Construction by Przedsiębiorstwo Usług Komunalnych Sp. z o.o. of a photovoltaic installation on water estimation in Gryfin (Q137697): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in nl, and other parts: Adding Dutch translations)
(‎Changed label, description and/or aliases in it, and other parts: Adding Italian translations)
label / itlabel / it
 
Costruzione da parte di Przedsiębiorstwo Usług Komunalne Sp. z o.o. di un impianto fotovoltaico che utilizza acqua tyWA a Gryfin
Property / summary
 
Il progetto consisterà nella costruzione di un impianto fotovoltaico con una capacità di 99,68kWp sul sito di estrazione dell'acqua tyWA a Gryfin. Il progetto è fermo. L'obiettivo dell'investimento è lo sviluppo del terreno per la costruzione di un impianto fotovoltaico con una capacità di 99,98 kW — 356 celle fotovoltaiche con una capacità di 280 Wp ciascuna. Si ipotizza una superficie di un impianto fotovoltaico non superiore a 2 000 m². L'energia elettrica CC prodotta da celle fotovoltaiche sarà convertita da inverter in corrente alternata e poi trasformatore nella rete elettrica dell'operatore. Le fasi di attuazione del progetto sono state pianificate in modo che siano logicamente collegate.La prima fase dell'investimento è la preparazione della documentazione del progetto (studio di fattibilità, carta d'informazione del progetto e progetto di costruzione). La fase successiva consiste nell'ottenere le autorizzazioni necessarie (vale a dire ottenere i permessi necessari (vale a dire ottenere dec. sulla costruzione, ottenere le condizioni per l'allacciamento alla rete, consentire la costruzione).3.La fase è la selezione del contraente per l'assemblaggio dei lavori di costruzione.e l'ispettore di supervisione.4.la fase è i lavori di costruzione e installazione.La fase finale sarà la messa in servizio e la ricezione dei lavori. L'effettiva attuazione dell'investimento sarà supervisionata dall'ingegnere contrattuale. La conclusione del progetto sarà: 31.08.2017. Le soluzioni tecniche consentiranno l'attuazione del progetto secondo il calendario previsto. Dopo l'investimento, l'infrastruttura sarà pronta a utilizzare la sua piena funzionalità senza la necessità di ulteriori azioni. L'azienda dispone di risorse tecniche, umane e di conoscenze per garantire che il processo di cui sopra sia eseguito correttamente. (Italian)
Property / summary: Il progetto consisterà nella costruzione di un impianto fotovoltaico con una capacità di 99,68kWp sul sito di estrazione dell'acqua tyWA a Gryfin. Il progetto è fermo. L'obiettivo dell'investimento è lo sviluppo del terreno per la costruzione di un impianto fotovoltaico con una capacità di 99,98 kW — 356 celle fotovoltaiche con una capacità di 280 Wp ciascuna. Si ipotizza una superficie di un impianto fotovoltaico non superiore a 2 000 m². L'energia elettrica CC prodotta da celle fotovoltaiche sarà convertita da inverter in corrente alternata e poi trasformatore nella rete elettrica dell'operatore. Le fasi di attuazione del progetto sono state pianificate in modo che siano logicamente collegate.La prima fase dell'investimento è la preparazione della documentazione del progetto (studio di fattibilità, carta d'informazione del progetto e progetto di costruzione). La fase successiva consiste nell'ottenere le autorizzazioni necessarie (vale a dire ottenere i permessi necessari (vale a dire ottenere dec. sulla costruzione, ottenere le condizioni per l'allacciamento alla rete, consentire la costruzione).3.La fase è la selezione del contraente per l'assemblaggio dei lavori di costruzione.e l'ispettore di supervisione.4.la fase è i lavori di costruzione e installazione.La fase finale sarà la messa in servizio e la ricezione dei lavori. L'effettiva attuazione dell'investimento sarà supervisionata dall'ingegnere contrattuale. La conclusione del progetto sarà: 31.08.2017. Le soluzioni tecniche consentiranno l'attuazione del progetto secondo il calendario previsto. Dopo l'investimento, l'infrastruttura sarà pronta a utilizzare la sua piena funzionalità senza la necessità di ulteriori azioni. L'azienda dispone di risorse tecniche, umane e di conoscenze per garantire che il processo di cui sopra sia eseguito correttamente. (Italian) / rank
 
Normal rank
Property / summary: Il progetto consisterà nella costruzione di un impianto fotovoltaico con una capacità di 99,68kWp sul sito di estrazione dell'acqua tyWA a Gryfin. Il progetto è fermo. L'obiettivo dell'investimento è lo sviluppo del terreno per la costruzione di un impianto fotovoltaico con una capacità di 99,98 kW — 356 celle fotovoltaiche con una capacità di 280 Wp ciascuna. Si ipotizza una superficie di un impianto fotovoltaico non superiore a 2 000 m². L'energia elettrica CC prodotta da celle fotovoltaiche sarà convertita da inverter in corrente alternata e poi trasformatore nella rete elettrica dell'operatore. Le fasi di attuazione del progetto sono state pianificate in modo che siano logicamente collegate.La prima fase dell'investimento è la preparazione della documentazione del progetto (studio di fattibilità, carta d'informazione del progetto e progetto di costruzione). La fase successiva consiste nell'ottenere le autorizzazioni necessarie (vale a dire ottenere i permessi necessari (vale a dire ottenere dec. sulla costruzione, ottenere le condizioni per l'allacciamento alla rete, consentire la costruzione).3.La fase è la selezione del contraente per l'assemblaggio dei lavori di costruzione.e l'ispettore di supervisione.4.la fase è i lavori di costruzione e installazione.La fase finale sarà la messa in servizio e la ricezione dei lavori. L'effettiva attuazione dell'investimento sarà supervisionata dall'ingegnere contrattuale. La conclusione del progetto sarà: 31.08.2017. Le soluzioni tecniche consentiranno l'attuazione del progetto secondo il calendario previsto. Dopo l'investimento, l'infrastruttura sarà pronta a utilizzare la sua piena funzionalità senza la necessità di ulteriori azioni. L'azienda dispone di risorse tecniche, umane e di conoscenze per garantire che il processo di cui sopra sia eseguito correttamente. (Italian) / qualifier
 
point in time: 15 January 2022
Timestamp+2022-01-15T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 16:03, 15 January 2022

Project Q137697 in Poland
Language Label Description Also known as
English
Construction by Przedsiębiorstwo Usług Komunalnych Sp. z o.o. of a photovoltaic installation on water estimation in Gryfin
Project Q137697 in Poland

    Statements

    0 references
    365,411.6 zloty
    0 references
    87,698.78 Euro
    13 January 2020
    0 references
    429,896.0 zloty
    0 references
    103,175.04 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    16 May 2016
    0 references
    31 December 2017
    0 references
    PRZEDSIĘBIORSTWO USŁUG KOMUNALNYCH SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ
    0 references
    0 references
    Przedsięwzięcie polegać będzie na budowie instalacji fotowoltaicznej o mocy 99,68kWp na terenie ujęcia wody Tywa w Gryfinie. Projekt ma charakter stacjonarny. Przedmiotem inwestycji jest zagospodarowanie działki pod budowę instalacji fotowoltaicznej o mocy 99,98 kW - 356 ogniw fotowoltaicznych o mocy 280Wp każde. Zakłada się powierzchnię zabudowy instalacji fotowoltaicznej nie przekraczającą 2 000 m2. Energia elektryczna w postaci prądu stałego produkowana przez ogniwa fotowoltaiczne będzie przekształcana przez falowniki na prąd zmienny, a następnie za pomocą sieci transformatorowej do sieci elektroenergetycznej operatora. Etapy wdrażania projektu zostały zaplanowane w taki sposób, aby były ze sobą logicznie powiązane.Pierwszy etap inwestycji stanowi przygotowanie dokumentacji projektu (Studium wykonalności, Karty Informacyjnej Przedsięwzięcia oraz projektu budowlanego). Kolejnym krokiem jest uzyskanie niezbędnych pozwoleń (tj.uzysk. dec. o war.zabudowy, uzysk. warunków przyłączenia do sieci, pozwol.na budowę).3.etapem jest wybór wykonawcy robót bud.-montaż.i inspektora nadzoru.4.etap to prace budowlano-instalac.Ostatnim etapem będzie uruchomienie instalacji i odbiór prac. Nad skuteczną realizacją inwestycji będzie czuwał Inżynier Kontraktu. Zakończenie projektu nastąpi: 31.08.2017. Rozwiązania techniczne umożliwią realizację projektu zgodnie z zakładanym harmonogramem.Po realizacji inwestycji infrastruktura będzie gotowa do wykorzystania jej pełnej funkcjonalności bez konieczności podejmowania dodatkowych działań. Spółka posiada zasoby techniczne,kadrowe i wiedzę, gwarantujące prawidłowe przeprowadzenie powyższego procesu. (Polish)
    0 references
    The project will consist of the construction of a photovoltaic installation with a power of 99.68kWp in the area of a straight water in Gryfin. The project is stationary. The subject of the investment is the development of a plot for the construction of a photovoltaic installation with a capacity of 99.98 kW – 356 photovoltaic cells with a capacity of 280Wp each. The installation area of a photovoltaic installation not exceeding 2000 m² shall be assumed. Direct current electricity produced by photovoltaic cells will be converted by inverters into alternating current and then via a transformer grid to the operator’s electricity grid. The phases of the project’s implementation were planned in such a way as to be logically linked.The first stage of the project is preparation of project documentation (feasibility study, Enterprise Information Card and construction project). The next step is to obtain the necessary permits (i.e. profit. dec. o war.built, yield conditions for connection to the network, permit construction).3.stage is the selection of contractor for construction works construction-assembly and supervision inspector.4.stage is construction-instalac work. The Contract Engineer will supervise the effective implementation of the investment. The project will be completed: 31.08.2017. Technical solutions will enable the implementation of the project according to the planned timetable.After the implementation of the investment, the infrastructure will be ready to use its full functionality without the need for additional activities. The Company has technical resources, resources and knowledge to ensure that the above process is carried out correctly. (English)
    21 October 2020
    0 references
    Le projet consistera en la construction d’une installation photovoltaïque d’une capacité de 99,68 kWp sur le site de captage d’eau de TYWA à Gryfin. Le projet est stationnaire. L’objet de l’investissement est le développement du terrain pour la construction d’une installation photovoltaïque d’une capacité de 99,98 kW — 356 cellules photovoltaïques d’une capacité de 280 Wp chacune. Une surface d’une installation photovoltaïque ne dépassant pas 2 000 m² est supposée. L’électricité en courant continu produite par des cellules photovoltaïques sera convertie par onduleurs en courant alternatif, puis transformateur vers le réseau électrique de l’opérateur. Les étapes de la mise en œuvre du projet ont été planifiées de manière à être logiquement liées.La première étape de l’investissement est la préparation de la documentation du projet (étude de faisabilité, charte d’information sur le projet et projet de construction). L’étape suivante consiste à obtenir les autorisations nécessaires (c’est-à-dire l’obtention des permis nécessaires (c’est-à-dire l’obtention de la déc. sur la construction, l’obtention des conditions de raccordement au réseau, l’autorisation de la construction).3.La phase finale est la mise en service de l’installation et de la réception des travaux. La mise en œuvre effective de l’investissement sera supervisée par l’ingénieur contractuel. La fin du projet sera: 31.08.2017. Les solutions techniques permettront la mise en œuvre du projet selon le calendrier prévu. Après l’investissement, l’infrastructure sera prête à utiliser toute sa fonctionnalité sans avoir besoin d’actions supplémentaires. L’entreprise dispose de ressources techniques, humaines et de connaissances pour s’assurer que le processus ci-dessus est correctement exécuté. (French)
    2 December 2021
    0 references
    Das Projekt wird aus dem Bau einer Photovoltaikanlage mit einer Kapazität von 99.68kWp auf der tyWA Wasserentnahmestelle in Gryfin bestehen. Das Projekt ist stationär. Gegenstand der Investition ist die Entwicklung des Grundstücks für den Bau einer Photovoltaikanlage mit einer Leistung von 99,98 kW – 356 Photovoltaikzellen mit einer Kapazität von je 280 Wp. Eine Fläche einer Fotovoltaikanlage von nicht mehr als 2 000 m² wird angenommen. Der von Photovoltaik-Zellen erzeugte Gleichstrom wird von Wechselrichtern in Wechselstrom und dann Transformator in das Stromnetz des Betreibers umgewandelt. Die Phasen der Projektdurchführung wurden so geplant, dass sie logisch miteinander verknüpft sind.Die erste Phase der Investition ist die Vorbereitung der Projektdokumentation (Durchführbarkeitsstudie, Projektinformationscharta und Bauvorhaben). Der nächste Schritt ist die Erlangung der erforderlichen Genehmigungen (d. h. die Erlangung der erforderlichen Genehmigungen (d. h. die Erlangung von Dez. über den Bau, die Erlangung der Bedingungen für den Anschluss an das Netz, die Baugenehmigung).3.Die Phase ist die Auswahl des Auftragnehmers für die Bauarbeiten und der Aufsichtsinspektor.4.die Phase ist die Bau- und Installationsarbeiten.Die letzte Phase ist die Inbetriebnahme der Installation und des Empfangs der Arbeiten. Die wirksame Durchführung der Investition wird vom Vertragsingenieur überwacht. Das Projekt endet wie folgt: 31.08.2017. Technische Lösungen ermöglichen die Durchführung des Projekts nach dem geplanten Zeitplan. Nach der Investition ist die Infrastruktur bereit, ihre volle Funktionalität zu nutzen, ohne dass zusätzliche Maßnahmen erforderlich sind. Das Unternehmen verfügt über technische, personelle Ressourcen und Kenntnisse, um sicherzustellen, dass der oben genannte Prozess ordnungsgemäß durchgeführt wird. (German)
    13 December 2021
    0 references
    Het project zal bestaan uit de bouw van een fotovoltaïsche installatie met een capaciteit van 99,68kWp op de tyWA wateronttrekkingslocatie in Gryfin. Het project is stil. Het doel van de investering is de ontwikkeling van het perceel voor de bouw van een fotovoltaïsche installatie met een capaciteit van 99,98 kW — 356 fotovoltaïsche cellen met een capaciteit van 280 Wp elk. Er wordt uitgegaan van een oppervlakte van een fotovoltaïsche installatie van ten hoogste 2 000 m². Gelijkstroom-elektriciteit geproduceerd door fotovoltaïsche cellen zal door omvormers worden omgezet in wisselstroom en vervolgens transformator naar het elektriciteitsnet van de operator. De fasen van de projectuitvoering zijn zodanig gepland dat ze logisch met elkaar verbonden zijn.De eerste fase van de investering is de voorbereiding van de projectdocumentatie (haalbaarheidsstudie, het Project Information Charter en het bouwproject). De volgende stap is het verkrijgen van de nodige vergunningen (d.w.z. het verkrijgen van de nodige vergunningen (d.w.z. het verkrijgen van de dec. bij de bouw, het verkrijgen van de voorwaarden voor aansluiting op het net, het verkrijgen van de bouwvergunning).3.De fase is de selectie van de aannemer voor de bouwwerkzaamheden en de controle-inspecteur.4.de fase is de bouw- en installatiewerkzaamheden.De laatste fase is de inbedrijfstelling van de installatie en de ontvangst van de werken. De effectieve uitvoering van de investering staat onder toezicht van de Contract Engineer. Het einde van het project is: 31.08.2017. Technische oplossingen zullen de uitvoering van het project mogelijk maken volgens het geplande tijdschema. Na de investering zal de infrastructuur klaar zijn om de volledige functionaliteit te gebruiken zonder dat aanvullende acties nodig zijn. Het bedrijf beschikt over technische, personele en kennis om ervoor te zorgen dat het bovenstaande proces naar behoren wordt uitgevoerd. (Dutch)
    17 December 2021
    0 references
    Il progetto consisterà nella costruzione di un impianto fotovoltaico con una capacità di 99,68kWp sul sito di estrazione dell'acqua tyWA a Gryfin. Il progetto è fermo. L'obiettivo dell'investimento è lo sviluppo del terreno per la costruzione di un impianto fotovoltaico con una capacità di 99,98 kW — 356 celle fotovoltaiche con una capacità di 280 Wp ciascuna. Si ipotizza una superficie di un impianto fotovoltaico non superiore a 2 000 m². L'energia elettrica CC prodotta da celle fotovoltaiche sarà convertita da inverter in corrente alternata e poi trasformatore nella rete elettrica dell'operatore. Le fasi di attuazione del progetto sono state pianificate in modo che siano logicamente collegate.La prima fase dell'investimento è la preparazione della documentazione del progetto (studio di fattibilità, carta d'informazione del progetto e progetto di costruzione). La fase successiva consiste nell'ottenere le autorizzazioni necessarie (vale a dire ottenere i permessi necessari (vale a dire ottenere dec. sulla costruzione, ottenere le condizioni per l'allacciamento alla rete, consentire la costruzione).3.La fase è la selezione del contraente per l'assemblaggio dei lavori di costruzione.e l'ispettore di supervisione.4.la fase è i lavori di costruzione e installazione.La fase finale sarà la messa in servizio e la ricezione dei lavori. L'effettiva attuazione dell'investimento sarà supervisionata dall'ingegnere contrattuale. La conclusione del progetto sarà: 31.08.2017. Le soluzioni tecniche consentiranno l'attuazione del progetto secondo il calendario previsto. Dopo l'investimento, l'infrastruttura sarà pronta a utilizzare la sua piena funzionalità senza la necessità di ulteriori azioni. L'azienda dispone di risorse tecniche, umane e di conoscenze per garantire che il processo di cui sopra sia eseguito correttamente. (Italian)
    15 January 2022
    0 references

    Identifiers

    RPZP.02.10.00-32-A056/16
    0 references