: verlichting, het aandrijven van apparaten in de stand-by-modus, visuele controle van de installatie. De resterende 92 % wordt teruggegeven aan het netwerk voor wederverkoop. (Dutch)
    17 December 2021
    0 references
    Il progetto consisterà nell'impianto di un impianto fotovoltaico con una capacità massima di 0,95 MWp. L'investimento si svolgerà a Stare Czarnowo, nella contea di Gryfin. Il progetto è fermo. Coprirà le parcelle con i numeri 74/2, 78/12, 78/14. L'area d'investimento totale è di 1,5 ettari. L'installazione sarà composta da 3652 moduli con dimensioni di ca. 982 mm x 1 670 mm e potenza 260 Wp ciascuno, montati su telai indipendenti. L'impianto sarà completamente automatizzato e collegato al sistema di monitoraggio, analizzando l'efficienza e la resa energetica. Per la sua costruzione, verranno utilizzati moduli fotovoltaici, montati su telai, mantenendo gli spazi tra le singole file di rack. Più specificamente, l'impianto fotovoltaico creerà i seguenti elementi: strutture staccate per il montaggio di moduli fotovoltaici; Moduli fotovoltaici nella quantità di 3.652 pz con una potenza di 260 W ciascuno; inverter fino a 50 pezzi fino a 50 kVA; cavi a bassa tensione posti a terra, ad una profondità di 70 ÷ 80 cm; contenitore SN/Nn della stazione del trasformatore con dimensioni circa 3x6 m e altezza fino a 4 m con trasformatore 15/0,4 kV, potenza nominale fino a 1250 kVA; connessione di alimentazione a media tensione. È stata preparata una scheda informativa per il progetto, è stata ottenuta la decisione di non redigere una relazione sull'impatto ambientale. Il progetto richiede un permesso di costruzione e una domanda è stata presentata il 13 maggio 2016. L'inizio dell'investimento è previsto per l'inizio di settembre, l'investimento comprende la preparazione del terreno, la fondazione dell'impianto e il suo collegamento alla rete elettrica. Il completamento dell'investimento è previsto per la prima metà di dicembre. Circa l'8 % dell'energia prodotta sarà consumata per uso proprio: illuminazione, dispositivi di alimentazione in modalità standby, monitoraggio visivo dell'installazione. Il restante 92 % sarà restituito alla rete per la rivendita. (Italian)
    15 January 2022
    0 references
    El proyecto consistirá en plantar una instalación fotovoltaica con una capacidad máxima de 0,95 MWp. La inversión se ubicará en Stare Czarnowo, condado de Gryfin. El proyecto está inmóvil. Cubrirá parcelas con los números 74/2, 78/12, 78/14. La superficie total de inversión asciende a 1,5 hectáreas. La instalación constará de 3652 módulos con dimensiones de aprox. 982 mm x 1 670 mm y potencia 260 Wp cada uno, montados en marcos independientes. La instalación estará totalmente automatizada y conectada al sistema de monitoreo, analizando la eficiencia y el rendimiento energético. Para su construcción, se utilizarán módulos fotovoltaicos, montados en bastidores, manteniendo huecos entre filas individuales de racks. Más específicamente, la instalación fotovoltaica creará los siguientes elementos: estructuras separadas para el montaje de módulos fotovoltaicos; Módulos fotovoltaicos en la cantidad de 3.652 PC con una potencia de 260 W cada uno; inversores de hasta 50 piezas hasta 50 kVA; cables de baja tensión colocados en el suelo, a una profundidad de 70 δ 80 cm; estación de transformador SN/Nn contenedor con dimensiones de aproximadamente 3x6 m y altura hasta 4 m con transformador 15/0,4 kV, salida nominal de hasta 1250 kVA; conexión de potencia de media tensión. Se preparó una ficha informativa para el proyecto, se tomó la decisión de no elaborar un informe de impacto ambiental. El proyecto requiere un permiso de construcción y se presentó una solicitud el 13 de mayo de 2016. El inicio de la inversión está previsto para principios de septiembre, la inversión incluye la preparación del terreno, la fundación de la instalación y su conexión a la red eléctrica. La realización de la inversión está prevista para la primera quincena de diciembre. Alrededor del 8 % de la energía producida se consumirá para uso propio: iluminación, dispositivos de alimentación en modo de espera, monitorización visual de la instalación. El 92 % restante se devolverá a la red para su reventa. (Spanish)
    19 January 2022
    0 references

    Identifiers

    RPZP.02.10.00-32-A032/16
    0 references