Installation of photovoltaic installation and thermal modernisation of multi-family housing buildings at ul. Maria Konopnicka 9 and 12 in Nowa Sarzyna (Q118757): Difference between revisions
Jump to navigation
Jump to search
(Changed label, description and/or aliases in it, and other parts: Adding Italian translations) |
(Changed label, description and/or aliases in es, and other parts: Adding Spanish translations) |
||||||||||||||
label / es | label / es | ||||||||||||||
Instalación de instalaciones fotovoltaicas y modernización energética de edificios residenciales multifamiliares en ul. Maria Konopnicka 9 y 12 en Nowa Sarzyna | |||||||||||||||
Property / summary | |||||||||||||||
El proyecto se refiere a la modernización energética de edificios residenciales multifamiliares en UL. Maria Konopnicka 9 y 12 en Nowa Sarzyna, y reducción de contaminantes emitidos a la atmósfera desde la zona del municipio de Nowa Sarzyna.En el edificio en ul. Maria Konopnicka 9 está prevista para: 1. Calentamiento de la pared en el suelo, 2. Aislamiento de la pared longitudinal exterior, 3. Calentamiento de la pared superior exterior, 4. Aislamiento de la pared sobre el sótano del suelo, 5. Sustitución de ventanas de madera con una superficie total de 7,82 m² con nuevo PVC, 6. Instalación de celdas fotovoltaicas 2 piezas de celdas con un área total de 3,25 m², potencia 250 W, capacidad de instalación total 0,5 kW, En el edificio en ul. Maria Konopnicka 12 está prevista: 1. Calentamiento de la pared en el suelo, 2. Aislamiento de la pared longitudinal exterior, 3. Calentamiento de la pared superior exterior, 4. Aislamiento de la pared sobre el sótano del suelo, 5. Calentamiento del terreno exterior, 6. Sustitución de la iluminación en la zona común: 48 tubos con una potencia de 20 W, 7. Instalación de celdas fotovoltaicas 4 piezas de celdas con una superficie total de 6,49 m², potencia 250 W, capacidad total de instalación 1 kW. La implementación de la inversión permitirá obtener:(a) en el edificio en ul. Maria Konopnicka 9 del índice EP de 236,98 [kWh/(m²· año)] y la demanda de consumo de energía se reducirá en un 26,12 %,b) en el edificio de ul. Maria Konopnicka 12 del índice del PE de 235,53 [kWh/(m²· año)] y la demanda de consumo de energía se reducirá en un 64,58 %, (Spanish) | |||||||||||||||
Property / summary: El proyecto se refiere a la modernización energética de edificios residenciales multifamiliares en UL. Maria Konopnicka 9 y 12 en Nowa Sarzyna, y reducción de contaminantes emitidos a la atmósfera desde la zona del municipio de Nowa Sarzyna.En el edificio en ul. Maria Konopnicka 9 está prevista para: 1. Calentamiento de la pared en el suelo, 2. Aislamiento de la pared longitudinal exterior, 3. Calentamiento de la pared superior exterior, 4. Aislamiento de la pared sobre el sótano del suelo, 5. Sustitución de ventanas de madera con una superficie total de 7,82 m² con nuevo PVC, 6. Instalación de celdas fotovoltaicas 2 piezas de celdas con un área total de 3,25 m², potencia 250 W, capacidad de instalación total 0,5 kW, En el edificio en ul. Maria Konopnicka 12 está prevista: 1. Calentamiento de la pared en el suelo, 2. Aislamiento de la pared longitudinal exterior, 3. Calentamiento de la pared superior exterior, 4. Aislamiento de la pared sobre el sótano del suelo, 5. Calentamiento del terreno exterior, 6. Sustitución de la iluminación en la zona común: 48 tubos con una potencia de 20 W, 7. Instalación de celdas fotovoltaicas 4 piezas de celdas con una superficie total de 6,49 m², potencia 250 W, capacidad total de instalación 1 kW. La implementación de la inversión permitirá obtener:(a) en el edificio en ul. Maria Konopnicka 9 del índice EP de 236,98 [kWh/(m²· año)] y la demanda de consumo de energía se reducirá en un 26,12 %,b) en el edificio de ul. Maria Konopnicka 12 del índice del PE de 235,53 [kWh/(m²· año)] y la demanda de consumo de energía se reducirá en un 64,58 %, (Spanish) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: El proyecto se refiere a la modernización energética de edificios residenciales multifamiliares en UL. Maria Konopnicka 9 y 12 en Nowa Sarzyna, y reducción de contaminantes emitidos a la atmósfera desde la zona del municipio de Nowa Sarzyna.En el edificio en ul. Maria Konopnicka 9 está prevista para: 1. Calentamiento de la pared en el suelo, 2. Aislamiento de la pared longitudinal exterior, 3. Calentamiento de la pared superior exterior, 4. Aislamiento de la pared sobre el sótano del suelo, 5. Sustitución de ventanas de madera con una superficie total de 7,82 m² con nuevo PVC, 6. Instalación de celdas fotovoltaicas 2 piezas de celdas con un área total de 3,25 m², potencia 250 W, capacidad de instalación total 0,5 kW, En el edificio en ul. Maria Konopnicka 12 está prevista: 1. Calentamiento de la pared en el suelo, 2. Aislamiento de la pared longitudinal exterior, 3. Calentamiento de la pared superior exterior, 4. Aislamiento de la pared sobre el sótano del suelo, 5. Calentamiento del terreno exterior, 6. Sustitución de la iluminación en la zona común: 48 tubos con una potencia de 20 W, 7. Instalación de celdas fotovoltaicas 4 piezas de celdas con una superficie total de 6,49 m², potencia 250 W, capacidad total de instalación 1 kW. La implementación de la inversión permitirá obtener:(a) en el edificio en ul. Maria Konopnicka 9 del índice EP de 236,98 [kWh/(m²· año)] y la demanda de consumo de energía se reducirá en un 26,12 %,b) en el edificio de ul. Maria Konopnicka 12 del índice del PE de 235,53 [kWh/(m²· año)] y la demanda de consumo de energía se reducirá en un 64,58 %, (Spanish) / qualifier | |||||||||||||||
point in time: 18 January 2022
|
Revision as of 10:59, 18 January 2022
Project Q118757 in Poland
Language | Label | Description | Also known as |
---|---|---|---|
English | Installation of photovoltaic installation and thermal modernisation of multi-family housing buildings at ul. Maria Konopnicka 9 and 12 in Nowa Sarzyna |
Project Q118757 in Poland |
Statements
1,065,841.05 zloty
0 references
1,253,930.75 zloty
0 references
85.0 percent
0 references
13 September 2016
0 references
30 June 2018
0 references
WSPÓLNOTA MIESZKANIOWA PRZY UL. MARII KONOPNICKIEJ 9 W NOWEJ SARZYNIE
0 references
Projekt dotyczy modernizacji energetycznej wielorodzinnych budynków mieszkalnych przy ul. Marii Konopnickiej 9 i 12 w Nowej Sarzynie, oraz redukcja zanieczyszczeń emitowanych do atmosfery z obszaru Gminy Nowa Sarzyna.W budynku przy ul. Marii Konopnickiej 9 zaplanowano: 1. Ocieplenie ściany na gruncie, 2. Ocieplenie ściany zewnętrznej podłużnej, 3. Ocieplenie ściany zewnętrznej szczytowej, 4. Ocieplenie ściany nad gruntem-piwnica, 5. Wymiana okien drewnianych o łącznej powierzchni 7,82 m2 na nowe PVC, 6. Instalacja ogniw fotowoltaicznej 2 sztuk ogniw o łącznej powierzchni 3,25 m2, mocy 250 W, łączna moc instalacji 0,5 kW, W budynku przy ul. Marii Konopnickiej 12 zaplanowano: 1. Ocieplenie ściany na gruncie, 2. Ocieplenie ściany zewnętrznej podłużnej, 3. Ocieplenie ściany zewnętrznej szczytowej, 4. Ocieplenie ściany nad gruntem-piwnica, 5. Ocieplenie stropodachu zewnętrznego, 6. Wymiana oświetlenia w części wspólnej: 48 lamp o mocy 20 W, 7. Instalacja ogniw fotowoltaicznej 4 sztuk ogniw o łącznej powierzchni 6,49 m2, mocy 250 W, łączna moc instalacji 1 kW, Realizacja inwestycji pozwoli na uzyskanie:a) w budynku przy ul. Marii Konopnickiej 9 wskaźnika EP na poziomie 236,98 [kWh/(m2 · rok)] oraz zostanie zmniejszone zapotrzebowanie na zużycie energii o 26,12%,b) w budynku przy ul. Marii Konopnickiej 12 wskaźnika EP na poziomie 235,53 [kWh/(m2 · rok)] oraz zostanie zmniejszone zapotrzebowanie na zużycie energii o 64,58%, (Polish)
0 references
The project concerns energy modernisation of multi-family residential buildings at ul. Maria Konopnicka 9 and 12 in Nowa Sarzyna, and reduction of pollution emitted into the atmosphere from the area of Nowa Sarzyna commune. Maria Konopnicka 9 is planned to: 1. Wall warming on the ground, 2. Warming of the outer longitudinal wall, 3. Warming of the outer wall of the summit, 4. Wall warming over the ground- cellar, 5. Replacement of wooden windows with a total area of 7.82 m² for new PVC, 6. Installation of photovoltaic cells 2 units of cells with a total area of 3.25 m², power of 250 W, total installation capacity 0.5 kW, In the building at ul. Maria Konopnicka 12 is planned to: 1. Wall warming on the ground, 2. Warming of the outer longitudinal wall, 3. Warming of the outer wall of the summit, 4. Wall warming over the ground- cellar, 5. External ceiling warming, 6. Replacement of lighting in the common part: 48 tubes with a power output of 20 W, 7. Installation of photovoltaic cells 4 units of cells with a total area of 6.49 m², power of 250 W, total installation capacity of 1 kW, implementation of the investment will allow to obtain:a) in the building at ul. Maria Konopnicka 9 EP index at the level of 236,98 [kWh/(m²· year)] and the demand for energy consumption will be reduced by 26.12 %,b) in the building at ul. Maria Konopnicka 12 EP index of 235,53 [kWh/(m²· year)] and the demand for energy consumption will be reduced by 64,58 %, (English)
20 October 2020
0 references
Le projet concerne la modernisation énergétique des bâtiments résidentiels multifamiliaux à ul. Maria Konopnicka 9 et 12 à Nowa Sarzyna, et la réduction des polluants émis dans l’atmosphère de la zone de la municipalité de Nowa Sarzyna.Dans le bâtiment à ul. Maria Konopnicka 9 est prévue pour: 1. Réchauffement mural sur le sol, 2. Isolation de la paroi longitudinale extérieure, 3. Réchauffement de la paroi supérieure extérieure, 4. Isolation du mur au-dessus du sous-sol, 5. Remplacement des fenêtres en bois d’une surface totale de 7,82 m² par un nouveau PVC, 6. Installation de cellules photovoltaïques 2 pièces de cellules d’une superficie totale de 3,25 m², puissance 250 W, capacité totale d’installation 0,5 kW, Dans le bâtiment à ul. Maria Konopnicka 12 est prévue: 1. Réchauffement mural sur le sol, 2. Isolation de la paroi longitudinale extérieure, 3. Réchauffement de la paroi supérieure extérieure, 4. Isolation du mur au-dessus du sous-sol, 5. Réchauffement du terrain extérieur, 6. Remplacement de l’éclairage dans l’espace commun: 48 tubes d’une puissance de 20 W, 7. Installation de cellules photovoltaïques 4 pièces de cellules d’une superficie totale de 6,49 m², puissance 250 W, capacité totale d’installation 1 kW. La réalisation de l’investissement permettra d’obtenir:a) dans le bâtiment à ul. Maria Konopnicka 9 de l’indice PE de 236,98 [kWh/(m²· an)] et la demande de consommation d’énergie seront réduites de 26,12 %,b) dans le bâtiment à ul. Maria Konopnicka 12 de l’indice PE de 235,53 [kWh/(m²· année)] et la demande de consommation d’énergie sera réduite de 64,58 %, (French)
2 December 2021
0 references
Das Projekt betrifft die Energiemodernisierung von Mehrfamilienwohngebäuden in ul. Maria Konopnicka 9 und 12 in Nowa Sarzyna, und Verringerung der Schadstoffe, die in die Atmosphäre aus dem Gebiet der Gemeinde Nowa Sarzyna.In dem Gebäude in ul. Maria Konopnicka 9 ist geplant für: 1. Wandwärmen auf dem Boden, 2. Isolierung der äußeren Längswand, 3. Erwärmung der äußeren Oberwand, 4. Isolierung der Wand über dem Erdboden, 5. Ersatz von Holzfenstern mit einer Gesamtfläche von 7,82 m² mit neuem PVC, 6. Installation von Photovoltaikzellen 2 Zellen mit einer Gesamtfläche von 3,25 m², Leistung 250 W, Gesamtinstallationskapazität 0,5 kW, Im Gebäude bei ul. Maria Konopnicka 12 ist geplant: 1. Wandwärmen auf dem Boden, 2. Isolierung der äußeren Längswand, 3. Erwärmung der äußeren Oberwand, 4. Isolierung der Wand über dem Erdboden, 5. Erwärmung des äußeren Geländes, 6. Austausch der Beleuchtung im gemeinsamen Bereich: 48 Röhren mit einer Leistung von 20 W, 7. Installation von Fotovoltaikzellen 4 Zellen mit einer Gesamtfläche von 6,49 m², Leistung 250 W, Gesamtinstallationsleistung 1 kW. Die Umsetzung der Investition ermöglicht es, a) im Gebäude in ul. Maria Konopnicka 9 des EP-Index von 236.98 [kWh/(m²· Jahr)] und der Energieverbrauch werden im Gebäude in ul um 26,12 %,b) gesenkt. Maria Konopnicka 12 des EP-Index von 235,53 [kWh/(m²· Jahr)] und der Energieverbrauch um 64,58 % gesenkt werden, (German)
7 December 2021
0 references
Het project heeft betrekking op de energie-modernisering van meergezinswoningen in ul. Maria Konopnicka 9 en 12 in Nowa Sarzyna, en vermindering van verontreinigende stoffen uitgestoten in de atmosfeer uit het gebied van de gemeente Nowa Sarzyna.In het gebouw te ul. Maria Konopnicka 9 is gepland om: 1. Muurverwarming op de grond, 2. Isolatie van de buitenste langswand, 3. Opwarming van de buitenste bovenmuur, 4. Isolatie van de muur boven de grond-kelder, 5. Vervanging van houten ramen met een totale oppervlakte van 7,82 m² met nieuw PVC, 6. Installatie van fotovoltaïsche cellen 2 stukken cellen met een totale oppervlakte van 3,25 m², vermogen 250 W, totale installatiecapaciteit 0,5 kW, In het gebouw te ul. Maria Konopnicka 12 is gepland: 1. Muurverwarming op de grond, 2. Isolatie van de buitenste langswand, 3. Opwarming van de buitenste bovenmuur, 4. Isolatie van de muur boven de grond-kelder, 5. Opwarming van het buitenste terrein, 6. Vervanging van verlichting in de gemeenschappelijke ruimte: 48 buizen met een vermogen van 20 W, 7. Installatie van fotovoltaïsche cellen 4 stuks cellen met een totale oppervlakte van 6,49 m², vermogen 250 W, totale installatiecapaciteit 1 kW. De uitvoering van de investering maakt het mogelijk:a) in het gebouw te ul. Maria Konopnicka 9 van de EP-index van 236,98 [kWh/(m²· jaar)] en de vraag naar energie zal met 26,12 % worden verminderd,b) in het gebouw te ul. Maria Konopnicka 12 van de EP-index van 235,53 [kWh/(m²· jaar)] en de vraag naar energie zal met 64,58 % worden verminderd, (Dutch)
17 December 2021
0 references
Il progetto riguarda la modernizzazione energetica di edifici residenziali plurifamiliari a ul. Maria Konopnicka 9 e 12 a Nowa Sarzyna, e riduzione degli inquinanti emessi nell'atmosfera dalla zona del Comune di Nowa Sarzyna.Nel edificio a ul. Maria Konopnicka 9 è prevista per: 1. Riscaldamento della parete a terra, 2. Isolamento della parete longitudinale esterna, 3. Riscaldamento della parete superiore esterna, 4. Isolamento della parete al di sopra del seminterrato, 5. Sostituzione di finestre in legno con una superficie totale di 7,82 m² con nuovo PVC, 6. Installazione di celle fotovoltaiche 2 pezzi di celle con una superficie totale di 3,25 m², potenza 250 W, capacità di installazione totale 0,5 kW, nell'edificio a ul. Maria Konopnicka 12 è prevista: 1. Riscaldamento della parete a terra, 2. Isolamento della parete longitudinale esterna, 3. Riscaldamento della parete superiore esterna, 4. Isolamento della parete al di sopra del seminterrato, 5. Riscaldamento del terreno esterno, 6. Sostituzione dell'illuminazione nell'area comune: 48 tubi con una potenza di 20 W, 7. Installazione di celle fotovoltaiche 4 pezzi di celle con una superficie totale di 6,49 m², potenza 250 W, capacità di installazione totale 1 kW. L'attuazione dell'investimento consentirà di ottenere:a) nell'edificio a ul. Maria Konopnicka 9 dell'indice del PE di 236,98 [kWh/(m²· anno)] e la domanda di consumo di energia sarà ridotta del 26,12 %,b) nell'edificio a ul. Maria Konopnicka 12 dell'indice del PE di 235,53 [kWh/(m²· anno)] e la domanda di consumo energetico sarà ridotta del 64,58 %, (Italian)
15 January 2022
0 references
El proyecto se refiere a la modernización energética de edificios residenciales multifamiliares en UL. Maria Konopnicka 9 y 12 en Nowa Sarzyna, y reducción de contaminantes emitidos a la atmósfera desde la zona del municipio de Nowa Sarzyna.En el edificio en ul. Maria Konopnicka 9 está prevista para: 1. Calentamiento de la pared en el suelo, 2. Aislamiento de la pared longitudinal exterior, 3. Calentamiento de la pared superior exterior, 4. Aislamiento de la pared sobre el sótano del suelo, 5. Sustitución de ventanas de madera con una superficie total de 7,82 m² con nuevo PVC, 6. Instalación de celdas fotovoltaicas 2 piezas de celdas con un área total de 3,25 m², potencia 250 W, capacidad de instalación total 0,5 kW, En el edificio en ul. Maria Konopnicka 12 está prevista: 1. Calentamiento de la pared en el suelo, 2. Aislamiento de la pared longitudinal exterior, 3. Calentamiento de la pared superior exterior, 4. Aislamiento de la pared sobre el sótano del suelo, 5. Calentamiento del terreno exterior, 6. Sustitución de la iluminación en la zona común: 48 tubos con una potencia de 20 W, 7. Instalación de celdas fotovoltaicas 4 piezas de celdas con una superficie total de 6,49 m², potencia 250 W, capacidad total de instalación 1 kW. La implementación de la inversión permitirá obtener:(a) en el edificio en ul. Maria Konopnicka 9 del índice EP de 236,98 [kWh/(m²· año)] y la demanda de consumo de energía se reducirá en un 26,12 %,b) en el edificio de ul. Maria Konopnicka 12 del índice del PE de 235,53 [kWh/(m²· año)] y la demanda de consumo de energía se reducirá en un 64,58 %, (Spanish)
18 January 2022
0 references
Identifiers
RPPK.03.02.00-18-0134/16
0 references