Mulderij bv (Q4009339): Difference between revisions
Jump to navigation
Jump to search
(Changed label, description and/or aliases in en: Setting new description) |
(Changed label, description and/or aliases in en, and other parts: Adding English translations) |
||||||||||||||
label / en | label / en | ||||||||||||||
Mulderij bv | |||||||||||||||
Property / summary | |||||||||||||||
As a good employer and entrepreneur, the company wants to prevent accidents and absenteeism as much as possible and offer employees a pleasant, social and responsible working environment throughout their entire career. This research should provide key points and insights into the aspects that need to be invested in order to prevent accidents and ensure the employability of employees now and in the future. The result of the research will be elaborated in a plan of action, in which the concrete steps to achieve the intended result have been elaborated. The implementation, monitoring, evaluation and guidance of the implementation of this plan of approach are the final steps in the advisory process. (English) | |||||||||||||||
Property / summary: As a good employer and entrepreneur, the company wants to prevent accidents and absenteeism as much as possible and offer employees a pleasant, social and responsible working environment throughout their entire career. This research should provide key points and insights into the aspects that need to be invested in order to prevent accidents and ensure the employability of employees now and in the future. The result of the research will be elaborated in a plan of action, in which the concrete steps to achieve the intended result have been elaborated. The implementation, monitoring, evaluation and guidance of the implementation of this plan of approach are the final steps in the advisory process. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: As a good employer and entrepreneur, the company wants to prevent accidents and absenteeism as much as possible and offer employees a pleasant, social and responsible working environment throughout their entire career. This research should provide key points and insights into the aspects that need to be invested in order to prevent accidents and ensure the employability of employees now and in the future. The result of the research will be elaborated in a plan of action, in which the concrete steps to achieve the intended result have been elaborated. The implementation, monitoring, evaluation and guidance of the implementation of this plan of approach are the final steps in the advisory process. (English) / qualifier | |||||||||||||||
point in time: 16 January 2022
|
Revision as of 08:38, 16 January 2022
Project Q4009339 in Netherlands
Language | Label | Description | Also known as |
---|---|---|---|
English | Mulderij bv |
Project Q4009339 in Netherlands |
Statements
50.0 percent
0 references
29 March 2017
0 references
29 March 2018
0 references
Mulderij bv
0 references
7903BC
0 references
Het bedrijf wil als goed werkgever en ondernemer ongevallen en verzuim zoveel mogelijk voorkomen en de medewerkers gedurende hun volledige loopbaan een prettige, sociale en verantwoorde werkomgeving bieden. Dit onderzoek moet speerpunten en inzichten opleveren van de aspecten waarin geïnvesteerd moet worden om ongevallen te voorkomen en de inzetbaarheid van de medewerkers nu en in de toekomst te garanderen. Het resultaat van het onderzoek zal worden uitgewerkt in een plan van aanpak, waarin de concrete stappen om het beoogd resultaat te realiseren zijn uitgewerkt. De uitvoering, monitoring en evaluatie en begeleiding van de uitvoering van dit plan van aanpak zijn de laatste stappen in het adviestraject. (Dutch)
0 references
As a good employer and entrepreneur, the company wants to prevent accidents and absenteeism as much as possible and offer employees a pleasant, social and responsible working environment throughout their entire career. This research should provide key points and insights into the aspects that need to be invested in order to prevent accidents and ensure the employability of employees now and in the future. The result of the research will be elaborated in a plan of action, in which the concrete steps to achieve the intended result have been elaborated. The implementation, monitoring, evaluation and guidance of the implementation of this plan of approach are the final steps in the advisory process. (English)
16 January 2022
0 references
Identifiers
2016EUSF2012535
0 references