Construction of a 97.2 kW photovoltaic installation with the necessary infrastructure in Piotrków in the commune of Janowiec Kościelny (Q2717152): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in nl, and other parts: Adding Dutch translations)
(‎Changed label, description and/or aliases in it, and other parts: Adding Italian translations)
label / itlabel / it
 
Costruzione di un impianto fotovoltaico da 97,2 kW con le infrastrutture necessarie a Piotrków nel comune di Janowiec Kościelny
Property / summary
 
Il progetto consiste in (fasi): 1. Preparazione della documentazione e svolgimento dei compiti conformemente al calendario di cui al punto 2.4.3 Studio e preparazione e presentazione della domanda di finanziamento 2. La costruzione di un impianto di fototensione terrestre fino a 97,2 kW composto da 360 moduli con una potenza di 270 Wp ciascuno e 2 inverter trifase con una potenza di 50 kW. L'esecuzione del compito comporta il finanziamento dell'installazione, del suo montaggio e della messa in servizio insieme alla fornitura di tutte le parti e strumenti necessari (sistemi di montaggio per l'installazione di moduli, cavi, fili, apparecchiature elettriche per installazioni DC e CA). L'installazione sarà dotata di un sistema di intelligence.management e.e. (TiK). 3. Costruzione di una stazione di trasformazione. Affinché l'installazione sia collegata alla rete, è necessario costruire un trasformatore. Il compito consiste nell'acquistare una stazione di trasformazione con i componenti necessari, assemblarla e metterla in servizio. Il richiedente dispone delle attuali condizioni di connessione, delle condizioni di costruzione e del permesso di costruzione Come risultato del progetto: Riduzione di CO2-83.326 tonnellate/anno L'impianto produrrà circa 102,872 MWh/anno, che saranno venduti alla rete. Luogo di attuazione: Piotrkowo, Janowiec Kościelny, Pow.nidzicki (dz. nr. ev. 33), voivodato warm.-Mazury, costi ammissibili del progetto ammontano a 677400,00 PLN e il cofinanziamento richiesto ammonta a 575 790,00 PLN, conformemente all'85 % dell'aiuto de minimis. L'IVA non è ammissibile. La ricorrente ha la possibilità giuridica di recuperare l'IVA. Il progetto è in linea con le ipotesi esposte nel POR SZOOP WiM per l'asse prioritario IV, è conforme a: obiettivo specifico dell'azione 4.1, ossia: "Aumento della quota di fonti energetiche rinnovabili nel bilancio energetico globale della regione"; il tipo di progetto previsto dalla SzOOP, ossia "costruzione, ampliamento e ricostruzione di infrastrutture (compreso l'acquisto di attrezzature necessarie) per la produzione di ozoi"; Limiti e limitazioni, tipo di beneficiario e altre disposizioni della SzOOP e del regolamento sulla concorrenza (Italian)
Property / summary: Il progetto consiste in (fasi): 1. Preparazione della documentazione e svolgimento dei compiti conformemente al calendario di cui al punto 2.4.3 Studio e preparazione e presentazione della domanda di finanziamento 2. La costruzione di un impianto di fototensione terrestre fino a 97,2 kW composto da 360 moduli con una potenza di 270 Wp ciascuno e 2 inverter trifase con una potenza di 50 kW. L'esecuzione del compito comporta il finanziamento dell'installazione, del suo montaggio e della messa in servizio insieme alla fornitura di tutte le parti e strumenti necessari (sistemi di montaggio per l'installazione di moduli, cavi, fili, apparecchiature elettriche per installazioni DC e CA). L'installazione sarà dotata di un sistema di intelligence.management e.e. (TiK). 3. Costruzione di una stazione di trasformazione. Affinché l'installazione sia collegata alla rete, è necessario costruire un trasformatore. Il compito consiste nell'acquistare una stazione di trasformazione con i componenti necessari, assemblarla e metterla in servizio. Il richiedente dispone delle attuali condizioni di connessione, delle condizioni di costruzione e del permesso di costruzione Come risultato del progetto: Riduzione di CO2-83.326 tonnellate/anno L'impianto produrrà circa 102,872 MWh/anno, che saranno venduti alla rete. Luogo di attuazione: Piotrkowo, Janowiec Kościelny, Pow.nidzicki (dz. nr. ev. 33), voivodato warm.-Mazury, costi ammissibili del progetto ammontano a 677400,00 PLN e il cofinanziamento richiesto ammonta a 575 790,00 PLN, conformemente all'85 % dell'aiuto de minimis. L'IVA non è ammissibile. La ricorrente ha la possibilità giuridica di recuperare l'IVA. Il progetto è in linea con le ipotesi esposte nel POR SZOOP WiM per l'asse prioritario IV, è conforme a: obiettivo specifico dell'azione 4.1, ossia: "Aumento della quota di fonti energetiche rinnovabili nel bilancio energetico globale della regione"; il tipo di progetto previsto dalla SzOOP, ossia "costruzione, ampliamento e ricostruzione di infrastrutture (compreso l'acquisto di attrezzature necessarie) per la produzione di ozoi"; Limiti e limitazioni, tipo di beneficiario e altre disposizioni della SzOOP e del regolamento sulla concorrenza (Italian) / rank
 
Normal rank
Property / summary: Il progetto consiste in (fasi): 1. Preparazione della documentazione e svolgimento dei compiti conformemente al calendario di cui al punto 2.4.3 Studio e preparazione e presentazione della domanda di finanziamento 2. La costruzione di un impianto di fototensione terrestre fino a 97,2 kW composto da 360 moduli con una potenza di 270 Wp ciascuno e 2 inverter trifase con una potenza di 50 kW. L'esecuzione del compito comporta il finanziamento dell'installazione, del suo montaggio e della messa in servizio insieme alla fornitura di tutte le parti e strumenti necessari (sistemi di montaggio per l'installazione di moduli, cavi, fili, apparecchiature elettriche per installazioni DC e CA). L'installazione sarà dotata di un sistema di intelligence.management e.e. (TiK). 3. Costruzione di una stazione di trasformazione. Affinché l'installazione sia collegata alla rete, è necessario costruire un trasformatore. Il compito consiste nell'acquistare una stazione di trasformazione con i componenti necessari, assemblarla e metterla in servizio. Il richiedente dispone delle attuali condizioni di connessione, delle condizioni di costruzione e del permesso di costruzione Come risultato del progetto: Riduzione di CO2-83.326 tonnellate/anno L'impianto produrrà circa 102,872 MWh/anno, che saranno venduti alla rete. Luogo di attuazione: Piotrkowo, Janowiec Kościelny, Pow.nidzicki (dz. nr. ev. 33), voivodato warm.-Mazury, costi ammissibili del progetto ammontano a 677400,00 PLN e il cofinanziamento richiesto ammonta a 575 790,00 PLN, conformemente all'85 % dell'aiuto de minimis. L'IVA non è ammissibile. La ricorrente ha la possibilità giuridica di recuperare l'IVA. Il progetto è in linea con le ipotesi esposte nel POR SZOOP WiM per l'asse prioritario IV, è conforme a: obiettivo specifico dell'azione 4.1, ossia: "Aumento della quota di fonti energetiche rinnovabili nel bilancio energetico globale della regione"; il tipo di progetto previsto dalla SzOOP, ossia "costruzione, ampliamento e ricostruzione di infrastrutture (compreso l'acquisto di attrezzature necessarie) per la produzione di ozoi"; Limiti e limitazioni, tipo di beneficiario e altre disposizioni della SzOOP e del regolamento sulla concorrenza (Italian) / qualifier
 
point in time: 15 January 2022
Timestamp+2022-01-15T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 21:54, 15 January 2022

Project Q2717152 in Poland
Language Label Description Also known as
English
Construction of a 97.2 kW photovoltaic installation with the necessary infrastructure in Piotrków in the commune of Janowiec Kościelny
Project Q2717152 in Poland

    Statements

    0 references
    575,790.0 zloty
    0 references
    127,998.12 Euro
    0.2223 Euro
    0 references
    677,400.0 zloty
    0 references
    150,586.02 Euro
    0.2223 Euro
    0 references
    85.0 percent
    0 references
    1 September 2020
    0 references
    31 October 2020
    0 references
    VANS ENERGY
    0 references
    0 references

    53°17'21.8"N, 20°31'22.4"E
    0 references
    Projekt polega na ( etapy): 1. Opracowaniu dokumentacji i wykonaniu zadań zgodnie z harmonogramem pkt 2.4.3 Studium i przygotowaniem i złożeniem wniosku o dofinansowanie 2. Budowie instalacji fotowolt. naziemnej o mocy do 97,2 kW składającej się z 360 modułów o mocy 270 Wp każdy i 2 inwerterów trójfazowych o mocy 50kW. Realizacja zadania zakłada sfinansowanie instalacji, jej montaż i uruchomienie wraz z dostarczeniem wszelkich niezbędnych do wykonania prac części i narzędzi (systemów montażowych do zabudowy modułów, kabli, przewodów, sprzętów elektroinstalacyjnych do instalacji DC i AC). Instalacja wyposażona będzie w system intelig.zarządzania e.e.(TiK). 3. Budowie stacji transformatorowej. Aby instalacja mogła zostać podłączona do sieci istnieje konieczność budowy transformatora. Realizacja zadania polega na zakupie stacji transformatorowej z niezbędnymi elementami składowymi, jej montaż i uruchomienie. Wnioskodawca posiada aktualne warunki przyłączenia, warunki zabudowy i pozwolenie na budowę W wyniku realizacji projektu nastąpi: Redukcja emisji CO2-83,326 ton/rok Instalacja wytworzy ok 102,872 MWh/rok, która zostanie odsprzedana do sieci. Miejsce realizacji: Piotrkowo, gm.Janowiec Kościelny, pow.nidzicki (dz.nr ew. 33), woj. warm.-mazurskie Koszty kwalifikowane projektu wyniosą 677400,00 zł, a wnioskowane dofinansow. wynosi 575 790, 00 zł, zgodnie 85% pomocy de minimis. VAT jest niekwalifikowalny. Wnioskodawca ma prawną możliwość odzyskania VAT. Projekt wpisuje się w założenia określone w SzOOP RPO WiM dla IV Osi Priorytetowej, jest zgodny z: celem szczegółowym dla działania 4.1, którym jest: "Zwiększony udział odnawialnych źródeł energii w ogólnym bilansie energetycznym regionu";Typem projektu przewidzianym w SzOOP czyli "budowie, rozbudowie oraz przebudowie infrastruktury (w tym zakup niezbędnych urządzeń) mające na celu produkcję e.e z oze"; Limitami i ograniczeniami, typem beneficjenta oraz pozostałymi zapisami SzOOP i Regulaminu konkursu (Polish)
    0 references
    The project consists of (stages): 1. Preparation of documentation and performance of tasks in accordance with the schedule of point 2.4.3 Study and preparation and submission of the application for funding 2. The construction of a terrestrial photovoltage installation up to 97.2 kW consisting of 360 modules with a power of 270 Wp each and 2 three-phase inverters with a power of 50 kW. The implementation of the task involves financing the installation, its assembly and commissioning together with the delivery of all necessary parts and tools (mounting systems for the installation of modules, cables, wires, electrical equipment for DC and AC installations). The installation will be equipped with a system of intelligence.management e.e.(TiK). 3. Construction of a transformer station. For the installation to be connected to the network, it is necessary to build a transformer. The task consists of purchasing a transformer station with the necessary components, assembling and commissioning it. The applicant has current connection conditions, building conditions and building permit As a result of the project: Reduction of CO2-83,326 tonnes/year The installation will produce approximately 102,872 MWh/year, which will be sold to the network. Place of implementation: Piotrkowo, Janowiec Kościelny, Pow.nidzicki (dz. nr. ev. 33), warm.-Mazury voivodship, eligible costs of the project amount to PLN 677400.00, and the requested co-financing amounts to PLN 575 790.00, in accordance with 85 % of the de minimis aid. VAT is ineligible. The applicant has the legal possibility to recover the VAT. The project is in line with the assumptions set out in the SzOOP ROP WiM for Priority Axis IV, complies with: specific objective for Action 4.1, which is: “Increased share of renewable energy sources in the region’s overall energy balance”;The type of project provided for in the SzOOP, i.e. “construction, extension and reconstruction of infrastructure (including the purchase of necessary equipment) for the production of e.e. from oze”; Limits and limitations, type of beneficiary and other provisions of the SzOOP and the Competition Regulations (English)
    8 July 2021
    0 references
    Le projet se compose de (étapes): 1. Préparation de la documentation et exécution des tâches conformément au calendrier du point 2.4.3 Étude, préparation et soumission de la demande de financement 2. La construction d’une installation de photovoltaïque terrestre jusqu’à 97,2 kW composée de 360 modules d’une puissance de 270 Wp chacun et de 2 onduleurs triphasés d’une puissance de 50 kW. La mise en œuvre de la tâche implique le financement de l’installation, son montage et sa mise en service ainsi que la livraison de toutes les pièces et outils nécessaires (systèmes de montage pour l’installation de modules, câbles, fils, équipements électriques pour installations CC et AC). L’installation sera équipée d’un système de intelligence.management e.e. (TiK). 3. Construction d’une station de transformation. Pour que l’installation soit connectée au réseau, il est nécessaire de construire un transformateur. La tâche consiste à acheter une station de transformateur avec les composants nécessaires, à l’assembler et à la mettre en service. Le demandeur a les conditions actuelles de raccordement, les conditions de construction et le permis de construire À la suite du projet: Réduction de CO2-83,326 tonnes/an L’installation produira environ 102,872 MWh/an, qui sera vendue au réseau. Lieu de mise en œuvre: Piotrkowo, Janowiec Kościelny, Pow.nidzicki (dz. nr. 33), chaud.-Mazury voïvodie, les coûts éligibles du projet s’élèvent à 677400.00 PLN, et le cofinancement demandé s’élève à 575 790,00 PLN, conformément à 85 % de l’aide de minimis. La TVA est inéligible. La requérante a la possibilité légale de recouvrer la TVA. Le projet est conforme aux hypothèses énoncées dans la norme SzOOP ROP WiM pour l’axe prioritaire IV, conforme aux conditions suivantes: objectif spécifique de l’action 4.1, à savoir: «Augmentation de la part des sources d’énergie renouvelables dans le bilan énergétique global de la région»; Le type de projet prévu dans le SzOOP, c’est-à-dire «la construction, l’extension et la reconstruction d’infrastructures (y compris l’achat d’équipements nécessaires) pour la production d’énergies renouvelables à partir de oze»; Limites et limitations, type de bénéficiaire et autres dispositions de la SzOOP et du Règlement sur la concurrence (French)
    4 December 2021
    0 references
    Das Projekt besteht aus (Stufen): 1. Vorbereitung der Dokumentation und Ausführung der Aufgaben gemäß dem Zeitplan von Nummer 2.4.3 Studie und Vorbereitung und Einreichung des Antrags auf Finanzierung 2. Der Bau einer terrestrischen Photovoltaikanlage bis 97,2 kW bestehend aus 360 Modulen mit einer Leistung von je 270 Wp und 2 Dreiphasen-Wechselrichtern mit einer Leistung von 50 kW. Die Umsetzung der Aufgabe umfasst die Finanzierung der Installation, deren Montage und Inbetriebnahme zusammen mit der Lieferung aller notwendigen Teile und Werkzeuge (Montagesysteme für die Installation von Modulen, Kabeln, Drähten, elektrischer Ausrüstung für Gleichstrom- und Wechselstromanlagen). Die Installation wird mit einem System von Intelligence.management e.e.(TiK) ausgestattet. 3. Bau einer Transformatorstation. Damit die Installation an das Netzwerk angeschlossen werden kann, ist es notwendig, einen Transformator zu bauen. Die Aufgabe besteht darin, eine Transformatorstation mit den notwendigen Komponenten zu kaufen, zu montieren und zu beauftragen. Der Antragsteller verfügt über aktuelle Anschlussbedingungen, Baubedingungen und Baugenehmigung Als Ergebnis des Projekts: Reduzierung von CO2-83.326 Tonnen/Jahr Die Anlage wird etwa 102,872 MWh/Jahr produzieren, die an das Netz verkauft werden. Durchführungsort: Piotrkowo, Janowiec Kościelny, Pow.nidzicki (dz. nr. ev. 33), die Woiwodschaft warm.-Mazury, die förderfähigen Kosten des Projekts belaufen sich auf 677400,00 PLN und die beantragte Kofinanzierung beläuft sich auf 575790,00 PLN gemäß 85 % der De-minimis-Beihilfe. Mehrwertsteuer ist nicht förderfähig. Der Antragsteller hat die rechtliche Möglichkeit, die Mehrwertsteuer zurückzufordern. Das Projekt entspricht den Annahmen des SzOOP ROP WiM für Prioritätsachse IV: Einzelziel der Maßnahme 4.1: „Erhöhter Anteil erneuerbarer Energiequellen an der Gesamtenergiebilanz der Region“; die im SzOOP vorgesehene Projektart, d. h. „Bau, Ausbau und Wiederaufbau der Infrastruktur (einschließlich des Kaufs der erforderlichen Ausrüstung) für die Produktion von e.e. aus oze“; Grenzen und Beschränkungen, Art des Begünstigten und andere Bestimmungen des SzOOP und der Wettbewerbsordnung (German)
    16 December 2021
    0 references
    Het project bestaat uit (fasen): 1. Opstellen van documentatie en uitvoering van taken overeenkomstig het tijdschema van punt 2.4.3 Studie en voorbereiding en indiening van de financieringsaanvraag 2. De bouw van een terrestrische fotospanningsinstallatie tot 97,2 kW bestaande uit 360 modules met een vermogen van 270 Wp elk en 2 driefasige omvormers met een vermogen van 50 kW. De uitvoering van de taak omvat de financiering van de installatie, de montage en inbedrijfstelling, samen met de levering van alle benodigde onderdelen en gereedschappen (montagesystemen voor de installatie van modules, kabels, draden, elektrische apparatuur voor gelijkstroom- en wisselstroominstallaties). De installatie zal worden uitgerust met een systeem van intelligence.management e.e. (TiK). 3. Bouw van een transformatorstation. Voor de installatie te worden aangesloten op het netwerk, is het noodzakelijk om een transformator te bouwen. De taak bestaat uit de aankoop van een transformatorstation met de nodige componenten, assembleren en inbedrijfstelling. De aanvrager beschikt over actuele aansluitingsvoorwaarden, bouwomstandigheden en bouwvergunning Als gevolg van het project: Vermindering van CO2-83.326 ton/jaar De installatie zal ongeveer 102,872 MWh/jaar produceren, die aan het net zal worden verkocht. Plaats van uitvoering: Piotrkowo, Janowiec Kościelny, Pow.nidzicki (dz. nr. ev. 33), warm.-Mazury woiwodschap, subsidiabele kosten van het project bedragen 677400,00 PLN, en de gevraagde medefinanciering bedraagt 575 790,00 PLN, overeenkomstig 85 % van de de-minimissteun. Btw is niet subsidiabel. Verzoekster heeft de wettelijke mogelijkheid om de btw terug te vorderen. Het project is in overeenstemming met de veronderstellingen in het SzOOP ROP WiM voor prioritaire as IV, voldoet aan: specifieke doelstelling voor actie 4.1, te weten: „Een groter aandeel hernieuwbare energiebronnen in de totale energiebalans van de regio”; het type project waarin de SzOOP voorziet, d.w.z. „bouw, uitbreiding en wederopbouw van infrastructuur (met inbegrip van de aankoop van de nodige apparatuur) voor de productie van e.e.a. uit oze”; Beperkingen en beperkingen, soort begunstigde en andere bepalingen van de SzOOP en de Mededingingsverordeningen (Dutch)
    18 December 2021
    0 references
    Il progetto consiste in (fasi): 1. Preparazione della documentazione e svolgimento dei compiti conformemente al calendario di cui al punto 2.4.3 Studio e preparazione e presentazione della domanda di finanziamento 2. La costruzione di un impianto di fototensione terrestre fino a 97,2 kW composto da 360 moduli con una potenza di 270 Wp ciascuno e 2 inverter trifase con una potenza di 50 kW. L'esecuzione del compito comporta il finanziamento dell'installazione, del suo montaggio e della messa in servizio insieme alla fornitura di tutte le parti e strumenti necessari (sistemi di montaggio per l'installazione di moduli, cavi, fili, apparecchiature elettriche per installazioni DC e CA). L'installazione sarà dotata di un sistema di intelligence.management e.e. (TiK). 3. Costruzione di una stazione di trasformazione. Affinché l'installazione sia collegata alla rete, è necessario costruire un trasformatore. Il compito consiste nell'acquistare una stazione di trasformazione con i componenti necessari, assemblarla e metterla in servizio. Il richiedente dispone delle attuali condizioni di connessione, delle condizioni di costruzione e del permesso di costruzione Come risultato del progetto: Riduzione di CO2-83.326 tonnellate/anno L'impianto produrrà circa 102,872 MWh/anno, che saranno venduti alla rete. Luogo di attuazione: Piotrkowo, Janowiec Kościelny, Pow.nidzicki (dz. nr. ev. 33), voivodato warm.-Mazury, costi ammissibili del progetto ammontano a 677400,00 PLN e il cofinanziamento richiesto ammonta a 575 790,00 PLN, conformemente all'85 % dell'aiuto de minimis. L'IVA non è ammissibile. La ricorrente ha la possibilità giuridica di recuperare l'IVA. Il progetto è in linea con le ipotesi esposte nel POR SZOOP WiM per l'asse prioritario IV, è conforme a: obiettivo specifico dell'azione 4.1, ossia: "Aumento della quota di fonti energetiche rinnovabili nel bilancio energetico globale della regione"; il tipo di progetto previsto dalla SzOOP, ossia "costruzione, ampliamento e ricostruzione di infrastrutture (compreso l'acquisto di attrezzature necessarie) per la produzione di ozoi"; Limiti e limitazioni, tipo di beneficiario e altre disposizioni della SzOOP e del regolamento sulla concorrenza (Italian)
    15 January 2022
    0 references

    Identifiers

    RPWM.04.01.00-28-0042/18
    0 references