New wastewater pipeline project from the new EBAR del Río de Oro to the UWWTP, with integration of the bike path between the Port Noray and the South Dam in accordance with the Melilla Sustainable Urban Mobility Plan (Q3215170): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in nl, and other parts: Adding Dutch translations)
(‎Changed label, description and/or aliases in it, and other parts: Adding Italian translations)
label / itlabel / it
 
Nuovo progetto di conduttura delle acque reflue dalla nuova EBAR del Río de Oro all'UWWTP, con l'integrazione della pista ciclabile tra il porto di Noray e la diga meridionale conformemente al piano di mobilità urbana sostenibile di Melilla
Property / summary
 
Assistenza tecnica e lavori per il nuovo progetto di conduttura delle acque reflue dalla nuova EBAR del Río de Oro all'UWWTP, con integrazione della pista ciclabile tra il porto di Noray e la diga meridionale in conformità con il piano di mobilità urbana sostenibile di Melilla. (Italian)
Property / summary: Assistenza tecnica e lavori per il nuovo progetto di conduttura delle acque reflue dalla nuova EBAR del Río de Oro all'UWWTP, con integrazione della pista ciclabile tra il porto di Noray e la diga meridionale in conformità con il piano di mobilità urbana sostenibile di Melilla. (Italian) / rank
 
Normal rank
Property / summary: Assistenza tecnica e lavori per il nuovo progetto di conduttura delle acque reflue dalla nuova EBAR del Río de Oro all'UWWTP, con integrazione della pista ciclabile tra il porto di Noray e la diga meridionale in conformità con il piano di mobilità urbana sostenibile di Melilla. (Italian) / qualifier
 
point in time: 16 January 2022
Timestamp+2022-01-16T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 18:20, 16 January 2022

Project Q3215170 in Spain
Language Label Description Also known as
English
New wastewater pipeline project from the new EBAR del Río de Oro to the UWWTP, with integration of the bike path between the Port Noray and the South Dam in accordance with the Melilla Sustainable Urban Mobility Plan
Project Q3215170 in Spain

    Statements

    0 references
    0 references
    253,497.54 Euro
    0 references
    316,871.92 Euro
    0 references
    80.0 percent
    0 references
    2 December 2016
    0 references
    23 February 2017
    0 references
    CIUDAD AUTONOMA DE MELILLA
    0 references
    0 references
    0 references

    35°17'34.48"N, 2°57'2.59"W
    0 references
    52001
    0 references
    Asistencia técnica y obras del proyecto de nueva tubería de impulsión de aguas residuales desde la nueva EBAR del Río de Oro a la EDAR, con integración del carril bici entre el Puerto Noray y el Dique Sur conforme al Plan de Movilidad Urbana Sostenible de Melilla. (Spanish)
    0 references
    Technical assistance to the project's works managemen and project's work of new wastewater discharge pipeline project from the new EBAR of the Rio de Oro to the EDAR, with integration of the bike lane between the Noray Port and the South Dyke according to Melilla's Sustainable Urban Mobility Plan (English)
    0 references
    Assistance technique et travaux pour le nouveau projet de gazoduc de traitement des eaux usées de la nouvelle EBAR del Río de Oro à l’UWWTP, avec intégration de la piste cyclable entre le Port Noray et le barrage Sud conformément au Plan de Mobilité Urbaine Durable Melilla. (French)
    5 December 2021
    0 references
    Technische Unterstützung und Arbeiten für das neue Abwasserleitungsprojekt von der neuen EBAR del Río de Oro bis zum UWWTP mit Integration des Radwegs zwischen Port Noray und dem Süddamm gemäß dem Plan für nachhaltige urbane Mobilität von Melilla. (German)
    10 December 2021
    0 references
    Technische bijstand en werkzaamheden voor het nieuwe afvalwaterpijpleidingproject van de nieuwe EBAR del Río de Oro tot het UWWTP, met integratie van het fietspad tussen de Port Noray en de Zuidelijke Dam in overeenstemming met het Melilla Sustainable Urban Mobility Plan. (Dutch)
    17 December 2021
    0 references
    Assistenza tecnica e lavori per il nuovo progetto di conduttura delle acque reflue dalla nuova EBAR del Río de Oro all'UWWTP, con integrazione della pista ciclabile tra il porto di Noray e la diga meridionale in conformità con il piano di mobilità urbana sostenibile di Melilla. (Italian)
    16 January 2022
    0 references
    Melilla
    0 references

    Identifiers

    OP4.5.1_02_C001
    0 references