Extension of sanitary sewage system – Stage V and extension and reconstruction of the water supply network in Miedziana Góra Municipality (Q127762): Difference between revisions
Jump to navigation
Jump to search
(Changed label, description and/or aliases in it, and other parts: Adding Italian translations) |
(Changed label, description and/or aliases in es, and other parts: Adding Spanish translations) |
||||||||||||||
label / es | label / es | ||||||||||||||
Ampliación del sistema de alcantarillado sanitario — Etapa V y ampliación y reconstrucción de la red de abastecimiento de agua en el municipio de Miedziana Góra | |||||||||||||||
Property / summary | |||||||||||||||
El objetivo del proyecto es aumentar el porcentaje de la población que utiliza el sistema de tratamiento de aguas residuales de conformidad con la Directiva sobre aguas residuales urbanas. Etapa V del edificio de alcantarillado. Saneamiento.(Tareas 1 a 5) en msc.Porzecze, Bobrza, recepción y parte de δmińska 25,09 km en tym:22,20 de conductos gravitacionales de 2,37 km, canal de presión de 0,52 km. Se construirán 5 estaciones de bombeo de red y 9 estaciones de bombeo de patio trasero. Se ampliará la red de suministro de agua. 1,7 km, y la red de suministro de agua en msc.Bobrza,obje,-mińsk durante mucho tiempo. 8,00 km (Tareas 1 a 6). 3 tanques de retención serán renovados, se comprará un generador de energía para la estación de suministro de agua. Se tendrán en cuenta los siguientes indicadores para la red de latas y suministro de agua. así como los costes de gestión.proyecto, los costes del proyecto.Documento del proyecto.Incluye SW y compra de parcelas.La implementación de la Etapa V permitirá obtener una tasa de alcantarillado del municipio en la zona de la aglomeración del 100 %.Se lograrán los siguientes indicadores: Número de personas adicionales que utilizan un tratamiento mejorado de las aguas residuales (RLM) (CI 19)-2,283,Número de personas adicionales que utilizan un mejor suministro de agua (personas) (CI 18)-1135,Longitud del alcantarillado sanitario construido (km)-25,09,Longitud de la red de suministro de agua construida (km)-1,70,Longitud de la red de suministro de agua reconstruida (km)-8,00.No incluye się:obiektów adaptada a las necesidades de las personas con discapacidad, formación en competencias digitales, coste de ajustes razonables para las personas con discapacidad, aumento del empleo en empresas beneficiarias de la CPE y entidades de CPE apoyadas, número de puestos de trabajo mantenidos en ETC y puestos de trabajo en ETC de reciente creación. (Spanish) | |||||||||||||||
Property / summary: El objetivo del proyecto es aumentar el porcentaje de la población que utiliza el sistema de tratamiento de aguas residuales de conformidad con la Directiva sobre aguas residuales urbanas. Etapa V del edificio de alcantarillado. Saneamiento.(Tareas 1 a 5) en msc.Porzecze, Bobrza, recepción y parte de δmińska 25,09 km en tym:22,20 de conductos gravitacionales de 2,37 km, canal de presión de 0,52 km. Se construirán 5 estaciones de bombeo de red y 9 estaciones de bombeo de patio trasero. Se ampliará la red de suministro de agua. 1,7 km, y la red de suministro de agua en msc.Bobrza,obje,-mińsk durante mucho tiempo. 8,00 km (Tareas 1 a 6). 3 tanques de retención serán renovados, se comprará un generador de energía para la estación de suministro de agua. Se tendrán en cuenta los siguientes indicadores para la red de latas y suministro de agua. así como los costes de gestión.proyecto, los costes del proyecto.Documento del proyecto.Incluye SW y compra de parcelas.La implementación de la Etapa V permitirá obtener una tasa de alcantarillado del municipio en la zona de la aglomeración del 100 %.Se lograrán los siguientes indicadores: Número de personas adicionales que utilizan un tratamiento mejorado de las aguas residuales (RLM) (CI 19)-2,283,Número de personas adicionales que utilizan un mejor suministro de agua (personas) (CI 18)-1135,Longitud del alcantarillado sanitario construido (km)-25,09,Longitud de la red de suministro de agua construida (km)-1,70,Longitud de la red de suministro de agua reconstruida (km)-8,00.No incluye się:obiektów adaptada a las necesidades de las personas con discapacidad, formación en competencias digitales, coste de ajustes razonables para las personas con discapacidad, aumento del empleo en empresas beneficiarias de la CPE y entidades de CPE apoyadas, número de puestos de trabajo mantenidos en ETC y puestos de trabajo en ETC de reciente creación. (Spanish) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: El objetivo del proyecto es aumentar el porcentaje de la población que utiliza el sistema de tratamiento de aguas residuales de conformidad con la Directiva sobre aguas residuales urbanas. Etapa V del edificio de alcantarillado. Saneamiento.(Tareas 1 a 5) en msc.Porzecze, Bobrza, recepción y parte de δmińska 25,09 km en tym:22,20 de conductos gravitacionales de 2,37 km, canal de presión de 0,52 km. Se construirán 5 estaciones de bombeo de red y 9 estaciones de bombeo de patio trasero. Se ampliará la red de suministro de agua. 1,7 km, y la red de suministro de agua en msc.Bobrza,obje,-mińsk durante mucho tiempo. 8,00 km (Tareas 1 a 6). 3 tanques de retención serán renovados, se comprará un generador de energía para la estación de suministro de agua. Se tendrán en cuenta los siguientes indicadores para la red de latas y suministro de agua. así como los costes de gestión.proyecto, los costes del proyecto.Documento del proyecto.Incluye SW y compra de parcelas.La implementación de la Etapa V permitirá obtener una tasa de alcantarillado del municipio en la zona de la aglomeración del 100 %.Se lograrán los siguientes indicadores: Número de personas adicionales que utilizan un tratamiento mejorado de las aguas residuales (RLM) (CI 19)-2,283,Número de personas adicionales que utilizan un mejor suministro de agua (personas) (CI 18)-1135,Longitud del alcantarillado sanitario construido (km)-25,09,Longitud de la red de suministro de agua construida (km)-1,70,Longitud de la red de suministro de agua reconstruida (km)-8,00.No incluye się:obiektów adaptada a las necesidades de las personas con discapacidad, formación en competencias digitales, coste de ajustes razonables para las personas con discapacidad, aumento del empleo en empresas beneficiarias de la CPE y entidades de CPE apoyadas, número de puestos de trabajo mantenidos en ETC y puestos de trabajo en ETC de reciente creación. (Spanish) / qualifier | |||||||||||||||
point in time: 18 January 2022
|
Revision as of 20:45, 18 January 2022
Project Q127762 in Poland
Language | Label | Description | Also known as |
---|---|---|---|
English | Extension of sanitary sewage system – Stage V and extension and reconstruction of the water supply network in Miedziana Góra Municipality |
Project Q127762 in Poland |
Statements
11,615,124.18 zloty
0 references
14,518,905.23 zloty
0 references
80.0 percent
0 references
7 January 2016
0 references
30 June 2022
0 references
GMINA MIEDZIANA GÓRA
0 references
Celem projektu jest zwiększenie odsetka ludności korzystającego z systemu oczyszczania ścieków zgodnego z dyrektywą dotyczącą ścieków komunalnych.Zostanie zrealizowany Etap V bud. kanaliz. sanit.(Zadania 1 do 5) w msc.Porzecze, Bobrza, Przyjmo i część Ćmińska dł.25,09 km w tym:22,20 km kanały grawitacyjne,2,37 km kanały tłoczne,0,52 km kanał ciśnieniowy.Wybudowanych zostanie 5 przepompowni sieciowych i 9 przepompowni przydomowych.Zakupione zostanie urządzenie ciśnieniowe czyszczące z zamontowanym zestawem do kamerowania rur. Rozbudowana zostanie sieć wodociągowa na dł. 1,7 km, oraz wymieniona sieć wodociągowa w msc.Bobrza,Przyjmo,Ćmińsk na dł. 8,00 km (Zadania 1 do 6).Wyremontowane zostaną 3 zbiorniki retencyjne,zakupiony zostanie agregat prądotwórczy do stacji wodociągowej. Uwzględniono rob.powtórzeniowe dla sieci kan. i wodociąg. oraz koszty zarządz.projektem,koszty oprac.dokument. projekt.w tym SW i zakup działek.Realizacja Etapu V pozwoli uzyskać wskaźnik skanalizowania gminy na terenie aglomeracji w wysokości 100%.Nad robotami sprawowany będzie nadzór inwestorski i autorski.Zapewnimy promocję projektu,a nad prawidłową realizacją będzie czuwał zespół projektowy (pracownicy UG).Zostaną osiągnięte nast. wskaźniki: Liczba dodatkowych osób korzystających z ulepszonego oczyszczania ścieków (RLM) (CI 19)-2.283,Liczba dodatkowych osób korzystających z ulepszonego zaopatrzenia w wodę (osoby) (CI 18)-1135,Długość wybudowanej kanalizacji sanitarnej (km)–25,09, Długość wybudowanej sieci wodociągowej (km)-1,70,Długość przebudowanej sieci wodociągowej (km)-8,00.Nie przewiduje się:obiektów dostosowanych do potrzeb osób z niepełnosprawnościami, szkoleń w zakresie kompetencji cyfrowych,kosztów racjonalnych usprawnień dla osób z niepełnosprawnościami,wzrostu zatrudnienia we wspieranych przedsiębiorstwach EPC i wspieranych podmiotach EPC,liczby utrzymanych miejsc pracy EPC i nowo utworzonych miejsc pracy EPC. (Polish)
0 references
The aim of the project is to increase the percentage of the population using a sewage treatment system in accordance with the directive on municipal waste water.The aim of the project is to increase the percentage of the population using sewage treatment system in accordance with the directive on municipal wastewater.The Stage V bud. sanit.(Tasks 1 to 5) in the Ministry of Economy.Power, beaver, reception and part of Ćmińska tubes length 25.09 km including:22.20 km of gravitational channels, 2.37 km of pressurised channels,0,52 km of pressure channel will be completed. The water supply system will be extended. 1.7 km, and replaced water supply network in the city.Bob, accept,Ćminsk for long. 8.00 km (Tasks 1 to 6). 3 retention tanks will be repaired, a power generator for a water station will be purchased. Additional work for the sewer and water supply network and the management costs of the project, project costs. project.including SW and purchase of plots.The implementation of Stage V will provide an indicator of the scanning of the municipality in the agglomeration area of 100 %.The works will be supervised by investors and authors.We will ensure the promotion of the project, and the project team will be supervised by the project. Number of additional persons benefiting from improved waste water treatment (CI 19)-2.283,Number of additional persons benefiting from improved water supply (persons) (CI 18)-1135,Length of built sanitary sewage system (km)-25.09, Length of built-up water supply network (km)-1,70,Length of the remodeled water supply network (km)-8.00,The length of the efficiency of the e-services is not provided for: (English)
21 October 2020
0 references
L’objectif du projet est d’augmenter le pourcentage de la population utilisant le système de traitement des eaux usées conformément à la directive sur les eaux urbaines résiduaires. Phase V de la construction des égouts. assainissement. (tâches 1 à 5) à msc.Porzecze, Bobrza, réception et une partie de la station d’égouts 25,09 km dans tym:22,20 km conduits gravitationnels, 2,37 km canaux de décharge, 0,52 km canal de pression. 5 stations de pompage réseau et 9 stations de pompage arrière seront construits. Le réseau d’approvisionnement en eau sera étendu. 1,7 km, et le réseau d’adduction d’eau répertorié à msc.Bobrza,obje, 8,00 km (tâches 1 à 6). 3 réservoirs de rétention seront rénovés, un générateur d’énergie sera acheté pour la station d’alimentation en eau. Les indicateurs suivants seront pris en compte pour le réseau de canettes et d’approvisionnement en eau. ainsi que les coûts de gestion.projet, les coûts du projet.Document de projet.y compris SW et l’achat de parcelles.La mise en œuvre de la phase V permettra d’obtenir un taux d’assainissement de la commune dans la zone de l’agglomération de 100 %.Les indicateurs suivants seront atteints: Nombre de personnes supplémentaires utilisant un traitement amélioré des eaux usées (RLM) (CI 19)-2.283,Nombre de personnes supplémentaires utilisant un approvisionnement en eau amélioré (personnes) (CI 18)-1135,Longueur des égouts sanitaires construits (km)-25,09,Longueur du réseau d’approvisionnement en eau construit (km)-1,70,longueur du réseau d’approvisionnement en eau reconstruit (km)-8,00.Ne prévoit pas się:obiektów adapté aux besoins des personnes handicapées, formation en matière de compétences numériques, coût d’aménagement raisonnable pour les personnes handicapées, augmentation de l’emploi dans les entreprises EPC soutenues et entités EPC soutenues, nombre d’emplois FTE maintenus et nouvellement créés. (French)
2 December 2021
0 references
Ziel des Projekts ist es, den Anteil der Bevölkerung, die das Abwasserbehandlungssystem gemäß der kommunalen Abwasserrichtlinie nutzt, zu erhöhen. Stufe V des Gebäudes der Kanalisation. Abwasserentsorgung.(Aufgaben 1 bis 5) in msc.Porzecze, Bobrza, Empfang und Teil von Ćmińska 25,09 km in tym:22,20 km Gravitationskanäle, 2,37 km Ableitungskanäle, 0,52 km Druckkanal. 5 Netzpumpenstationen und 9 Hinterhof-Pumpstationen werden gebaut. Das Wasserversorgungsnetz wird erweitert. 1,7 km und das gelistete Wasserversorgungsnetz in msc.Bobrza,obje,Ćmińsk für lange Zeit. 8,00 km (Aufgaben 1 bis 6). 3 Aufbewahrungstanks werden renoviert, ein Stromerzeuger wird für die Wasserversorgungsstation gekauft. Die folgenden Indikatoren werden für das Netz der Dosen und der Wasserversorgung sowie die Kosten für die Verwaltung.Projekt, die Kosten des Projekts.Projektdokument.einschließlich SW und Kauf von Grundstücken berücksichtigt.Die Umsetzung von Stufe V ermöglicht es, eine Abwasserrate der Gemeinde im Bereich der Ballungsräume von 100 % zu erhalten.Die folgenden Indikatoren werden erreicht: Zahl der zusätzlichen Personen, die eine verbesserte Abwasserbehandlung (RLM) (CI 19)-2.283,Anzahl der zusätzlichen Personen, die eine verbesserte Wasserversorgung (Personen) (CI 18)-1135,Länge der sanitären Abwasserentsorgung (km)-25,09,Länge des gebauten Wasserversorgungsnetzes (km)-1,70,Länge des wiederaufgebauten Wasserversorgungsnetzes (km)-8,00 nutzen. (German)
8 December 2021
0 references
Het doel van het project is het verhogen van het percentage van de bevolking met behulp van het afvalwaterbehandelingssysteem in overeenstemming met de richtlijn stedelijk afvalwater. fase V van het gebouw van riool. sanitaire voorzieningen. (Tasks 1 tot 5) in msc.Porzecze, Bobrza, ontvangst en een deel van Ćmińska 25,09 km in tym:22,20 km zwaartekracht kanalen, 2,37 km afvoerkanalen, 0,52 km druk kanaal. 5 netwerk pompstations en 9 achtertuin pompstations worden gebouwd. Het waterleidingnet zal worden uitgebreid. 1,7 km, en de vermelde watervoorziening in msc.Bobrza,obje,Ćmińsk voor lange tijd. 8,00 km (Tasks 1 tot 6). 3 retentietanks zullen worden gerenoveerd, een stroomgenerator zal worden gekocht voor de watervoorzieningscentrale. De volgende indicatoren worden in aanmerking genomen voor het netwerk van blikken en watervoorziening. evenals de kosten van beheer.project, de kosten van het project.Projectdocument.inclusief SW en aankoop van percelen.De implementatie van fase V maakt het mogelijk om een rioleringspercentage van de gemeente in het gebied van de agglomeratie van 100 % te verkrijgen.De volgende indicatoren zullen worden bereikt: Aantal extra personen dat gebruikmaakt van een verbeterde afvalwaterbehandeling (RLM) (CI 19)-2.283,Aantal extra personen die gebruikmaken van verbeterde watervoorziening (personen) (CI 18)-1135,Lengte van de sanitaire riolering (km)-25,09,Lengte van het aangelegde watervoorzieningsnetwerk (km)-1,70,Lengte van herbouwd waternet (km)-8,00.Geschikt niet voor się:obiektów aangepast aan de behoeften van personen met een handicap, opleiding op het gebied van digitale competenties, kosten van redelijke huisvesting voor personen met een handicap, toename van de werkgelegenheid in ondersteunde EPC-bedrijven en ondersteunde EPC-entiteiten, aantal behouden VTE-banen en nieuw gecreëerde FTE-banen. (Dutch)
17 December 2021
0 references
L'obiettivo del progetto è quello di aumentare la percentuale della popolazione che utilizza il sistema di trattamento delle acque reflue conformemente alla direttiva sulle acque reflue urbane. Fase V della costruzione di fognature igienico-sanitarie (compiti da 1 a 5) nel msc.Porzecze, Bobrza, ricezione e parte di Ćmińska 25,09 km a tym:22,20 km condotti gravitazionali, 2,37 km canali di scarico, 0,52 km canale di pressione. 5 stazioni di pompaggio di rete e 9 stazioni di pompaggio cortile. La rete di approvvigionamento idrico sarà ampliata. 1,7 km, e la rete di approvvigionamento idrico elencata in msc.Bobrza,obje,Ćmińsk per lungo tempo. 8,00 km (Task da 1 a 6). 3 serbatoi di ritenzione saranno ristrutturati, un generatore di corrente sarà acquistato per la stazione di approvvigionamento idrico. I seguenti indicatori saranno presi in considerazione per la rete di lattine e approvvigionamento idrico, nonché per i costi di gestione del progetto, i costi del progetto.Documento del progetto, compresi SW e acquisto di terreni.L'attuazione della fase V consentirà di ottenere un tasso di fognature del comune nella zona dell'agglomerato del 100 %.I seguenti indicatori saranno raggiunti: Numero di persone aggiuntive che utilizzano un migliore trattamento delle acque reflue (RLM) (CI 19)-2,283,numero di persone aggiuntive che utilizzano un migliore approvvigionamento idrico (persone) (CI 18)-1135,Lunghezza della rete fognaria sanitaria costruita (km)-25,09,lunghezza della rete di approvvigionamento idrico costruita (km)-1,70,lunghezza della rete di approvvigionamento idrico ricostruita (km)-8,00.Non prevede się:obiektów adattato alle esigenze delle persone con disabilità, formazione in competenze digitali, costi di alloggio ragionevole per le persone con disabilità, aumento dell'occupazione nelle imprese EPC sostenute e entità EPC sostenute, numero di posti di lavoro ETP mantenuti e posti di lavoro FTE di nuova creazione. (Italian)
15 January 2022
0 references
El objetivo del proyecto es aumentar el porcentaje de la población que utiliza el sistema de tratamiento de aguas residuales de conformidad con la Directiva sobre aguas residuales urbanas. Etapa V del edificio de alcantarillado. Saneamiento.(Tareas 1 a 5) en msc.Porzecze, Bobrza, recepción y parte de δmińska 25,09 km en tym:22,20 de conductos gravitacionales de 2,37 km, canal de presión de 0,52 km. Se construirán 5 estaciones de bombeo de red y 9 estaciones de bombeo de patio trasero. Se ampliará la red de suministro de agua. 1,7 km, y la red de suministro de agua en msc.Bobrza,obje,-mińsk durante mucho tiempo. 8,00 km (Tareas 1 a 6). 3 tanques de retención serán renovados, se comprará un generador de energía para la estación de suministro de agua. Se tendrán en cuenta los siguientes indicadores para la red de latas y suministro de agua. así como los costes de gestión.proyecto, los costes del proyecto.Documento del proyecto.Incluye SW y compra de parcelas.La implementación de la Etapa V permitirá obtener una tasa de alcantarillado del municipio en la zona de la aglomeración del 100 %.Se lograrán los siguientes indicadores: Número de personas adicionales que utilizan un tratamiento mejorado de las aguas residuales (RLM) (CI 19)-2,283,Número de personas adicionales que utilizan un mejor suministro de agua (personas) (CI 18)-1135,Longitud del alcantarillado sanitario construido (km)-25,09,Longitud de la red de suministro de agua construida (km)-1,70,Longitud de la red de suministro de agua reconstruida (km)-8,00.No incluye się:obiektów adaptada a las necesidades de las personas con discapacidad, formación en competencias digitales, coste de ajustes razonables para las personas con discapacidad, aumento del empleo en empresas beneficiarias de la CPE y entidades de CPE apoyadas, número de puestos de trabajo mantenidos en ETC y puestos de trabajo en ETC de reciente creación. (Spanish)
18 January 2022
0 references
Identifiers
RPSW.04.03.00-26-0001/17
0 references