Alicia + (Q4024971): Difference between revisions
Jump to navigation
Jump to search
(Changed label, description and/or aliases in en: translated_label) |
(Created claim: summary (P836): The project consists of renovating a site with four buildings, providing accommodation for additional classrooms and improving the overall energy performance. The part of the project covered by the ERDF (phase 2) concerns three of the 4 buildings on the site. The aim of the work is to improve the BEF in the J, G and F buildings and to rehabilitate the roof, insulating and replacing the heating system (from oil to gas)., translated_summary) |
||||||||||||||
Property / summary | |||||||||||||||
The project consists of renovating a site with four buildings, providing accommodation for additional classrooms and improving the overall energy performance. The part of the project covered by the ERDF (phase 2) concerns three of the 4 buildings on the site. The aim of the work is to improve the BEF in the J, G and F buildings and to rehabilitate the roof, insulating and replacing the heating system (from oil to gas). (English) | |||||||||||||||
Property / summary: The project consists of renovating a site with four buildings, providing accommodation for additional classrooms and improving the overall energy performance. The part of the project covered by the ERDF (phase 2) concerns three of the 4 buildings on the site. The aim of the work is to improve the BEF in the J, G and F buildings and to rehabilitate the roof, insulating and replacing the heating system (from oil to gas). (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The project consists of renovating a site with four buildings, providing accommodation for additional classrooms and improving the overall energy performance. The part of the project covered by the ERDF (phase 2) concerns three of the 4 buildings on the site. The aim of the work is to improve the BEF in the J, G and F buildings and to rehabilitate the roof, insulating and replacing the heating system (from oil to gas). (English) / qualifier | |||||||||||||||
point in time: 17 January 2022
|
Revision as of 20:54, 17 January 2022
Project Q4024971 in Belgium
Language | Label | Description | Also known as |
---|---|---|---|
English | Alicia + |
Project Q4024971 in Belgium |
Statements
60,000.0 Euro
0 references
120,000.0 Euro
0 references
50.0 percent
0 references
31 December 2023
0 references
Institut Saint-André d'Ixelles asbl
0 references
1050
0 references
Le projet consiste à rénover un site contenant quatre bâtiments, à permettre l’hébergement de classes supplémentaires et à améliorer les performances énergétiques de l’ensemble. La partie du projet couvert par le FEDER (phase 2) concerne trois des 4 bâtiments du site. Les travaux visent à l’amélioration du PEB dans les bâtiments J, G et F et à la réfection de la toiture, l’isolation et le remplacement de l’installation de chauffage (passant du mazout au gaz). (French)
0 references
The project consists of renovating a site with four buildings, providing accommodation for additional classrooms and improving the overall energy performance. The part of the project covered by the ERDF (phase 2) concerns three of the 4 buildings on the site. The aim of the work is to improve the BEF in the J, G and F buildings and to rehabilitate the roof, insulating and replacing the heating system (from oil to gas). (English)
17 January 2022
0 references
Identifiers
F32-16
0 references