Solar power plant (photovoltaic) Broczyno (Q137706): Difference between revisions
Jump to navigation
Jump to search
(Changed label, description and/or aliases in nl, and other parts: Adding Dutch translations) |
(Changed label, description and/or aliases in it, and other parts: Adding Italian translations) |
||||||||||||||
label / it | label / it | ||||||||||||||
Impianto solare (fotovoltaico) Broczyno | |||||||||||||||
Property / summary | |||||||||||||||
L'oggetto del progetto è la costruzione di un'azienda agricola fotovoltaica con una capacità totale fino a 1 MW, unitamente all'infrastruttura di accompagnamento, composta da: moduli fotovoltaici, cablaggi fissi e a corrente variabile, cassette di giunzione, container stazione trasformatore, container tecnico (magazzino), strada interna a terra e piazza terra nell'area del terreno n. 185/1 nel villaggio di Broczyno, Czaplinek. Il progetto è fermo. L'energia elettrica prodotta lì sarà fornita alla rete elettrica Energa Branch di Kalisz. Le fasi più importanti del progetto sono i lavori preparatori che consistono nell'ottenere le condizioni per l'allacciamento alla rete elettrica e nell'ottenimento di un permesso di costruzione. La fase successiva è la fase di costruzione, che comprende la fondazione della spina dorsale della centrale elettrica e l'installazione di pannelli fotovoltaici. In questa fase si svolgeranno anche lavori che prevedono la preparazione del collegamento della centrale elettrica alla rete OSD, la costruzione di un collegamento energetico, la costruzione della recinzione, il completamento dell'accesso, l'installazione del sistema di monitoraggio. L'insieme dei lavori di costruzione sarà supervisionato dall'ispettore di vigilanza, selezionato mediante una procedura competitiva. Data la necessità di espletare le procedure amministrative relative all'ottenimento delle decisioni e dei permessi richiesti e delle necessarie procedure di gara, il processo di costruzione inizierà e si concluderà nel 2017. La centrale inizierà a produrre energia elettrica a fine 2017 e 2018, e nel 2018 raggiungerà l'intera capacità produttiva prevista di 1 037 MWh. L'attuazione tecnica del progetto è garantita dalle condizioni di connessione alla rete ottenute. Ciò significa che, subito dopo il completamento del progetto, è possibile utilizzare la piena funzionalità dell'infrastruttura e il progetto non richiede ulteriori azioni per sfruttarla appieno. L'ente incaricato dell'attuazione del progetto sarà il richiedente — SolarStar Sp. z o.o. con sede legale a Varsavia. (Italian) | |||||||||||||||
Property / summary: L'oggetto del progetto è la costruzione di un'azienda agricola fotovoltaica con una capacità totale fino a 1 MW, unitamente all'infrastruttura di accompagnamento, composta da: moduli fotovoltaici, cablaggi fissi e a corrente variabile, cassette di giunzione, container stazione trasformatore, container tecnico (magazzino), strada interna a terra e piazza terra nell'area del terreno n. 185/1 nel villaggio di Broczyno, Czaplinek. Il progetto è fermo. L'energia elettrica prodotta lì sarà fornita alla rete elettrica Energa Branch di Kalisz. Le fasi più importanti del progetto sono i lavori preparatori che consistono nell'ottenere le condizioni per l'allacciamento alla rete elettrica e nell'ottenimento di un permesso di costruzione. La fase successiva è la fase di costruzione, che comprende la fondazione della spina dorsale della centrale elettrica e l'installazione di pannelli fotovoltaici. In questa fase si svolgeranno anche lavori che prevedono la preparazione del collegamento della centrale elettrica alla rete OSD, la costruzione di un collegamento energetico, la costruzione della recinzione, il completamento dell'accesso, l'installazione del sistema di monitoraggio. L'insieme dei lavori di costruzione sarà supervisionato dall'ispettore di vigilanza, selezionato mediante una procedura competitiva. Data la necessità di espletare le procedure amministrative relative all'ottenimento delle decisioni e dei permessi richiesti e delle necessarie procedure di gara, il processo di costruzione inizierà e si concluderà nel 2017. La centrale inizierà a produrre energia elettrica a fine 2017 e 2018, e nel 2018 raggiungerà l'intera capacità produttiva prevista di 1 037 MWh. L'attuazione tecnica del progetto è garantita dalle condizioni di connessione alla rete ottenute. Ciò significa che, subito dopo il completamento del progetto, è possibile utilizzare la piena funzionalità dell'infrastruttura e il progetto non richiede ulteriori azioni per sfruttarla appieno. L'ente incaricato dell'attuazione del progetto sarà il richiedente — SolarStar Sp. z o.o. con sede legale a Varsavia. (Italian) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: L'oggetto del progetto è la costruzione di un'azienda agricola fotovoltaica con una capacità totale fino a 1 MW, unitamente all'infrastruttura di accompagnamento, composta da: moduli fotovoltaici, cablaggi fissi e a corrente variabile, cassette di giunzione, container stazione trasformatore, container tecnico (magazzino), strada interna a terra e piazza terra nell'area del terreno n. 185/1 nel villaggio di Broczyno, Czaplinek. Il progetto è fermo. L'energia elettrica prodotta lì sarà fornita alla rete elettrica Energa Branch di Kalisz. Le fasi più importanti del progetto sono i lavori preparatori che consistono nell'ottenere le condizioni per l'allacciamento alla rete elettrica e nell'ottenimento di un permesso di costruzione. La fase successiva è la fase di costruzione, che comprende la fondazione della spina dorsale della centrale elettrica e l'installazione di pannelli fotovoltaici. In questa fase si svolgeranno anche lavori che prevedono la preparazione del collegamento della centrale elettrica alla rete OSD, la costruzione di un collegamento energetico, la costruzione della recinzione, il completamento dell'accesso, l'installazione del sistema di monitoraggio. L'insieme dei lavori di costruzione sarà supervisionato dall'ispettore di vigilanza, selezionato mediante una procedura competitiva. Data la necessità di espletare le procedure amministrative relative all'ottenimento delle decisioni e dei permessi richiesti e delle necessarie procedure di gara, il processo di costruzione inizierà e si concluderà nel 2017. La centrale inizierà a produrre energia elettrica a fine 2017 e 2018, e nel 2018 raggiungerà l'intera capacità produttiva prevista di 1 037 MWh. L'attuazione tecnica del progetto è garantita dalle condizioni di connessione alla rete ottenute. Ciò significa che, subito dopo il completamento del progetto, è possibile utilizzare la piena funzionalità dell'infrastruttura e il progetto non richiede ulteriori azioni per sfruttarla appieno. L'ente incaricato dell'attuazione del progetto sarà il richiedente — SolarStar Sp. z o.o. con sede legale a Varsavia. (Italian) / qualifier | |||||||||||||||
point in time: 15 January 2022
|
Revision as of 16:03, 15 January 2022
Project Q137706 in Poland
Language | Label | Description | Also known as |
---|---|---|---|
English | Solar power plant (photovoltaic) Broczyno |
Project Q137706 in Poland |
Statements
1,752,862.93 zloty
0 references
2,191,078.69 zloty
0 references
80.0 percent
0 references
30 November 2015
0 references
31 August 2018
0 references
SOLARSTAR SP. Z O. O.
0 references
Przedmiotem projektu jest budowa farmy fotowoltaicznej o łącznej mocy do 1 MW wraz z infrastrukturą towarzyszącą, w skład której wchodzą: moduły fotowoltaiczne, okablowanie stało i zmienno-prądowe, skrzynki przyłączeniowe, kontener stacji transformatorowej, kontener techniczny (magazynowy), wewnętrzna droga gruntowa i plac gruntowy na terenie części działki o nr ew. 185/1 w miejscowości Broczyno, gm. Czaplinek. Projekt ma charakter stacjonarny. Wyprodukowana w niej energia elektryczna będzie dostarczana do sieci elektroenergetycznej Energa Oddział w Kaliszu. Do najważniejszych etapów realizacji przedsięwzięcia należą prace przygotowawcze polegające na uzyskaniu warunków przyłączenia do sieci elektroenergetycznej oraz uzyskanie pozwolenia na budowę. Kolejnym etapem jest etap prac budowlanych, który obejmuje posadowienie szkieletu elektrowni i montaż paneli fotowoltaicznych. W tym etapie przeprowadzone zostaną także prace polegające na przygotowaniu przyłączenia elektrowni do sieci OSD, budowie przyłącza energetycznego, budowie ogrodzenia, wykonaniu dojazdu, instalacji systemu monitoringu. Nad całością prac budowlanych będzie czuwał wyłoniony w drodze postępowania konkurencyjnego, inspektor nadzoru. Ze względu na konieczność przeprowadzenia postępowań administracyjnych związanych z uzyskaniem wymaganych decyzji i pozwoleń oraz niezbędnych procedur przetargowych proces budowy rozpocznie się i zakończy w 2017r. Elektrownia rozpocznie wytwarzanie energii elektrycznej na przełomie 2017 i 2018 roku, i w 2018 roku osiągnie pełną zaplanowaną zdolność produkcyjną 1037 MWh.Techniczną realizacja projektu gwarantują uzyskane warunki przyłączenia do sieci. Oznacza to, iż bezpośrednio po zakończeniu realizacji projektu jest możliwe wykorzystanie pełnej funkcjonalności infrastruktury, zaś projekt nie wymaga dodatkowych działań w celu jego pełnego wykorzystania. Podmiotem wdrażającym projekt będzie Wnioskodawca - SolarStar Sp. z o.o. z siedzibą w Warszawie. (Polish)
0 references
The subject of the project is the construction of a photovoltaic farm with a total capacity of up to 1 MW together with the accompanying infrastructure, which includes: photovoltaic modules, fixed and variable-current wiring, connection boxes, transformer station container, technical container (storage), internal ground road and ground area on the area of the plot no. 185/1 in Broczyno, Gm. Czaplinek. The project is stationary. The electricity produced in it will be delivered to the power grid Energa Branch in Kalisz. The most important stages of the project’s implementation include preparatory work consisting of obtaining the conditions of connection to the electricity grid and obtaining a construction permit. The next stage is the construction phase, which includes planting the plant’s skeleton and assembly of photovoltaic panels. At this stage, work will also be carried out on preparing the connection of the power plant to the OSD network, construction of the power connection, construction of a fence, execution of access, installation of the monitoring system. All construction works will be supervised by a supervisory inspector, selected by a competitive procedure. Due to the need to conduct administrative procedures related to obtaining the required decisions and permits and the necessary tendering procedures, the construction process will start and end in 2017. The power plant will start generating electricity at the turn of 2017 and 2018, and in 2018 it will reach the full planned production capacity of 1037 MWh.The technical implementation of the project is guaranteed by the achieved conditions for connection to the grid. This means that it is possible to use the full functionality of the infrastructure immediately after the completion of the project, and that the project does not require additional actions to fully exploit it. The entity implementing the project will be the Applicant – SolarStar Sp. z o.o. with its registered office in Warsaw. (English)
21 October 2020
0 references
L’objet du projet est la construction d’une exploitation photovoltaïque d’une capacité totale allant jusqu’à 1 MW, ainsi que des infrastructures d’accompagnement, comprenant: modules photovoltaïques, câblage à courant fixe et à courant variable, boîtes de jonction, conteneur de poste de transformateur, conteneur technique (entrepôt), route terrestre intérieure et carré de sol dans la zone de la parcelle no 185/1 dans le village de Broczyno, Czaplinek. Le projet est stationnaire. L’électricité qui y est produite sera fournie au réseau électrique Energa Branch à Kalisz. Les étapes les plus importantes du projet sont les travaux préparatoires consistant à obtenir les conditions de raccordement au réseau électrique et l’obtention d’un permis de construire. L’étape suivante est la phase de construction, qui comprend la fondation de l’épine dorsale de la centrale et l’installation de panneaux photovoltaïques. Des travaux seront également réalisés à ce stade, notamment la préparation de la connexion de la centrale au réseau OSD, la construction d’une connexion énergétique, la construction de la clôture, l’achèvement de l’accès, l’installation du système de surveillance. L’ensemble des travaux de construction sera supervisé par l’inspecteur de surveillance, sélectionné dans le cadre d’une procédure de mise en concurrence. En raison de la nécessité de mener à bien les procédures administratives liées à l’obtention des décisions et des permis requis et des procédures d’appel d’offres nécessaires, le processus de construction débutera et s’achèvera en 2017. La centrale commencera à produire de l’électricité au tournant de 2017 et 2018, et en 2018, elle atteindra la pleine capacité de production prévue de 1 037 MWh. La mise en œuvre technique du projet est garantie par les conditions de raccordement au réseau. Cela signifie que, immédiatement après l’achèvement du projet, il est possible d’utiliser toute la fonctionnalité de l’infrastructure et que le projet ne nécessite pas d’actions supplémentaires pour en faire pleinement usage. L’entité chargée de la mise en œuvre du projet sera la requérante — SolarStar Sp. z o.o., dont le siège social est situé à Varsovie. (French)
2 December 2021
0 references
Gegenstand des Projekts ist der Bau eines Photovoltaikbetriebs mit einer Gesamtkapazität von bis zu 1 MW sowie die dazugehörige Infrastruktur, bestehend aus: Photovoltaik-Module, feste und variable Stromverkabelung, Anschlusskästen, Trafostation Container, technischer Container (Lagerhaus), interne Bodenstraße und Grundplatz im Bereich des Grundstücks Nr. 185/1 im Dorf Broczyno, Czaplinek. Das Projekt ist stationär. Der dort erzeugte Strom wird an das Stromnetz Energa Branch in Kalisz geliefert. Die wichtigsten Etappen des Projekts sind vorbereitende Arbeiten, die darin bestehen, die Bedingungen für den Anschluss an das Stromnetz und die Erlangung einer Baugenehmigung zu erhalten. Die nächste Stufe ist die Bauphase, die die Gründung des Rückgrats des Kraftwerks und die Installation von Photovoltaik-Panels umfasst. In diesem Stadium werden auch Arbeiten durchgeführt, die die Vorbereitung des Anschlusses des Kraftwerks an das OSD-Netz, den Bau einer Energieverbindung, den Bau des Zauns, die Fertigstellung des Zugangs, die Installation des Überwachungssystems umfassen. Die Gesamtbauarbeiten werden vom Aufsichtsinspektor überwacht, der im Rahmen eines wettbewerblichen Verfahrens ausgewählt wird. Aufgrund der Notwendigkeit, Verwaltungsverfahren im Zusammenhang mit der Erlangung der erforderlichen Entscheidungen und Genehmigungen und der erforderlichen Ausschreibungen durchzuführen, wird das Bauverfahren im Jahr 2017 beginnen und abgeschlossen sein. Das Kraftwerk wird zum Jahreswechsel 2017 und 2018 mit der Stromerzeugung beginnen und 2018 die volle geplante Produktionskapazität von 1 037 MWh erreichen. Die technische Umsetzung des Projekts wird durch die gewonnenen Netzanschlüsse gewährleistet. Dies bedeutet, dass es unmittelbar nach Abschluss des Projekts möglich ist, die volle Funktionalität der Infrastruktur zu nutzen, und das Projekt erfordert keine zusätzlichen Maßnahmen, um sie voll auszuschöpfen. Durchführungsstelle des Projekts ist die Klägerin – SolarStar Sp. z o.o. mit Sitz in Warschau. (German)
13 December 2021
0 references
Het doel van het project is de bouw van een fotovoltaïsche boerderij met een totale capaciteit van maximaal 1 MW, samen met de bijbehorende infrastructuur, bestaande uit: fotovoltaïsche modules, vaste en variabele stroombedrading, aansluitdozen, transformatorstationcontainer, technische container (magazijn), interne grondweg en grondplein in het gebied van het perceel nr. 185/1 in het dorp Broczyno, Czaplinek. Het project is stil. De aldaar geproduceerde elektriciteit zal worden geleverd aan het elektriciteitsnet Energa Branch in Kalisz. De belangrijkste fasen van het project zijn voorbereidende werkzaamheden, bestaande uit het verkrijgen van de voorwaarden voor aansluiting op het elektriciteitsnet en het verkrijgen van een bouwvergunning. De volgende fase is de bouwfase, die de fundering van de ruggengraat van de elektriciteitscentrale en de installatie van fotovoltaïsche panelen omvat. In dit stadium zullen ook werkzaamheden worden verricht met betrekking tot de voorbereiding van de aansluiting van de centrale op het OSD-netwerk, de aanleg van een energieverbinding, de bouw van het hek, de voltooiing van de toegang, de installatie van het bewakingssysteem. De algemene bouwwerkzaamheden zullen onder toezicht staan van de toezichthoudende inspecteur, die via een concurrerende procedure wordt geselecteerd. Vanwege de noodzaak om administratieve procedures uit te voeren in verband met het verkrijgen van de vereiste besluiten en vergunningen en de nodige aanbestedingsprocedures, zal het bouwproces in 2017 van start gaan en afgerond worden. De elektriciteitscentrale zal begin 2017 en 2018 beginnen met het opwekken van elektriciteit en zal in 2018 de volledige geplande productiecapaciteit van 1 037 MWh bereiken. De technische uitvoering van het project wordt gegarandeerd door de verkregen voorwaarden voor aansluiting op het net. Dit betekent dat het onmiddellijk na de voltooiing van het project mogelijk is om de volledige functionaliteit van de infrastructuur te gebruiken en dat het project geen aanvullende acties vereist om er ten volle gebruik van te maken. De uitvoerende entiteit van het project is verzoekster — SolarStar Sp. z o.o. met maatschappelijke zetel te Warschau. (Dutch)
17 December 2021
0 references
L'oggetto del progetto è la costruzione di un'azienda agricola fotovoltaica con una capacità totale fino a 1 MW, unitamente all'infrastruttura di accompagnamento, composta da: moduli fotovoltaici, cablaggi fissi e a corrente variabile, cassette di giunzione, container stazione trasformatore, container tecnico (magazzino), strada interna a terra e piazza terra nell'area del terreno n. 185/1 nel villaggio di Broczyno, Czaplinek. Il progetto è fermo. L'energia elettrica prodotta lì sarà fornita alla rete elettrica Energa Branch di Kalisz. Le fasi più importanti del progetto sono i lavori preparatori che consistono nell'ottenere le condizioni per l'allacciamento alla rete elettrica e nell'ottenimento di un permesso di costruzione. La fase successiva è la fase di costruzione, che comprende la fondazione della spina dorsale della centrale elettrica e l'installazione di pannelli fotovoltaici. In questa fase si svolgeranno anche lavori che prevedono la preparazione del collegamento della centrale elettrica alla rete OSD, la costruzione di un collegamento energetico, la costruzione della recinzione, il completamento dell'accesso, l'installazione del sistema di monitoraggio. L'insieme dei lavori di costruzione sarà supervisionato dall'ispettore di vigilanza, selezionato mediante una procedura competitiva. Data la necessità di espletare le procedure amministrative relative all'ottenimento delle decisioni e dei permessi richiesti e delle necessarie procedure di gara, il processo di costruzione inizierà e si concluderà nel 2017. La centrale inizierà a produrre energia elettrica a fine 2017 e 2018, e nel 2018 raggiungerà l'intera capacità produttiva prevista di 1 037 MWh. L'attuazione tecnica del progetto è garantita dalle condizioni di connessione alla rete ottenute. Ciò significa che, subito dopo il completamento del progetto, è possibile utilizzare la piena funzionalità dell'infrastruttura e il progetto non richiede ulteriori azioni per sfruttarla appieno. L'ente incaricato dell'attuazione del progetto sarà il richiedente — SolarStar Sp. z o.o. con sede legale a Varsavia. (Italian)
15 January 2022
0 references
Identifiers
RPZP.02.10.00-32-A090/16
0 references