ADAPTATION AND EQUIPMENT OF THE FARM BUILDING FOR THE POTTER’S WORKSHOP (Q132736): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in nl, and other parts: Adding Dutch translations)
(‎Changed label, description and/or aliases in it, and other parts: Adding Italian translations)
label / itlabel / it
 
ADATTAMENTO E SISTEMAZIONE DELL'EDIFICIO AGRICOLO PER L'OFFICINA DI CERAMICA
Property / summary
 
Adapatazione DEL BUILDING ECONOMICO PER lo studio di un vasaio Ubicazione dell'investimento: L'area della scuola primaria n. 3 a Gołdapi (Gołdap, ul. Kosciuszko 25) Il charact. progettato dell'edificio: 1 piano, area edificabile: 58,17 m², superficie utilizzabile: 43,98 m² Workshop dotato di una sala officina, accesso WC alle esigenze delle persone sotto-altoparlanti, guardaroba, magazzino Workshop per lo sviluppo di educazione non formale, attivazione e integrazione sociale — Lavori di costruzione: 1) Installazione elettrica 2) Installazione sanitaria: acqua, fognature, co e cw, ventilazione gravitazionale 3) lavori di costruzione: demolizione, terra, muratura, isolamento della fondazione, soffitto in legno, intonaco interno, pavimentazione e pittura, tetto, finestre e porte falegnameria, facciata, elementi esterni. (telaio di cemento intorno all'edificio, sottopiede e piattaforma) -Attrezzatura: 1) forno elettrico per la cottura di prodotti in argilla 2) ruota in ceramica con azionamento elettrico. 3) Workshop: tavoli, sedili, torniture in acciaio, rulli in ceramica, scaffali di cottura, utensili da modellazione, ecc. Scala di progetto ottimale in termini di fase tecnologica-tecnologica, economica e ambientale, come implementare il progetto: 1.Sviluppo del programma di investimento, documentazione tecnica e studio di fattibilità 2. Presentazione della domanda, accordo di finanziamento. 3.Scelta di appaltatori secondo PZP — lavori di costruzione, fornitura di attrezzature, supervisione degli investitori, promozione 4. Realizzazione dei lavori secondo il calendario delle cose.-finanza. 5.Reception dei lavori (protocolli) 6.Progetto di completamento. 7.Financial. proj insediamento. Proiezione secondo: —Un programma super-locale per la rivitalizzazione della rete cittadina di Cittaslow Woj. Maz caldo. —SZOOP ROP WiM- tema obiettivo.9 Promuovere l'esclusione sociale, combattere la povertà e qualsiasi discriminazione, investimenti prioritari.9b: Sostenere la rigenerazione fisica, ambientale e sociale (...)", l'obiettivo specifico: Una migliore qualità di vita per la comunità (...); Portata del progetto in base al tipo di progetto sovvenzionato, indicazioni adottate: numero di infrastrutture sostenute in aree rivitalizzate (Italian)
Property / summary: Adapatazione DEL BUILDING ECONOMICO PER lo studio di un vasaio Ubicazione dell'investimento: L'area della scuola primaria n. 3 a Gołdapi (Gołdap, ul. Kosciuszko 25) Il charact. progettato dell'edificio: 1 piano, area edificabile: 58,17 m², superficie utilizzabile: 43,98 m² Workshop dotato di una sala officina, accesso WC alle esigenze delle persone sotto-altoparlanti, guardaroba, magazzino Workshop per lo sviluppo di educazione non formale, attivazione e integrazione sociale — Lavori di costruzione: 1) Installazione elettrica 2) Installazione sanitaria: acqua, fognature, co e cw, ventilazione gravitazionale 3) lavori di costruzione: demolizione, terra, muratura, isolamento della fondazione, soffitto in legno, intonaco interno, pavimentazione e pittura, tetto, finestre e porte falegnameria, facciata, elementi esterni. (telaio di cemento intorno all'edificio, sottopiede e piattaforma) -Attrezzatura: 1) forno elettrico per la cottura di prodotti in argilla 2) ruota in ceramica con azionamento elettrico. 3) Workshop: tavoli, sedili, torniture in acciaio, rulli in ceramica, scaffali di cottura, utensili da modellazione, ecc. Scala di progetto ottimale in termini di fase tecnologica-tecnologica, economica e ambientale, come implementare il progetto: 1.Sviluppo del programma di investimento, documentazione tecnica e studio di fattibilità 2. Presentazione della domanda, accordo di finanziamento. 3.Scelta di appaltatori secondo PZP — lavori di costruzione, fornitura di attrezzature, supervisione degli investitori, promozione 4. Realizzazione dei lavori secondo il calendario delle cose.-finanza. 5.Reception dei lavori (protocolli) 6.Progetto di completamento. 7.Financial. proj insediamento. Proiezione secondo: —Un programma super-locale per la rivitalizzazione della rete cittadina di Cittaslow Woj. Maz caldo. —SZOOP ROP WiM- tema obiettivo.9 Promuovere l'esclusione sociale, combattere la povertà e qualsiasi discriminazione, investimenti prioritari.9b: Sostenere la rigenerazione fisica, ambientale e sociale (...)", l'obiettivo specifico: Una migliore qualità di vita per la comunità (...); Portata del progetto in base al tipo di progetto sovvenzionato, indicazioni adottate: numero di infrastrutture sostenute in aree rivitalizzate (Italian) / rank
 
Normal rank
Property / summary: Adapatazione DEL BUILDING ECONOMICO PER lo studio di un vasaio Ubicazione dell'investimento: L'area della scuola primaria n. 3 a Gołdapi (Gołdap, ul. Kosciuszko 25) Il charact. progettato dell'edificio: 1 piano, area edificabile: 58,17 m², superficie utilizzabile: 43,98 m² Workshop dotato di una sala officina, accesso WC alle esigenze delle persone sotto-altoparlanti, guardaroba, magazzino Workshop per lo sviluppo di educazione non formale, attivazione e integrazione sociale — Lavori di costruzione: 1) Installazione elettrica 2) Installazione sanitaria: acqua, fognature, co e cw, ventilazione gravitazionale 3) lavori di costruzione: demolizione, terra, muratura, isolamento della fondazione, soffitto in legno, intonaco interno, pavimentazione e pittura, tetto, finestre e porte falegnameria, facciata, elementi esterni. (telaio di cemento intorno all'edificio, sottopiede e piattaforma) -Attrezzatura: 1) forno elettrico per la cottura di prodotti in argilla 2) ruota in ceramica con azionamento elettrico. 3) Workshop: tavoli, sedili, torniture in acciaio, rulli in ceramica, scaffali di cottura, utensili da modellazione, ecc. Scala di progetto ottimale in termini di fase tecnologica-tecnologica, economica e ambientale, come implementare il progetto: 1.Sviluppo del programma di investimento, documentazione tecnica e studio di fattibilità 2. Presentazione della domanda, accordo di finanziamento. 3.Scelta di appaltatori secondo PZP — lavori di costruzione, fornitura di attrezzature, supervisione degli investitori, promozione 4. Realizzazione dei lavori secondo il calendario delle cose.-finanza. 5.Reception dei lavori (protocolli) 6.Progetto di completamento. 7.Financial. proj insediamento. Proiezione secondo: —Un programma super-locale per la rivitalizzazione della rete cittadina di Cittaslow Woj. Maz caldo. —SZOOP ROP WiM- tema obiettivo.9 Promuovere l'esclusione sociale, combattere la povertà e qualsiasi discriminazione, investimenti prioritari.9b: Sostenere la rigenerazione fisica, ambientale e sociale (...)", l'obiettivo specifico: Una migliore qualità di vita per la comunità (...); Portata del progetto in base al tipo di progetto sovvenzionato, indicazioni adottate: numero di infrastrutture sostenute in aree rivitalizzate (Italian) / qualifier
 
point in time: 15 January 2022
Timestamp+2022-01-15T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 15:09, 15 January 2022

Project Q132736 in Poland
Language Label Description Also known as
English
ADAPTATION AND EQUIPMENT OF THE FARM BUILDING FOR THE POTTER’S WORKSHOP
Project Q132736 in Poland

    Statements

    0 references
    0 references
    177,713.5 zloty
    0 references
    42,651.24 Euro
    13 January 2020
    0 references
    242,907.42 zloty
    0 references
    58,297.78 Euro
    13 January 2020
    0 references
    73.16 percent
    0 references
    19 May 2017
    0 references
    30 August 2018
    0 references
    GMINA GOŁDAP
    0 references
    0 references

    54°18'28.8"N, 22°18'6.8"E
    0 references
    ADAPATCJA BUDYNKU GOSPODARCZEGO NA PRACOWNIĘ GARNCARSKĄ Lokalizacja inwestycji: teren Szkoły Podstawowej nr 3 w Gołdapi (Gołdap, ul. Kościuszki 25) Planowana charakt. budynku: 1-kondygnacyjny, pow. zabudowy: 58,17m2, pow. użytkowa: 43,98m2 Pracownia wyposażona w salę warsztatową, WC przyst. do potrzeb osób niepełnospr., szatnię, magazyn Pracownia do rozwoju edukacji poza formalnej, aktywizacji i integracji społecznej -Roboty budowlane: 1) instalacja elektryczna 2) instalacja sanitarna: wodociagowa, kanalizacyjna, co i cw, wentylacji grawitacyjnej 3) prace budowlane: rozbiórkowe, ziemne, murarskie, izolacje fundamentów, strop drewniany, tynki wewn., posadzki i malowanie, dach, stolarka okienna i drzwiowa, elewacja, elementy zewn. (opaska betonowa wokół budynku, podbudowa pod opaskę i podest) -Wyposażenie: 1) elektr. piec do wypalania wyrobów z gliny 2) koło garncarskie z napędem elektr. 3) warsztatowe: stoły, siedziska, toczki stalowe, wałki dla ceramików, stojaki do wypalania, narzędzia do modelowania, itd. Skala Projektu optymalna pod względem techn.–technologicznym, ekonom. i środowiskowym Etapy, sposób wdrażania proj: 1.Oprac. programu inwestycji, dokumentacji techn. i studium wykonalności 2.Złożenie wniosku, umowa o dofinans. 3.Wybór wykonawców wg PZP– roboty budowlane, dostawa wyposażenia, nadzór inwestorski, promocja 4.Realizacja prac wg harmonogramu rzecz.-finans. 5.Odbiór prac (protokoły) 6.Zakończenie proj. 7.Finans. rozliczenie proj. Proj. zgodny z: -Ponadlokalnym programem rewitalizacji sieci miast Cittaslow Woj. Warm.-Maz. -SzOOP RPO WiM– cel temat.9 Promowanie wyłączenia społecznego, walka z ubóstwem i wszelką dyskryminacją, priorytet inwest.9b: Wspieranie rewitalizacji fizycznej, gosp. i społecznej (...)”, celem szczegółowym: Lepsza jakość życia społeczności (...); Zakres proj. zg. z typem wspieranych proj., przyjętych wskaźn.: liczba wspartych obiektów infrastr. zlokalizowanych na rewitalizowanych obszarach (Polish)
    0 references
    Investment ADAPACTIA FOR the pottery workshop Location of the investment: primary School No. 3 in Gołdapi (Gołdap, ul. Kosciuszko 25) Planned charactt. of the building: 1-storey, overhead: 58,17 m², usable area: 43,98 m² Laboratory equipped with a workshop room, toilet for the needs of the disabled, locker room, magazine Laboratory for the development of non-formal education, activation and social inclusion -Construction works: 1) Electrical installation 2) sanitary installation: water supply, sewage, as well as cw, gravity ventilation 3) construction work: demolition, earth, masonry, foundation insulation, wooden ceiling, interior plaster, flooring and painting, roof, window and door carpentry, facade, external elements. (concrete band around the building, armband and platform) -Equipment: 1) electr. furnace for firing clay products 2) electric potter wheel. 3) workshop: tables, seats, steel rollers, ceramic rollers, firing racks, modeling tools, etc. Project scale optimal in terms of technology-technological, economising and environmental Phases, method of project implementation: 1.Development of the investment programme, technical documentation and feasibility study 2. Submission of application, grant agreement. 3.Selection of contractors according to PZP- construction works, equipment delivery, investor supervision, promotion 4. 5.Receiving works (protocols) 6.Finishing project. 7.Finance. billing project. Project. compatible with: —over-local programme of revitalising the Cittaslow city network Woj. It’s Warm.-Maz. —The SzOOP of the RPO WiM – Objective.9 Promoting social exclusion, combating poverty and all discrimination, investment priority.9b: Support for physical, private and social revitalisation (...)', with a specific objective: A better quality of life for the community (...); Scope of project according to the type of supported project, accepted indications: number of supported infrastr. objects located in revitalised areas (English)
    21 October 2020
    0 references
    Adapatation DU BUILDING ÉCONOMIQUE POUR le studio d’un potier Emplacement de l’investissement: la zone de l’école primaire no 3 à Gołdapi (Gołdap, ul. Kosciuszko 25) Le caractère prévu du bâtiment: 1 étage, surface du bâtiment: 58,17 m², surface utilisable: 43,98 m² Atelier équipé d’une salle d’atelier, WC accès aux besoins des personnes sous-parleurs, vestiaire, entrepôt Atelier pour le développement de l’éducation non formelle, l’activation et l’intégration sociale — Travaux de construction: 1) Installation électrique 2) Installation sanitaire: eau, égouts, co et cw, ventilation gravitationnelle 3) travaux de construction: démolition, sol, maçonnerie, isolation de fondations, plafond en bois, plâtre intérieur, revêtement de sol et peinture, toit, menuiserie de fenêtre et de porte, façade, éléments extérieurs. (cadre en béton autour du bâtiment, sous-couche et plate-forme) -Équipement: 1) four électrique pour la cuisson des produits d’argile 2) roue de poterie avec entraînement électrique. 3) Atelier: tables, sièges, tournages en acier, rouleaux en céramique, grilles de cuisson, outils de modélisation, etc. L’échelle du projet est optimale en termes d’étapes technologiques-technologiques, économiques et environnementales, comment mettre en œuvre le projet: 1.Développement du programme d’investissement, documentation technique et étude de faisabilité 2. Présentation de la demande, accord de financement. 3.Choice des entrepreneurs selon PZP- travaux de construction, fourniture d’équipement, supervision des investisseurs, promotion 4. Mise en œuvre des travaux selon le calendrier des choses.-financement. 5.Réception des travaux (protocoles) 6.L’achèvement du projet. 7. Financier. proj règlement. Projection selon: —Un programme super-local pour la revitalisation du réseau de la ville de Cittaslow Woj. Maz chaud. —SZOOP ROP WiM — thème objectif.9 Promouvoir l’exclusion sociale, lutter contre la pauvreté et toute discrimination, investissements prioritaires.9b: Soutenir la régénération physique, environnementale et sociale (...)", l’objectif spécifique: Une meilleure qualité de vie pour la communauté (...); Portée du projet en fonction du type de projet soutenu, indications adoptées: nombre d ‘infrastructures bénéficiant d’ un appui dans les zones revitalisées (French)
    2 December 2021
    0 references
    Adapatation DES ECONOMISCHEN BUILDING FÜR ein Töpferstudio Lage der Investition: das Gebiet der Grundschule Nr. 3 in Gołdapi (Gołdap, ul. Kosciuszko 25) Das geplante Zeichen des Gebäudes: 1-stöckig, Baubereich: 58,17 m², Nutzfläche: 43,98 m² Werkstatt mit einem Werkstattraum, WC-Zugang zu den Bedürfnissen von Menschen Unterredner, Garderobe, Lagerwerkstatt für die Entwicklung von nichtformaler Bildung, Aktivierung und soziale Integration – Bauarbeiten: 1) Elektrische Installation 2) Sanitärinstallation: Wasser, Kanalisation, Co und cw, Gravitationslüftung 3) Bauarbeiten: Abbruch, Boden, Mauerwerk, Fundamentdämmung, Holzdecke, Innenputz, Bodenbelag und Malerei, Dach, Fenster- und Türtischlerei, Fassade, Außenelemente. (Betonrahmen um das Gebäude, Unterlage und Plattform) -Ausstattung: 1) Elektroofen zum Brennen von Tonprodukten 2) Töpferrad mit elektrischem Antrieb. 3) Workshop: Tische, Sitze, Stahldrehungen, Keramikwalzen, Brennregale, Modellierwerkzeuge usw. Projektskala optimal in technologietechnologischer, wirtschaftlicher und ökologischer Hinsicht, wie das Projekt umgesetzt werden kann: 1.Entwicklung des Investitionsprogramms, technische Dokumentation und Machbarkeitsstudie 2. Einreichung des Antrags, Vereinbarung über die Finanzierung. 3.Choice der Auftragnehmer entsprechend PZP- Bauarbeiten, Lieferung von Ausrüstung, Anlegeraufsicht, Förderung 4. Durchführung der Arbeiten nach dem Zeitplan der Dinge.-Finanzierung. 5. Empfang der Arbeiten (Protokolle) 6.Projektabschluss. 7.Finanzielle. proj Siedlung. Projektion gemäß: —Ein super-lokales Programm zur Revitalisierung des Stadtnetzes Cittaslow Woj. Warm-Maz. —SZOOP ROP WiM-Zielthema.9 Förderung der sozialen Ausgrenzung, Bekämpfung von Armut und jeglicher Diskriminierung, vorrangige Investitionen.9b: Förderung der physischen, ökologischen und sozialen Erneuerung (...)", das spezifische Ziel: Eine bessere Lebensqualität für die Gemeinschaft (...); Umfang des Projekts je nach Art des geförderten Projekts, angenommene Angaben: Anzahl der in revitalisierten Gebieten geförderten Infrastruktureinrichtungen (German)
    9 December 2021
    0 references
    Adapatation VAN DE ECONOMISCHE BUILDING VOOR een pottenbakkersstudio Locatie van de investering: het gebied van de basisschool nr. 3 in Gołdapi (Gołdap, ul. Kosciuszko 25) De geplande charact. van het gebouw: 1 verdieping, gebouw: 58,17 m², bruikbare oppervlakte: 43,98 m² Workshop uitgerust met een werkplaats, WC toegang tot de behoeften van mensen ondersprekers, garderobe, magazijn Workshop voor de ontwikkeling van niet-formeel onderwijs, activering en sociale integratie — Bouwwerkzaamheden: 1) Elektrische Installatie 2) Sanitaire Installatie: water, riolering, co- en cw, gravitatieventilatie 3) bouwwerkzaamheden: sloop, grond, metselwerk, stichting isolatie, houten plafond, interieur gips, vloeren en schilderen, dak, raam en deur schrijnwerk, gevel, buitenelementen. (betonframe rond het gebouw, onderlaag en platform) — Apparatuur: 1) elektrische oven voor het afvuren van kleiproducten 2) aardewerkwiel met elektrische aandrijving. 3) Workshop: tafels, stoelen, stalen draaiingen, keramische rollen, vuurrekken, modelleergereedschap, enz. Projectschaal optimaal in termen van technologie-technologische, economische en milieufasen, hoe het project ten uitvoer moet worden gelegd: 1.Ontwikkeling van het investeringsprogramma, technische documentatie en haalbaarheidsstudie 2. Indiening van de aanvraag, overeenkomst voor financiering. 3.Choice van aannemers volgens PZP-bouwwerken, levering van apparatuur, toezicht van investeerders, bevordering 4. Uitvoering van werken volgens het schema van dingen.-financiering. 5.Receptie van werken (protocollen) 6.Project voltooiing. 7.Financiële. proj afwikkeling. Projectie in overeenstemming met: —Een superlokaal programma voor de revitalisering van het stadsnetwerk Cittaslow Woj. Warm-Maz. —SZOOP ROP WiM-doelstellingsthema.9 Bevordering van sociale uitsluiting, bestrijding van armoede en discriminatie, prioritaire investeringen.9b: Ondersteuning van fysieke, ecologische en sociale regeneratie (...)", de specifieke doelstelling: Een betere levenskwaliteit voor de gemeenschap (...); Reikwijdte van het project afhankelijk van het type gesteund project, goedgekeurde indicaties: aantal ondersteunde infrastructuurvoorzieningen in gerevitaliseerde gebieden (Dutch)
    17 December 2021
    0 references
    Adapatazione DEL BUILDING ECONOMICO PER lo studio di un vasaio Ubicazione dell'investimento: L'area della scuola primaria n. 3 a Gołdapi (Gołdap, ul. Kosciuszko 25) Il charact. progettato dell'edificio: 1 piano, area edificabile: 58,17 m², superficie utilizzabile: 43,98 m² Workshop dotato di una sala officina, accesso WC alle esigenze delle persone sotto-altoparlanti, guardaroba, magazzino Workshop per lo sviluppo di educazione non formale, attivazione e integrazione sociale — Lavori di costruzione: 1) Installazione elettrica 2) Installazione sanitaria: acqua, fognature, co e cw, ventilazione gravitazionale 3) lavori di costruzione: demolizione, terra, muratura, isolamento della fondazione, soffitto in legno, intonaco interno, pavimentazione e pittura, tetto, finestre e porte falegnameria, facciata, elementi esterni. (telaio di cemento intorno all'edificio, sottopiede e piattaforma) -Attrezzatura: 1) forno elettrico per la cottura di prodotti in argilla 2) ruota in ceramica con azionamento elettrico. 3) Workshop: tavoli, sedili, torniture in acciaio, rulli in ceramica, scaffali di cottura, utensili da modellazione, ecc. Scala di progetto ottimale in termini di fase tecnologica-tecnologica, economica e ambientale, come implementare il progetto: 1.Sviluppo del programma di investimento, documentazione tecnica e studio di fattibilità 2. Presentazione della domanda, accordo di finanziamento. 3.Scelta di appaltatori secondo PZP — lavori di costruzione, fornitura di attrezzature, supervisione degli investitori, promozione 4. Realizzazione dei lavori secondo il calendario delle cose.-finanza. 5.Reception dei lavori (protocolli) 6.Progetto di completamento. 7.Financial. proj insediamento. Proiezione secondo: —Un programma super-locale per la rivitalizzazione della rete cittadina di Cittaslow Woj. Maz caldo. —SZOOP ROP WiM- tema obiettivo.9 Promuovere l'esclusione sociale, combattere la povertà e qualsiasi discriminazione, investimenti prioritari.9b: Sostenere la rigenerazione fisica, ambientale e sociale (...)", l'obiettivo specifico: Una migliore qualità di vita per la comunità (...); Portata del progetto in base al tipo di progetto sovvenzionato, indicazioni adottate: numero di infrastrutture sostenute in aree rivitalizzate (Italian)
    15 January 2022
    0 references

    Identifiers

    RPWM.08.01.00-28-0010/17
    0 references