CONSTRUCTION OF PUBLIC LIGHTING USING ENERGY-SAVING AND ECOLOGICAL EQUIPMENT IN THE MUNICIPALITY OF SŁAWNO (Q102008): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in it, and other parts: Adding Italian translations)
(‎Changed label, description and/or aliases in es, and other parts: Adding Spanish translations)
label / eslabel / es
 
CONSTRUCCIÓN DE ALUMBRADO PÚBLICO UTILIZANDO EQUIPOS ECOLÓGICOS Y DE AHORRO DE ENERGÍA EN EL MUNICIPIO DE SŁAWNO
Property / summary
 
EL PROYECTO CONSISTE EN LA CONSTRUCCIÓN DE ALUMBRADO PÚBLICO CON EL USO DE DISPOSITIVOS EFICIENTES DESDE EL PUNTO DE VISTA ENERGÉTICO Y RESPETUOSOS CON EL MEDIO AMBIENTE EN LOS TRAMOS: • SZADKOWICE — ANTONIÓWKA: 17 PUNTOS DE LUZ CON LUMINARIAS DE TIPO LED Y 2 CARACTERES ACTIVOS ALIMENTADOS DESDE EL MÓDULO FOTOVOLTAICO • PANS-PIEDRAS: 29 PUNTOS DE LUZ CON LUMINARIAS LED • PRIMUS: SE CONSTRUIRÁN 33 PUNTOS DE ILUMINACIÓN CON LUMINARIAS DE TIPO LED JUNTO CON 79 PUNTOS DE ILUMINACIÓN CON LUMINARIAS DE TIPO LED Y 2 SEÑALES ACTIVAS PROPULSADAS POR EL MÓDULO FOTOVOLTAICO (RES), LA INVERSIÓN PREVISTA FORMA PARTE DE UN PROYECTO DE INFRAESTRUCTURA MÁS AMPLIO, EJECUTADO EN PARALELO Y FINANCIADO POR EL BENEFICIARIO, MÁS EN EL PUNTO. 6.6 AGUA. ALTOS COSTES DE ILUMINACIÓN ACTUALES PARA LAS INSTALACIONES DE SERVICIOS PÚBLICOS: • GENERAN ALTOS COSTES DE ILUMINACIÓN • AUMENTAR LA CONTAMINACIÓN AMBIENTAL • LOS ELEVADOS COSTES DE ILUMINACIÓN NO AUMENTAN EN PROPORCIÓN A LAS NECESIDADES DE NUEVAS INVERSIONES • ESTÁN RELACIONADOS CON LA INFRAUTILIZACIÓN DE SISTEMAS EFICIENTES DESDE EL PUNTO DE VISTA ENERGÉTICO Y RESPETUOSOS CON EL MEDIO AMBIENTE (RES). LAS ACCIONES NECESARIAS QUE DEBEN EJECUTARSE SON LAS SIGUIENTES: TAREAS: 1. CONSTRUCCIÓN DE ALUMBRADO PÚBLICO CON EQUIPOS ECOLÓGICOS Y DE AHORRO ENERGÉTICO EN LAS LOCALIDADES DE SZADKOWICE Y ANTONIÓWKA. 2. CONSTRUCCIÓN DE ALUMBRADO PÚBLICO CON EL USO DE DISPOSITIVOS DE AHORRO DE ENERGÍA EN LAS CIUDADES DE DESPENSA Y PIEDRA. 3. CONSTRUCCIÓN DE ALUMBRADO PÚBLICO UTILIZANDO DISPOSITIVOS DE AHORRO DE ENERGÍA EN PRYMUSOWA. 4. PROMOCIÓN DEL PROYECTO. 5. SUPERVISIÓN DEL INVERSOR. REQUISITOS TÉCNICOS DETALLADOS. ESTÁN EN SW ROZ. 4 E INCL. 3. OBJETIVOS: LA EJECUCIÓN DEL PROYECTO ALCANZARÁ EL OBJETIVO PRINCIPAL DEL PROYECTO, I.E. AUMENTAR EL AHORRO DE ENERGÍA Y MEJORAR LA LIMPIEZA DEL AIRE EN EL MUNICIPIO DE SŁAWNO. GRUPO DESTINATARIO: DIRECTO: RESIDENTES DEL MUNICIPIO DE SŁAWNO, TRANSEÚNTES, UTILIZANDO INFRAESTRUCTURAS PÚBLICAS Y TURISTAS QUE VISITAN EL MUNICIPIO DE SŁAWNO (Spanish)
Property / summary: EL PROYECTO CONSISTE EN LA CONSTRUCCIÓN DE ALUMBRADO PÚBLICO CON EL USO DE DISPOSITIVOS EFICIENTES DESDE EL PUNTO DE VISTA ENERGÉTICO Y RESPETUOSOS CON EL MEDIO AMBIENTE EN LOS TRAMOS: • SZADKOWICE — ANTONIÓWKA: 17 PUNTOS DE LUZ CON LUMINARIAS DE TIPO LED Y 2 CARACTERES ACTIVOS ALIMENTADOS DESDE EL MÓDULO FOTOVOLTAICO • PANS-PIEDRAS: 29 PUNTOS DE LUZ CON LUMINARIAS LED • PRIMUS: SE CONSTRUIRÁN 33 PUNTOS DE ILUMINACIÓN CON LUMINARIAS DE TIPO LED JUNTO CON 79 PUNTOS DE ILUMINACIÓN CON LUMINARIAS DE TIPO LED Y 2 SEÑALES ACTIVAS PROPULSADAS POR EL MÓDULO FOTOVOLTAICO (RES), LA INVERSIÓN PREVISTA FORMA PARTE DE UN PROYECTO DE INFRAESTRUCTURA MÁS AMPLIO, EJECUTADO EN PARALELO Y FINANCIADO POR EL BENEFICIARIO, MÁS EN EL PUNTO. 6.6 AGUA. ALTOS COSTES DE ILUMINACIÓN ACTUALES PARA LAS INSTALACIONES DE SERVICIOS PÚBLICOS: • GENERAN ALTOS COSTES DE ILUMINACIÓN • AUMENTAR LA CONTAMINACIÓN AMBIENTAL • LOS ELEVADOS COSTES DE ILUMINACIÓN NO AUMENTAN EN PROPORCIÓN A LAS NECESIDADES DE NUEVAS INVERSIONES • ESTÁN RELACIONADOS CON LA INFRAUTILIZACIÓN DE SISTEMAS EFICIENTES DESDE EL PUNTO DE VISTA ENERGÉTICO Y RESPETUOSOS CON EL MEDIO AMBIENTE (RES). LAS ACCIONES NECESARIAS QUE DEBEN EJECUTARSE SON LAS SIGUIENTES: TAREAS: 1. CONSTRUCCIÓN DE ALUMBRADO PÚBLICO CON EQUIPOS ECOLÓGICOS Y DE AHORRO ENERGÉTICO EN LAS LOCALIDADES DE SZADKOWICE Y ANTONIÓWKA. 2. CONSTRUCCIÓN DE ALUMBRADO PÚBLICO CON EL USO DE DISPOSITIVOS DE AHORRO DE ENERGÍA EN LAS CIUDADES DE DESPENSA Y PIEDRA. 3. CONSTRUCCIÓN DE ALUMBRADO PÚBLICO UTILIZANDO DISPOSITIVOS DE AHORRO DE ENERGÍA EN PRYMUSOWA. 4. PROMOCIÓN DEL PROYECTO. 5. SUPERVISIÓN DEL INVERSOR. REQUISITOS TÉCNICOS DETALLADOS. ESTÁN EN SW ROZ. 4 E INCL. 3. OBJETIVOS: LA EJECUCIÓN DEL PROYECTO ALCANZARÁ EL OBJETIVO PRINCIPAL DEL PROYECTO, I.E. AUMENTAR EL AHORRO DE ENERGÍA Y MEJORAR LA LIMPIEZA DEL AIRE EN EL MUNICIPIO DE SŁAWNO. GRUPO DESTINATARIO: DIRECTO: RESIDENTES DEL MUNICIPIO DE SŁAWNO, TRANSEÚNTES, UTILIZANDO INFRAESTRUCTURAS PÚBLICAS Y TURISTAS QUE VISITAN EL MUNICIPIO DE SŁAWNO (Spanish) / rank
 
Normal rank
Property / summary: EL PROYECTO CONSISTE EN LA CONSTRUCCIÓN DE ALUMBRADO PÚBLICO CON EL USO DE DISPOSITIVOS EFICIENTES DESDE EL PUNTO DE VISTA ENERGÉTICO Y RESPETUOSOS CON EL MEDIO AMBIENTE EN LOS TRAMOS: • SZADKOWICE — ANTONIÓWKA: 17 PUNTOS DE LUZ CON LUMINARIAS DE TIPO LED Y 2 CARACTERES ACTIVOS ALIMENTADOS DESDE EL MÓDULO FOTOVOLTAICO • PANS-PIEDRAS: 29 PUNTOS DE LUZ CON LUMINARIAS LED • PRIMUS: SE CONSTRUIRÁN 33 PUNTOS DE ILUMINACIÓN CON LUMINARIAS DE TIPO LED JUNTO CON 79 PUNTOS DE ILUMINACIÓN CON LUMINARIAS DE TIPO LED Y 2 SEÑALES ACTIVAS PROPULSADAS POR EL MÓDULO FOTOVOLTAICO (RES), LA INVERSIÓN PREVISTA FORMA PARTE DE UN PROYECTO DE INFRAESTRUCTURA MÁS AMPLIO, EJECUTADO EN PARALELO Y FINANCIADO POR EL BENEFICIARIO, MÁS EN EL PUNTO. 6.6 AGUA. ALTOS COSTES DE ILUMINACIÓN ACTUALES PARA LAS INSTALACIONES DE SERVICIOS PÚBLICOS: • GENERAN ALTOS COSTES DE ILUMINACIÓN • AUMENTAR LA CONTAMINACIÓN AMBIENTAL • LOS ELEVADOS COSTES DE ILUMINACIÓN NO AUMENTAN EN PROPORCIÓN A LAS NECESIDADES DE NUEVAS INVERSIONES • ESTÁN RELACIONADOS CON LA INFRAUTILIZACIÓN DE SISTEMAS EFICIENTES DESDE EL PUNTO DE VISTA ENERGÉTICO Y RESPETUOSOS CON EL MEDIO AMBIENTE (RES). LAS ACCIONES NECESARIAS QUE DEBEN EJECUTARSE SON LAS SIGUIENTES: TAREAS: 1. CONSTRUCCIÓN DE ALUMBRADO PÚBLICO CON EQUIPOS ECOLÓGICOS Y DE AHORRO ENERGÉTICO EN LAS LOCALIDADES DE SZADKOWICE Y ANTONIÓWKA. 2. CONSTRUCCIÓN DE ALUMBRADO PÚBLICO CON EL USO DE DISPOSITIVOS DE AHORRO DE ENERGÍA EN LAS CIUDADES DE DESPENSA Y PIEDRA. 3. CONSTRUCCIÓN DE ALUMBRADO PÚBLICO UTILIZANDO DISPOSITIVOS DE AHORRO DE ENERGÍA EN PRYMUSOWA. 4. PROMOCIÓN DEL PROYECTO. 5. SUPERVISIÓN DEL INVERSOR. REQUISITOS TÉCNICOS DETALLADOS. ESTÁN EN SW ROZ. 4 E INCL. 3. OBJETIVOS: LA EJECUCIÓN DEL PROYECTO ALCANZARÁ EL OBJETIVO PRINCIPAL DEL PROYECTO, I.E. AUMENTAR EL AHORRO DE ENERGÍA Y MEJORAR LA LIMPIEZA DEL AIRE EN EL MUNICIPIO DE SŁAWNO. GRUPO DESTINATARIO: DIRECTO: RESIDENTES DEL MUNICIPIO DE SŁAWNO, TRANSEÚNTES, UTILIZANDO INFRAESTRUCTURAS PÚBLICAS Y TURISTAS QUE VISITAN EL MUNICIPIO DE SŁAWNO (Spanish) / qualifier
 
point in time: 18 January 2022
Timestamp+2022-01-18T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 06:37, 18 January 2022

Project Q102008 in Poland
Language Label Description Also known as
English
CONSTRUCTION OF PUBLIC LIGHTING USING ENERGY-SAVING AND ECOLOGICAL EQUIPMENT IN THE MUNICIPALITY OF SŁAWNO
Project Q102008 in Poland

    Statements

    0 references
    383,214.94 zloty
    0 references
    91,971.59 Euro
    13 January 2020
    0 references
    451,372.13 zloty
    0 references
    108,329.31 Euro
    13 January 2020
    0 references
    84.9 percent
    0 references
    1 March 2017
    0 references
    30 November 2017
    0 references
    GMINA SŁAWNO
    0 references
    0 references

    51°23'31.2"N, 20°8'23.6"E
    0 references
    PROJEKT POLEGA NA BUDOWIE OŚWIETLENIA PUBLICZNEGO Z WYKORZYSTANIEM URZĄDZEŃ ENERGOOSZCZĘDNYCH I EKOLOGICZNYCH NA ODCINKACH: • SZADKOWICE – ANTONIÓWKA: 17 PUNKTÓW ŚWIETLNYCH Z OPRAWAMI TYPU LED I 2 ZNAKI AKTYWNE ZASILANE Z MODUŁU FOTOWOLTAICZNEGO • BRATKÓW-KAMIEŃ: 29 PUNKTY ŚWIETLNE Z OPRAWAMI TYPU LED • PRYMUSOWA WOLA: 33 PUNKTY ŚWIETLNE Z OPRAWAMI TYPU LED ŁĄCZNIE WYBUDOWANE ZOSTANĄ 79 PUNKTY ŚWIETLNE Z OPRAWAMI TYPU LED ORAZ 2 ZNAKI AKTYWNE ZASILANE Z MODUŁU FOTOWOLTAICZNEGO (OZE) PLANOWANA INWESTYCJA JEST ELEMENTEM SZERSZEGO PROJEKTU INFRASTRUKTURALNEGO, RÓWNOLEGLE REALIZOWANEGO I FINANSOWANEGO PRZEZ BENEFICJENTA – WIĘCEJ W PKT. 6.6 WOD. OBECNE WYSOKIE KOSZTY OŚWIETLANIA MIEJSC UŻYTECZNOŚCI PUBLICZNEJ: • GENERUJĄ WYSOKIE KOSZTY OŚWIETLANIA • ZWIĘKSZAJĄ ZANIECZYSZCZANIE ŚRODOWISKA • WYSOKIE KOSZTY OŚWIETLANIA POWODUJĄ, IŻ NIE WZRASTA PROPORCJONALNIE DO POTRZEB LICZBA NOWYCH INWESTYCJI • ZWIĄZANE SĄ Z NIEWYKORZYSTANIEM SYSTEMÓW ENERGOOSZCZĘDNYCH I EKOLOGICZNYCH (OZE). NIEZBĘDNE DZIAŁANIA JAKIE NALEŻY WDROŻYĆ TO: ZADANIA: 1. BUDOWA OŚWIETLENIA PUBLICZNEGO Z WYKORZYSTANIEM URZĄDZEŃ ENERGOOSZCZĘDNYCH I EKOLOGICZNYCH W MIEJSCOWOŚCIACH SZADKOWICE I ANTONIÓWKA. 2. BUDOWA OŚWIETLENIA PUBLICZNEGO Z WYKORZYSTANIEM URZĄDZEŃ ENERGOOSZCZĘDNYCH W MIEJSCOWOŚCIACH BRATKÓW I KAMIEŃ. 3. BUDOWA OŚWIETLENIA PUBLICZNEGO Z WYKORZYSTANIEM URZĄDZEŃ ENERGOOSZCZĘDNYCH W MIEJSCOWOŚCI PRYMUSOWA WOLA. 4. PROMOCJA PROJEKTU. 5. NADZÓR INWESTORSKI. SZCZEGÓŁOWE WYMAGANIA TECHNICZ. ZNAJDUJĄ SIĘ W SW ROZ. 4 ORAZ W ZAŁ. 3. CELE: DZIĘKI REALIZACJI PROJEKTU SPEŁNIONY ZOSTANIE CEL GŁÓWNY PROJEKTU TJ. ZWIĘKSZANIE OSZCZĘDNOŚCI ENERGII ORAZ POPRAWA CZYSTOŚCI POWIETRZA W GMINIE SŁAWNO. GRUPA DOCELOWA: BEZPOŚREDNIA: MIESZKAŃCY GMINY SŁAWNO, OSOBY PRZEJEZDNE, KORZYSTAJĄCE Z INFRASTRUKTURY PUBLICZNEJ ORAZ TURYŚCI ODWIEDZAJĄCY GMINĘ SŁAWNO (Polish)
    0 references
    THE PROJECT CONSISTS OF THE CONSTRUCTION OF PUBLIC LIGHTING USING ENERGY-SAVING AND ECOLOGICAL EQUIPMENT ON SECTIONS: • SZADKOWICE – ANTONIÓWKA: 17 LIGHT POINTS WITH LED LUMINAIRES AND 2 ACTIVE CHARACTERS POWERED FROM THE PHOTOVOLTAIC MODULE • FRATERNAL STONES: 29 LIGHT POINTS WITH LED LUMINAIRES • PRIMITIVE WILL: 33 LIGHT POINTS WITH LED LUMINAIRES WILL BE BUILT IN TOTAL 79 LIGHT POINTS WITH LED LUMINAIRES AND 2 ACTIVE SIGNS POWERED FROM THE PHOTOVOLTAIC MODULE (RES) THE PLANNED INVESTMENT IS PART OF A WIDER INFRASTRUCTURE PROJECT, SIMULTANEOUSLY IMPLEMENTED AND FINANCED BY THE BENEFICIARY – MORE IN POINT. 6,6 WATER. CURRENT HIGH COSTS FOR LIGHTING PUBLIC PLACES: • GENERATE HIGH LIGHTING COSTS • INCREASE POLLUTION • HIGH LIGHTING COSTS CAUSE THAT THE NUMBER OF NEW INVESTMENTS DOES NOT INCREASE IN PROPORTION TO THE NEEDS • ARE RELATED TO THE UNUSED ENERGY-EFFICIENT AND ENVIRONMENTALLY FRIENDLY SYSTEMS (RES). THE NECESSARY MEASURES TO BE IMPLEMENTED ARE: TASKS: 1. CONSTRUCTION OF PUBLIC LIGHTING USING ENERGY-SAVING AND ECOLOGICAL EQUIPMENT IN THE TOWNS OF SZADKOWICE AND ANTONIÓWKA. 2. CONSTRUCTION OF PUBLIC LIGHTING USING ENERGY-SAVING DEVICES IN THE VILLAGES AND STONE. 3. CONSTRUCTION OF PUBLIC LIGHTING USING ENERGY-SAVING DEVICES IN THE VILLAGE OF PRYMUSOWA WILL. 4. PROMOTION OF THE PROJECT. 5. IT’S INVESTOR SUPERVISION. SPECIFIC TECHNICAL REQUIREMENTS. THEY'RE IN SW ROZ. 4 AND. 3. OBJECTIVES: THROUGH THE IMPLEMENTATION OF THE PROJECT, THE MAIN OBJECTIVE OF THE PROJECT WILL BE MET, I.E. INCREASING ENERGY SAVINGS AND IMPROVING AIR PURITY IN THE MUNICIPALITY OF SŁAWNO. TARGET GROUP: DIRECT: RESIDENTS OF THE MUNICIPALITY OF SŁAWNO, PASSERS-BY, USING PUBLIC INFRASTRUCTURE AND TOURISTS VISITING THE MUNICIPALITY OF SŁAWNO (English)
    17 October 2020
    0 references
    LE PROJET CONSISTE À CONSTRUIRE UN ÉCLAIRAGE PUBLIC AVEC L’UTILISATION D’APPAREILS ÉCONOMES EN ÉNERGIE ET RESPECTUEUX DE L’ENVIRONNEMENT SUR DES TRONÇONS: • SZADKOWICE — ANTONIÓWKA: 17 POINTS LUMINEUX AVEC LUMINAIRES DE TYPE LED ET 2 CARACTÈRES ACTIFS ALIMENTÉS PAR LE MODULE PHOTOVOLTAÏQUE • PANS-STONES: 29 POINTS LUMINEUX AVEC LUMINAIRES LED • PRIMUS: L’INVESTISSEMENT PRÉVU S’INSCRIT DANS LE CADRE D’UN PROJET D’INFRASTRUCTURE PLUS VASTE, MIS EN ŒUVRE EN PARALLÈLE ET FINANCÉ PAR LE BÉNÉFICIAIRE — PLUS EN POINT — AVEC 33 POINTS D’ÉCLAIRAGE ÉQUIPÉS DE LUMINAIRES À LED, AINSI QUE 79 POINTS D’ÉCLAIRAGE AVEC DES LUMINAIRES À LED ET 2 PANNEAUX ACTIFS ALIMENTÉS PAR LE MODULE PHOTOVOLTAÏQUE (RES). 6.6 EAU. COÛTS ACTUELS ÉLEVÉS D’ÉCLAIRAGE POUR LES SITES D’UTILITÉ PUBLIQUE: • ILS GÉNÈRENT DES COÛTS D’ÉCLAIRAGE ÉLEVÉS • AUGMENTENT LA POLLUTION DE L’ENVIRONNEMENT • LES COÛTS ÉLEVÉS DE L’ÉCLAIRAGE N’AUGMENTENT PAS PROPORTIONNELLEMENT AUX BESOINS DES NOUVEAUX INVESTISSEMENTS • SONT LIÉS À LA SOUS-UTILISATION DE SYSTÈMES ÉCONOMES EN ÉNERGIE ET RESPECTUEUX DE L’ENVIRONNEMENT (SER). LES ACTIONS NÉCESSAIRES À METTRE EN ŒUVRE SONT LES SUIVANTES: TÂCHES: 1. CONSTRUCTION D’ÉCLAIRAGE PUBLIC À L’AIDE D’ÉQUIPEMENTS ÉCONOMES EN ÉNERGIE ET ÉCOLOGIQUES DANS LES VILLES DE SZADKOWICE ET ANTONIÓWKA. 2. CONSTRUCTION D’ÉCLAIRAGE PUBLIC AVEC L’UTILISATION DE DISPOSITIFS D’ÉCONOMIE D’ÉNERGIE DANS LES VILLES DE GARDE-MANGER ET DE PIERRE. 3. LA CONSTRUCTION D’ÉCLAIRAGE PUBLIC À L’AIDE DE DISPOSITIFS D’ÉCONOMIE D’ÉNERGIE À PRYMUSOWA. 4. PROMOTION DU PROJET. 5. SURVEILLANCE DES INVESTISSEURS. EXIGENCES TECHNIQUES DÉTAILLÉES. ILS SONT AU SW ROZ. 4 ET INCL. 3. OBJECTIFS: LA MISE EN ŒUVRE DU PROJET PERMETTRA D’ATTEINDRE L’OBJECTIF PRINCIPAL DU PROJET, I.E. ACCROÎTRE LES ÉCONOMIES D’ÉNERGIE ET AMÉLIORER LA PROPRETÉ DE L’AIR DANS LA MUNICIPALITÉ DE SŁAWNO. GROUPE CIBLE: DIRECT: RÉSIDENTS DE LA MUNICIPALITÉ DE SŁAWNO, PASSANTS, UTILISANT LES INFRASTRUCTURES PUBLIQUES ET LES TOURISTES VISITANT LA MUNICIPALITÉ DE SŁAWNO (French)
    1 December 2021
    0 references
    DAS PROJEKT UMFASST DEN BAU EINER ÖFFENTLICHEN BELEUCHTUNG MIT DEM EINSATZ ENERGIEEFFIZIENTER UND UMWELTFREUNDLICHER GERÄTE AUF ABSCHNITTEN: • SZADKOWICE – ANTONIÓWKA: 17 LICHTPUNKTE MIT LED-LEUCHTEN UND 2 AKTIVEN ZEICHEN AUS DEM PHOTOVOLTAIK-MODUL • PANS-STONES: 29 LICHTPUNKTE MIT LED-LEUCHTEN • PRIMUS WIRD: 33 BELEUCHTUNGSPUNKTE MIT LED-LEUCHTEN WERDEN ZUSAMMEN MIT 79 BELEUCHTUNGSPUNKTEN MIT LED-LEUCHTEN UND 2 AKTIVEN SCHILDERN MIT DEM PHOTOVOLTAIK-MODUL (RES) GEBAUT. DIE GEPLANTE INVESTITION IST TEIL EINES GRÖSSEREN INFRASTRUKTURPROJEKTS, DAS PARALLEL DURCHGEFÜHRT UND VOM BEGÜNSTIGTEN FINANZIERT WIRD – MEHR DAZU. 6.6 WASSER. DERZEIT HOHE BELEUCHTUNGSKOSTEN FÜR ÖFFENTLICHE VERSORGUNGSANLAGEN: • SIE VERURSACHEN HOHE BELEUCHTUNGSKOSTEN • ERHÖHUNG DER UMWELTVERSCHMUTZUNG • HOHE BELEUCHTUNGSKOSTEN STEIGEN NICHT IM VERHÄLTNIS ZUM BEDARF NEUER INVESTITIONEN • STEHEN IM ZUSAMMENHANG MIT DER UNZUREICHENDEN NUTZUNG ENERGIEEFFIZIENTER UND UMWELTFREUNDLICHER SYSTEME (RES). DIE DURCHZUFÜHRENDEN MASSNAHMEN SIND: AUFGABEN: 1. BAU ÖFFENTLICHER BELEUCHTUNG MIT ENERGIESPARENDER UND ÖKOLOGISCHER AUSSTATTUNG IN DEN STÄDTEN SZADKOWICE UND ANTONIÓWKA. 2. BAU DER ÖFFENTLICHEN BELEUCHTUNG MIT DEM EINSATZ VON ENERGIESPARENDEN GERÄTEN IN DEN STÄDTEN SPEISEKAMMER UND STEIN. 3. BAU ÖFFENTLICHER BELEUCHTUNG MIT ENERGIESPARGERÄTEN IN PRYMUSOWA. 4. FÖRDERUNG DES PROJEKTS. 5. AUFSICHT DER ANLEGER. DETAILLIERTE TECHNISCHE ANFORDERUNGEN. SIE SIND IN SW ROZ. 4 UND INKL. 3. ZIELE: DIE DURCHFÜHRUNG DES PROJEKTS WIRD DAS HAUPTZIEL DES PROJEKTS, I.E. ERHÖHUNG DER ENERGIEEINSPARUNGEN UND VERBESSERUNG DER LUFTREINHALTUNG IN DER GEMEINDE SŁAWNO. ZIELGRUPPE: DIREKT: EINWOHNER DER GEMEINDE SŁAWNO, PASSANTEN, DIE ÖFFENTLICHE INFRASTRUKTUR NUTZEN UND TOURISTEN BESUCHEN DIE GEMEINDE SŁAWNO (German)
    7 December 2021
    0 references
    HET PROJECT BESTAAT UIT DE BOUW VAN OPENBARE VERLICHTING MET HET GEBRUIK VAN ENERGIEZUINIGE EN MILIEUVRIENDELIJKE APPARATEN OP SECTIES: • SZADKOWICE — ANTONIÓWKA: 17 LICHTPUNTEN MET LED-TYPE ARMATUREN EN 2 ACTIEVE TEKENS AANGEDREVEN UIT DE FOTOVOLTAÏSCHE MODULE • PANNEN-STENEN: 29 LICHTPUNTEN MET LEDARMATUREN • PRIMUS ZAL: 33 VERLICHTINGSPUNTEN MET LED-ARMATUREN WORDEN GEBOUWD SAMEN MET 79 VERLICHTINGSPUNTEN MET LED-ACHTIGE ARMATUREN EN 2 ACTIEVE TEKENS AANGEDREVEN DOOR DE FOTOVOLTAÏSCHE MODULE (RES) DE GEPLANDE INVESTERING MAAKT DEEL UIT VAN EEN BREDER INFRASTRUCTUURPROJECT, DAT PARALLEL WORDT UITGEVOERD EN DOOR DE BEGUNSTIGDE WORDT GEFINANCIERD — MEER IN PUNT. 6,6 WATER. HUIDIGE HOGE VERLICHTINGSKOSTEN VOOR OPENBARE NUTSVOORZIENINGEN: • ZIJ LEIDEN TOT HOGE VERLICHTINGSKOSTEN • VERHOGING VAN DE MILIEUVERVUILING • HOGE VERLICHTINGSKOSTEN STIJGEN NIET IN VERHOUDING TOT DE BEHOEFTEN VAN NIEUWE INVESTERINGEN • HOUDEN VERBAND MET HET ONDERBENUTTE GEBRUIK VAN ENERGIE-EFFICIËNTE EN MILIEUVRIENDELIJKE SYSTEMEN (RES). DE UIT TE VOEREN ACTIES ZIJN: TAKEN: 1. BOUW VAN OPENBARE VERLICHTING MET BEHULP VAN ENERGIEBESPARENDE EN ECOLOGISCHE APPARATUUR IN DE STEDEN SZADKOWICE EN ANTONIÓWKA. 2. BOUW VAN OPENBARE VERLICHTING MET BEHULP VAN ENERGIEBESPARENDE APPARATEN IN DE STEDEN VAN PANTRY EN STEEN. 3. BOUW VAN OPENBARE VERLICHTING MET BEHULP VAN ENERGIEBESPARENDE APPARATEN IN PRYMUSOWA ZAL. 4. BEVORDERING VAN HET PROJECT. 5. TOEZICHT OP BELEGGERS. GEDETAILLEERDE TECHNISCHE VOORSCHRIFTEN. ZE ZIJN IN SW ROZ. 4 EN INCL. 3. DOELSTELLINGEN: DE UITVOERING VAN HET PROJECT ZAL DE HOOFDDOELSTELLING VAN HET PROJECT BEREIKEN, I.E. VERHOGING VAN DE ENERGIEBESPARING EN VERBETERING VAN DE LUCHTZUIVERHEID IN DE GEMEENTE SŁAWNO. DOELGROEP: RECHTSTREEKS: INWONERS VAN DE GEMEENTE SŁAWNO, VOORBIJGANGERS, DIE GEBRUIK MAKEN VAN OPENBARE INFRASTRUCTUUR EN TOERISTEN DIE DE GEMEENTE SŁAWNO BEZOEKEN (Dutch)
    17 December 2021
    0 references
    IL PROGETTO CONSISTE NELLA COSTRUZIONE DELL'ILLUMINAZIONE PUBBLICA CON L'UTILIZZO DI DISPOSITIVI EFFICIENTI SOTTO IL PROFILO ENERGETICO ED ECO-COMPATIBILI SU SEZIONI: • SZADKOWICE — ANTONIÓWKA: 17 PUNTI LUCE CON APPARECCHI A LED E 2 CARATTERI ATTIVI ALIMENTATI DAL MODULO FOTOVOLTAICO • PANS-STONE: 29 PUNTI LUCE CON APPARECCHI A LED • PRIMUS: 33 PUNTI DI ILLUMINAZIONE CON APPARECCHI DI TIPO LED SARANNO COSTRUITI INSIEME A 79 PUNTI DI ILLUMINAZIONE CON APPARECCHI DI TIPO LED E 2 SEGNALI ATTIVI ALIMENTATI DAL MODULO FOTOVOLTAICO (RES) L'INVESTIMENTO PREVISTO FA PARTE DI UN PROGETTO INFRASTRUTTURALE PIÙ AMPIO, ATTUATO IN PARALLELO E FINANZIATO DAL BENEFICIARIO — PIÙ PRECISAMENTE. 6.6 ACQUA. COSTI DI ILLUMINAZIONE ATTUALMENTE ELEVATI PER I SITI DI PUBBLICA UTILITÀ: • GENERANO COSTI DI ILLUMINAZIONE ELEVATI • AUMENTO DELL'INQUINAMENTO AMBIENTALE • ELEVATI COSTI DI ILLUMINAZIONE NON AUMENTANO IN PROPORZIONE ALLE ESIGENZE DI NUOVI INVESTIMENTI • SONO LEGATI AL SOTTOUTILIZZO DI SISTEMI EFFICIENTI SOTTO IL PROFILO ENERGETICO ED ECOCOMPATIBILI (RES). LE AZIONI NECESSARIE DA ATTUARE SONO LE SEGUENTI: COMPITI: 1. COSTRUZIONE DI ILLUMINAZIONE PUBBLICA UTILIZZANDO ATTREZZATURE ECOLOGICHE E A RISPARMIO ENERGETICO NELLE CITTÀ DI SZADKOWICE E ANTONIÓWKA. 2. COSTRUZIONE DI ILLUMINAZIONE PUBBLICA CON L'USO DI DISPOSITIVI DI RISPARMIO ENERGETICO NELLE CITTÀ DI DISPENSA E PIETRA. 3. COSTRUZIONE DI ILLUMINAZIONE PUBBLICA UTILIZZANDO DISPOSITIVI DI RISPARMIO ENERGETICO IN PRYMUSOWA. 4. PROMOZIONE DEL PROGETTO. 5. VIGILANZA DEGLI INVESTITORI. REQUISITI TECNICI DETTAGLIATI. SONO IN SW ROZ. 4 E INCL. 3. OBIETTIVI: L'ATTUAZIONE DEL PROGETTO CONSEGUIRÀ L'OBIETTIVO PRINCIPALE DEL PROGETTO, I.E. AUMENTARE IL RISPARMIO ENERGETICO E MIGLIORARE LA PULIZIA DELL'ARIA NEL COMUNE DI SŁAWNO. GRUPPO DESTINATARIO: DIRETTO: RESIDENTI DEL COMUNE DI SŁAWNO, PASSANTI, UTILIZZANDO INFRASTRUTTURE PUBBLICHE E TURISTI CHE VISITANO IL COMUNE DI SŁAWNO (Italian)
    15 January 2022
    0 references
    EL PROYECTO CONSISTE EN LA CONSTRUCCIÓN DE ALUMBRADO PÚBLICO CON EL USO DE DISPOSITIVOS EFICIENTES DESDE EL PUNTO DE VISTA ENERGÉTICO Y RESPETUOSOS CON EL MEDIO AMBIENTE EN LOS TRAMOS: • SZADKOWICE — ANTONIÓWKA: 17 PUNTOS DE LUZ CON LUMINARIAS DE TIPO LED Y 2 CARACTERES ACTIVOS ALIMENTADOS DESDE EL MÓDULO FOTOVOLTAICO • PANS-PIEDRAS: 29 PUNTOS DE LUZ CON LUMINARIAS LED • PRIMUS: SE CONSTRUIRÁN 33 PUNTOS DE ILUMINACIÓN CON LUMINARIAS DE TIPO LED JUNTO CON 79 PUNTOS DE ILUMINACIÓN CON LUMINARIAS DE TIPO LED Y 2 SEÑALES ACTIVAS PROPULSADAS POR EL MÓDULO FOTOVOLTAICO (RES), LA INVERSIÓN PREVISTA FORMA PARTE DE UN PROYECTO DE INFRAESTRUCTURA MÁS AMPLIO, EJECUTADO EN PARALELO Y FINANCIADO POR EL BENEFICIARIO, MÁS EN EL PUNTO. 6.6 AGUA. ALTOS COSTES DE ILUMINACIÓN ACTUALES PARA LAS INSTALACIONES DE SERVICIOS PÚBLICOS: • GENERAN ALTOS COSTES DE ILUMINACIÓN • AUMENTAR LA CONTAMINACIÓN AMBIENTAL • LOS ELEVADOS COSTES DE ILUMINACIÓN NO AUMENTAN EN PROPORCIÓN A LAS NECESIDADES DE NUEVAS INVERSIONES • ESTÁN RELACIONADOS CON LA INFRAUTILIZACIÓN DE SISTEMAS EFICIENTES DESDE EL PUNTO DE VISTA ENERGÉTICO Y RESPETUOSOS CON EL MEDIO AMBIENTE (RES). LAS ACCIONES NECESARIAS QUE DEBEN EJECUTARSE SON LAS SIGUIENTES: TAREAS: 1. CONSTRUCCIÓN DE ALUMBRADO PÚBLICO CON EQUIPOS ECOLÓGICOS Y DE AHORRO ENERGÉTICO EN LAS LOCALIDADES DE SZADKOWICE Y ANTONIÓWKA. 2. CONSTRUCCIÓN DE ALUMBRADO PÚBLICO CON EL USO DE DISPOSITIVOS DE AHORRO DE ENERGÍA EN LAS CIUDADES DE DESPENSA Y PIEDRA. 3. CONSTRUCCIÓN DE ALUMBRADO PÚBLICO UTILIZANDO DISPOSITIVOS DE AHORRO DE ENERGÍA EN PRYMUSOWA. 4. PROMOCIÓN DEL PROYECTO. 5. SUPERVISIÓN DEL INVERSOR. REQUISITOS TÉCNICOS DETALLADOS. ESTÁN EN SW ROZ. 4 E INCL. 3. OBJETIVOS: LA EJECUCIÓN DEL PROYECTO ALCANZARÁ EL OBJETIVO PRINCIPAL DEL PROYECTO, I.E. AUMENTAR EL AHORRO DE ENERGÍA Y MEJORAR LA LIMPIEZA DEL AIRE EN EL MUNICIPIO DE SŁAWNO. GRUPO DESTINATARIO: DIRECTO: RESIDENTES DEL MUNICIPIO DE SŁAWNO, TRANSEÚNTES, UTILIZANDO INFRAESTRUCTURAS PÚBLICAS Y TURISTAS QUE VISITAN EL MUNICIPIO DE SŁAWNO (Spanish)
    18 January 2022
    0 references

    Identifiers

    RPLD.04.03.02-10-0011/16
    0 references