ENERGY UPGRADING OF THE MATERIAL ATTACHED TO THE LOWER SECONDARY SCHOOL OF MASSANZAGO (PD) (Q2072827): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item)
(‎Changed an Item: Label in wikidata changed)
label / enlabel / en
 
ENERGY UPGRADING OF THE MATERIAL ATTACHED TO THE LOWER SECONDARY SCHOOL OF MASSANZAGO (PD)

Revision as of 15:01, 17 March 2020

Project in Italy financed by DG Regio
Language Label Description Also known as
English
ENERGY UPGRADING OF THE MATERIAL ATTACHED TO THE LOWER SECONDARY SCHOOL OF MASSANZAGO (PD)
Project in Italy financed by DG Regio

    Statements

    0 references
    56,460.49 Euro
    0 references
    141,151.22 Euro
    0 references
    40.00000141692009 percent
    0 references
    6 September 2016
    0 references
    24 January 2019
    0 references
    30 September 2018
    0 references
    COMUNE DI MASSANZAGO
    0 references
    0 references

    45°33'19.84"N, 12°0'26.75"E
    0 references
    LINTERVENTO CONSISTE IN ISOLAMENTO DELLE PARETI PERIMETRALI ESTERNE (COIBENTAZIONE DI TIPO A CAPPOTTO), ISOLAMENTO TERMICO DELLA COPERTURA E SOSTITUZIONE DI PARTE DEI SERRAMENTI E SOSTITUZIONE DEI CORPI ILLUMINANTI ESISTENTI, CON NUOVE UNITA' A LED. (Italian)
    0 references

    Identifiers

    B86J16001150006
    0 references