Green energy for own consumption in Alina Wasiluk Parkiet Hajnówka (Q2711202): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in nl, and other parts: Adding Dutch translations)
(‎Changed label, description and/or aliases in it, and other parts: Adding Italian translations)
label / itlabel / it
 
Energia verde per il proprio consumo in Alina Wasiluk Parkiet Hajnówka
Property / summary
 
La ricorrente è Alina Wasiluk Parkiet Hajnówka, un'imprenditore di medie dimensioni. Il progetto riguarda l'installazione di celle fotovoltaiche, da cui l'energia prodotta viene utilizzata al 100 % per le esigenze dell'azienda. L'oggetto del progetto non riguarda attività escluse dalla possibilità di ricevere sostegno. Il problema principale che l'azienda si trova ad affrontare nel contesto energetico è la sua dipendenza dalla connessione elettrica della Forte Furniture Factory. Parkiet Hajnówka svolge le sue attività economiche in parte nella zona acquistata da FORTE, ma la connessione elettrica appartiene allo stabilimento limitrofo e l'energia viene venduta dalla Forte Factory. Per motivi di sicurezza energetica, Parkiet Hajnówka si adopera per diventare indipendente dal suo attuale fornitore di energia. Il progetto previsto consiste nella costruzione di una centrale fotovoltaica con una capacità di 0,49938 MW con infrastrutture di accompagnamento: telai di supporto, inverter, impianto elettrico nN, stazione di trasformazione contenitore fino a 35 m² sulla giunzione n. 1056/152 e 1056/91, situato a Hajnówka a ul. 3 maggio. Zona di Hajnówka 0001. Il progetto riguarda: — installazione di strutture portanti a terra, lavori di terra, — installazione di pannelli fotovoltaici sulla struttura, — installazione di inverter DC/AC sulla costruzione, — installazione di quadri elettrici progettati, -assemblaggio di impianti elettrici progettati nN-0,4 kV, -assemblaggio di impianti elettrici progettati SN-15 kV, -installazione della stazione SN/nN — messa a terra dell'impianto. Come risultato del progetto, la centrale fotovoltaica sarà dotata di un impianto e di apparecchiature per la produzione di energia elettrica utilizzando l'energia solare. Costo totale dell'investimento — 2 673 166,02 PLN, costi ammissibili — 1 779 692,94 PLN, cofinanziamento di 1 067 815,76 PLN. (Italian)
Property / summary: La ricorrente è Alina Wasiluk Parkiet Hajnówka, un'imprenditore di medie dimensioni. Il progetto riguarda l'installazione di celle fotovoltaiche, da cui l'energia prodotta viene utilizzata al 100 % per le esigenze dell'azienda. L'oggetto del progetto non riguarda attività escluse dalla possibilità di ricevere sostegno. Il problema principale che l'azienda si trova ad affrontare nel contesto energetico è la sua dipendenza dalla connessione elettrica della Forte Furniture Factory. Parkiet Hajnówka svolge le sue attività economiche in parte nella zona acquistata da FORTE, ma la connessione elettrica appartiene allo stabilimento limitrofo e l'energia viene venduta dalla Forte Factory. Per motivi di sicurezza energetica, Parkiet Hajnówka si adopera per diventare indipendente dal suo attuale fornitore di energia. Il progetto previsto consiste nella costruzione di una centrale fotovoltaica con una capacità di 0,49938 MW con infrastrutture di accompagnamento: telai di supporto, inverter, impianto elettrico nN, stazione di trasformazione contenitore fino a 35 m² sulla giunzione n. 1056/152 e 1056/91, situato a Hajnówka a ul. 3 maggio. Zona di Hajnówka 0001. Il progetto riguarda: — installazione di strutture portanti a terra, lavori di terra, — installazione di pannelli fotovoltaici sulla struttura, — installazione di inverter DC/AC sulla costruzione, — installazione di quadri elettrici progettati, -assemblaggio di impianti elettrici progettati nN-0,4 kV, -assemblaggio di impianti elettrici progettati SN-15 kV, -installazione della stazione SN/nN — messa a terra dell'impianto. Come risultato del progetto, la centrale fotovoltaica sarà dotata di un impianto e di apparecchiature per la produzione di energia elettrica utilizzando l'energia solare. Costo totale dell'investimento — 2 673 166,02 PLN, costi ammissibili — 1 779 692,94 PLN, cofinanziamento di 1 067 815,76 PLN. (Italian) / rank
 
Normal rank
Property / summary: La ricorrente è Alina Wasiluk Parkiet Hajnówka, un'imprenditore di medie dimensioni. Il progetto riguarda l'installazione di celle fotovoltaiche, da cui l'energia prodotta viene utilizzata al 100 % per le esigenze dell'azienda. L'oggetto del progetto non riguarda attività escluse dalla possibilità di ricevere sostegno. Il problema principale che l'azienda si trova ad affrontare nel contesto energetico è la sua dipendenza dalla connessione elettrica della Forte Furniture Factory. Parkiet Hajnówka svolge le sue attività economiche in parte nella zona acquistata da FORTE, ma la connessione elettrica appartiene allo stabilimento limitrofo e l'energia viene venduta dalla Forte Factory. Per motivi di sicurezza energetica, Parkiet Hajnówka si adopera per diventare indipendente dal suo attuale fornitore di energia. Il progetto previsto consiste nella costruzione di una centrale fotovoltaica con una capacità di 0,49938 MW con infrastrutture di accompagnamento: telai di supporto, inverter, impianto elettrico nN, stazione di trasformazione contenitore fino a 35 m² sulla giunzione n. 1056/152 e 1056/91, situato a Hajnówka a ul. 3 maggio. Zona di Hajnówka 0001. Il progetto riguarda: — installazione di strutture portanti a terra, lavori di terra, — installazione di pannelli fotovoltaici sulla struttura, — installazione di inverter DC/AC sulla costruzione, — installazione di quadri elettrici progettati, -assemblaggio di impianti elettrici progettati nN-0,4 kV, -assemblaggio di impianti elettrici progettati SN-15 kV, -installazione della stazione SN/nN — messa a terra dell'impianto. Come risultato del progetto, la centrale fotovoltaica sarà dotata di un impianto e di apparecchiature per la produzione di energia elettrica utilizzando l'energia solare. Costo totale dell'investimento — 2 673 166,02 PLN, costi ammissibili — 1 779 692,94 PLN, cofinanziamento di 1 067 815,76 PLN. (Italian) / qualifier
 
point in time: 15 January 2022
Timestamp+2022-01-15T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 20:57, 15 January 2022

Project Q2711202 in Poland
Language Label Description Also known as
English
Green energy for own consumption in Alina Wasiluk Parkiet Hajnówka
Project Q2711202 in Poland

    Statements

    0 references
    1,067,815.76 zloty
    0 references
    237,375.44 Euro
    0.2223 Euro
    0 references
    1,779,692.94 zloty
    0 references
    395,625.74 Euro
    0.2223 Euro
    0 references
    60.0 percent
    0 references
    8 April 2020
    0 references
    30 April 2021
    0 references
    ALINA WASILUK PARKIET HAJNÓWKA
    0 references
    0 references

    52°31'9.1"N, 23°21'43.2"E
    0 references
    Wnioskodawcą jest Alina Wasiluk Parkiet Hajnówka, będąca średnim przedsiębiorcą. Realizowany projekt dotyczy instalacji ogniw fotowoltaicznych, z których wyprodukowana energia przeznaczona jest 100% na potrzeby własne firmy. Przedmiot projektu nie dotyczy rodzajów działalności wykluczonych z możliwości uzyskania wsparcia. Zasadniczym problemem, z którym firma boryka się w kontekście energetycznym jest uzależnienie od przyłącza energetycznego Fabryki Mebli Forte. Firma Parkiet Hajnówka prowadzi swoje operacje gospodarcze w części na terenie odkupionym od FORTE, przyłącze energii elektrycznej należy jednak do sąsiadującej fabryki i energia jest firmie sprzedawana przez Fabrykę Forte. Ze względu na bezpieczeństwo energetyczne firmy Parkiet Hajnówka dąży do uniezależnienia się od dotychczasowego dostawcy energii. Planowane przedsięwzięcie polega na budowie elektrowni fotowoltaicznej o mocy 0,49938 MW z infrastrukturą towarzyszącą: stelażami wsporczymi, inwerterami, instalacją elektryczną nN, kontenerową stacją transformatorową do 35 m2 na dz. nr 1056/152 i 1056/91, zlokalizowanych w Hajnówce przy ul. 3 Maja gm. Hajnówka obręb 0001. Projekt obejmuje swoim zakresem: - montaż konstrukcji wsporczych na gruncie, -roboty ziemne, - montaż paneli fotowoltaicznych na konstrukcji, -montaż inwerterów DC/AC na konstrukcji, - montaż projektowanych rozdzielnic elektrycznych, -montaż projektowanych instalacji elektrycznych nN-0,4 kV, -montaż projektowanych instalacji elektrycznych SN-15 kV, -montaż stacji SN/nN -uziemienie obiektu. W wyniku realizacji projektu elektrownia fotowoltaiczna zostanie wyposażona w instalację i urządzenia produkujące energię elektryczną przy wykorzystaniu energii promieniowania słonecznego. Całkowity koszt inwestycji - 2 673 166,02 zł, koszty kwalifikowalne - 1 779 692,94 zł, dofinansowanie w wysokości - 1 067 815,76 zł. (Polish)
    0 references
    The applicant is Alina Wasiluk Parkiet Hajnówka, a medium-sized entrepreneur. The project concerns the installation of photovoltaic cells, from which the produced energy is used 100 % for the company’s own needs. The subject matter of the project does not concern activities excluded from the possibility of receiving support. The main problem the company faces in the energy context is its dependence on the power connection of the Forte Furniture Factory. Parkiet Hajnówka carries out its economic operations in part in the area bought from FORTE, but the electricity connection belongs to the neighbouring factory and the energy is sold by the Forte Factory. For the sake of energy security, Parkiet Hajnówka strives to become independent of its existing energy supplier. The planned project consists of the construction of a photovoltaic power plant with a capacity of 0.49938 MW with accompanying infrastructure: support frames, inverters, electrical installation nN, container transformer station up to 35 m² on junction Nos 1056/152 and 1056/91, located in Hajnówka at ul. 3 May. Hajnówka area 0001. The project covers: — installation of supporting structures on the ground, earthworks, – installation of photovoltaic panels on the structure, – installation of DC/AC inverters on the construction, – installation of designed electrical switchgears, -assembly of designed electrical installations nN-0.4 kV, -assembly of designed electrical installations SN-15 kV, -installation of the SN/nN station -grounding of the facility. As a result of the project, the photovoltaic power plant will be equipped with an installation and equipment producing electricity using solar energy. Total investment cost – PLN 2 673 166.02, eligible costs – PLN 1 779 692.94, co-financing of PLN 1 067 815.76. (English)
    8 July 2021
    0 references
    La requérante est Alina Wasiluk Parkiet Hajnówka, une entreprise de taille moyenne. Le projet concerne l’installation de cellules photovoltaïques, à partir desquelles l’énergie produite est utilisée à 100 % pour les besoins propres de l’entreprise. L’objet du projet ne concerne pas les activités exclues de la possibilité de bénéficier d’un soutien. Le principal problème auquel l’entreprise est confrontée dans le contexte énergétique est sa dépendance à la connexion électrique de l’usine de meubles Forte. Parkiet Hajnówka exerce ses activités économiques en partie dans la zone achetée à FORTE, mais le raccordement électrique appartient à l’usine voisine et l’énergie est vendue par l’usine Forte. Dans un souci de sécurité énergétique, Parkiet Hajnówka s’efforce de devenir indépendante de son fournisseur d’énergie existant. Le projet envisagé consiste en la construction d’une centrale photovoltaïque d’une capacité de 0,49938 MW avec des infrastructures d’accompagnement: cadres de support, onduleurs, installation électrique nN, poste de transformateur de conteneurs jusqu’à 35 m² sur les jonctions nos 1056/152 et 1056/91, situé à Hajnówka à ul. 3 mai, région de Hajnówka 0001. Le projet couvre: — installation de structures de soutènement au sol, travaux de terrassement, — installation de panneaux photovoltaïques sur la structure, — installation d’onduleurs DC/AC sur la construction, — installation d’appareils électriques conçus, -montage des installations électriques conçues nN-0,4 kV, -montage des installations électriques conçues SN-15 kV, -installation de la station SN/nN -mise à la terre de l’installation. À la suite de ce projet, la centrale photovoltaïque sera équipée d’une installation et d’un équipement produisant de l’électricité à partir de l’énergie solaire. Coût total des investissements — 2 673 166,02 PLN, coûts éligibles — 1 779 692,94 PLN, cofinancement de 1 067 815,76 PLN. (French)
    4 December 2021
    0 references
    Die Klägerin ist Alina Wasiluk Parkiet Hajnówka, eine mittelständische Unternehmerin. Das Projekt betrifft die Installation von Photovoltaikzellen, von denen die erzeugte Energie zu 100 % für den Eigenbedarf des Unternehmens genutzt wird. Der Gegenstand des Projekts betrifft nicht Tätigkeiten, die von der Möglichkeit der Förderung ausgeschlossen sind. Das Hauptproblem, dem das Unternehmen im Energiekontext gegenübersteht, ist seine Abhängigkeit von der Stromverbindung der Forte Furniture Factory. Parkiet Hajnówka führt seine wirtschaftlichen Tätigkeiten teilweise in dem von FORTE gekauften Gebiet durch, aber der Stromanschluss gehört zur benachbarten Fabrik und die Energie wird von der Forte Factory verkauft. Im Interesse der Energieversorgungssicherheit strebt Parkiet Hajnówka an, unabhängig von seinem bestehenden Energieversorger zu werden. Das geplante Projekt umfasst den Bau eines Photovoltaik-Kraftwerks mit einer Leistung von 0,49938 MW mit begleitender Infrastruktur: Stützrahmen, Wechselrichter, elektrische Installation nN, Containertransformatorstation bis 35 m² an den Kreuzungen Nr. 1056/152 und 1056/91, befindet sich in Hajnówka bei ul. 3. Mai. Hajnówka Fläche 0001. Das Projekt umfasst: — Einbau von Stützkonstruktionen auf dem Boden, Erdarbeiten, – Installation von Photovoltaik-Panels auf der Struktur, – Einbau von DC/AC-Wechselrichtern auf dem Bau, – Installation von konstruierten elektrischen Schaltanlagen, -Montage der konstruierten elektrischen Anlagen nN-0,4 kV, -Montage der konstruierten elektrischen Anlagen SN-15 kV, -Installation der SN/nN-Station -Erdbelag der Anlage. Als Ergebnis des Projekts wird das Photovoltaik-Kraftwerk mit einer Anlage und Geräten ausgestattet, die Strom aus Solarenergie erzeugen. Investitionskosten insgesamt – 2 673 166.02 PLN, förderfähige Kosten – 1 779 692,94 PLN, Kofinanzierung in Höhe von 1 067 815,76 PLN. (German)
    15 December 2021
    0 references
    Verzoekster is Alina Wasiluk Parkiet Hajnówka, een middelgrote ondernemer. Het project betreft de installatie van fotovoltaïsche cellen, waarvan de geproduceerde energie 100 % wordt gebruikt voor de eigen behoeften van het bedrijf. Het onderwerp van het project heeft geen betrekking op activiteiten die zijn uitgesloten van de mogelijkheid om steun te ontvangen. Het belangrijkste probleem waarmee het bedrijf in de energiecontext wordt geconfronteerd, is de afhankelijkheid van de stroomaansluiting van de Forte Furniture Factory. Parkiet Hajnówka voert haar economische activiteiten gedeeltelijk uit in het gebied dat van FORTE is gekocht, maar de elektriciteitsaansluiting behoort tot de naburige fabriek en de energie wordt verkocht door de Forte Factory. Omwille van de energiezekerheid streeft Parkiet Hajnówka ernaar onafhankelijk te worden van haar bestaande energieleverancier. Het geplande project bestaat uit de bouw van een fotovoltaïsche elektriciteitscentrale met een capaciteit van 0,49938 MW met bijbehorende infrastructuur: steunkozijnen, omvormers, elektrische installatie nN, containertransformatorstation tot 35 m² op knooppunt nrs. 1056/152 en 1056/91, gelegen in Hajnówka te ul. 3 mei. Hajnówka gebied 0001. Het project heeft betrekking op: — installatie van ondersteunende structuren op de grond, grondwerken, — installatie van fotovoltaïsche panelen op de structuur, — installatie van DC/AC omvormers op de bouw, — installatie van ontworpen elektrische schakelinrichtingen, -assemblage van ontworpen elektrische installaties nN-0,4 kV, -assemblage van ontworpen elektrische installaties SN-15 kV, -installatie van de SN/nN station -gronding van de faciliteit. Als gevolg van het project zal de fotovoltaïsche centrale worden uitgerust met een installatie en apparatuur voor de productie van elektriciteit met behulp van zonne-energie. Totale investeringskosten — 2 673 166,02 PLN, subsidiabele kosten — 1 779 692,94 PLN, cofinanciering van 1 067 815,76 PLN. (Dutch)
    18 December 2021
    0 references
    La ricorrente è Alina Wasiluk Parkiet Hajnówka, un'imprenditore di medie dimensioni. Il progetto riguarda l'installazione di celle fotovoltaiche, da cui l'energia prodotta viene utilizzata al 100 % per le esigenze dell'azienda. L'oggetto del progetto non riguarda attività escluse dalla possibilità di ricevere sostegno. Il problema principale che l'azienda si trova ad affrontare nel contesto energetico è la sua dipendenza dalla connessione elettrica della Forte Furniture Factory. Parkiet Hajnówka svolge le sue attività economiche in parte nella zona acquistata da FORTE, ma la connessione elettrica appartiene allo stabilimento limitrofo e l'energia viene venduta dalla Forte Factory. Per motivi di sicurezza energetica, Parkiet Hajnówka si adopera per diventare indipendente dal suo attuale fornitore di energia. Il progetto previsto consiste nella costruzione di una centrale fotovoltaica con una capacità di 0,49938 MW con infrastrutture di accompagnamento: telai di supporto, inverter, impianto elettrico nN, stazione di trasformazione contenitore fino a 35 m² sulla giunzione n. 1056/152 e 1056/91, situato a Hajnówka a ul. 3 maggio. Zona di Hajnówka 0001. Il progetto riguarda: — installazione di strutture portanti a terra, lavori di terra, — installazione di pannelli fotovoltaici sulla struttura, — installazione di inverter DC/AC sulla costruzione, — installazione di quadri elettrici progettati, -assemblaggio di impianti elettrici progettati nN-0,4 kV, -assemblaggio di impianti elettrici progettati SN-15 kV, -installazione della stazione SN/nN — messa a terra dell'impianto. Come risultato del progetto, la centrale fotovoltaica sarà dotata di un impianto e di apparecchiature per la produzione di energia elettrica utilizzando l'energia solare. Costo totale dell'investimento — 2 673 166,02 PLN, costi ammissibili — 1 779 692,94 PLN, cofinanziamento di 1 067 815,76 PLN. (Italian)
    15 January 2022
    0 references

    Identifiers

    RPPD.05.01.00-20-0623/19
    0 references