Improving energy efficiency in the company D.C.M, Sp. z o.o. through the thermal modernisation of the upholstery hall and the administrative and social building and modernisation of the production and assembly of furniture bodies. (Q132199): Difference between revisions
Jump to navigation
Jump to search
(Changed label, description and/or aliases in nl, and other parts: Adding Dutch translations) |
(Changed label, description and/or aliases in it, and other parts: Adding Italian translations) |
||||||||||||||
label / it | label / it | ||||||||||||||
Migliorare l'efficienza energetica in D.C.M., Sp. z o.o. attraverso la termomodernizzazione della sala imbottitura e l'edilizia amministrativa e sociale e l'ammodernamento della produzione e montaggio di corpi mobili. | |||||||||||||||
Property / summary | |||||||||||||||
Oggetto del progetto è la termomodernizzazione dell'edificio imbottito insieme alle strutture amministrative e sociali (l'isolamento dei divisori esterni delle parti riscaldate insieme alla sostituzione di serramenti e porte di divisori esterni trasparenti e l'ammodernamento dell'illuminazione incorporata nell'edificio) e l'ammodernamento del processo produttivo dei corpi mobili. L'investimento riguarda i terreni 174/2, 174/3 e 174/4 a Piecki, a ul. Vittoria 32/14. Questo progetto è in linea con le ipotesi esposte nel POR SZOOP WiM per l'asse prioritario 4 Efficienza energetica per la misura 4.2. L'investimento riguarda un profondo e completo ammodernamento energetico dell'edificio appartenente al richiedente, nonché l'ammodernamento delle linee di produzione dei corpi mobili, nonché la sostituzione delle attrezzature esistenti ad alta intensità energetica con l'utilizzo di una sega di ottimizzazione e di un centro di perforazione con migliori parametri tecnici, nonché la riduzione del sistema produttivo di spostamento da: 2 turni dopo 8 ore a un turno 8 ore di lavoro nella sala di produzione. Il richiedente appartiene a una PMI e sono stati sviluppati audit energetici prima di presentare la domanda, mostrando una serie di azioni nell'impresa che migliorano la sua efficienza energetica. Il progetto sarà attuato nel periodo dal primo trimestre 2018 al quarto trimestre 2019. Grazie all'investimento, l'efficienza energetica in azienda aumenterà del 34,92 %, mentre la riduzione di CO2 in atmosfera raggiungerà il 66,10 %. Il richiedente deve avere la piena capacità di attuare correttamente il progetto conformemente ai criteri al riguardo. (Italian) | |||||||||||||||
Property / summary: Oggetto del progetto è la termomodernizzazione dell'edificio imbottito insieme alle strutture amministrative e sociali (l'isolamento dei divisori esterni delle parti riscaldate insieme alla sostituzione di serramenti e porte di divisori esterni trasparenti e l'ammodernamento dell'illuminazione incorporata nell'edificio) e l'ammodernamento del processo produttivo dei corpi mobili. L'investimento riguarda i terreni 174/2, 174/3 e 174/4 a Piecki, a ul. Vittoria 32/14. Questo progetto è in linea con le ipotesi esposte nel POR SZOOP WiM per l'asse prioritario 4 Efficienza energetica per la misura 4.2. L'investimento riguarda un profondo e completo ammodernamento energetico dell'edificio appartenente al richiedente, nonché l'ammodernamento delle linee di produzione dei corpi mobili, nonché la sostituzione delle attrezzature esistenti ad alta intensità energetica con l'utilizzo di una sega di ottimizzazione e di un centro di perforazione con migliori parametri tecnici, nonché la riduzione del sistema produttivo di spostamento da: 2 turni dopo 8 ore a un turno 8 ore di lavoro nella sala di produzione. Il richiedente appartiene a una PMI e sono stati sviluppati audit energetici prima di presentare la domanda, mostrando una serie di azioni nell'impresa che migliorano la sua efficienza energetica. Il progetto sarà attuato nel periodo dal primo trimestre 2018 al quarto trimestre 2019. Grazie all'investimento, l'efficienza energetica in azienda aumenterà del 34,92 %, mentre la riduzione di CO2 in atmosfera raggiungerà il 66,10 %. Il richiedente deve avere la piena capacità di attuare correttamente il progetto conformemente ai criteri al riguardo. (Italian) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: Oggetto del progetto è la termomodernizzazione dell'edificio imbottito insieme alle strutture amministrative e sociali (l'isolamento dei divisori esterni delle parti riscaldate insieme alla sostituzione di serramenti e porte di divisori esterni trasparenti e l'ammodernamento dell'illuminazione incorporata nell'edificio) e l'ammodernamento del processo produttivo dei corpi mobili. L'investimento riguarda i terreni 174/2, 174/3 e 174/4 a Piecki, a ul. Vittoria 32/14. Questo progetto è in linea con le ipotesi esposte nel POR SZOOP WiM per l'asse prioritario 4 Efficienza energetica per la misura 4.2. L'investimento riguarda un profondo e completo ammodernamento energetico dell'edificio appartenente al richiedente, nonché l'ammodernamento delle linee di produzione dei corpi mobili, nonché la sostituzione delle attrezzature esistenti ad alta intensità energetica con l'utilizzo di una sega di ottimizzazione e di un centro di perforazione con migliori parametri tecnici, nonché la riduzione del sistema produttivo di spostamento da: 2 turni dopo 8 ore a un turno 8 ore di lavoro nella sala di produzione. Il richiedente appartiene a una PMI e sono stati sviluppati audit energetici prima di presentare la domanda, mostrando una serie di azioni nell'impresa che migliorano la sua efficienza energetica. Il progetto sarà attuato nel periodo dal primo trimestre 2018 al quarto trimestre 2019. Grazie all'investimento, l'efficienza energetica in azienda aumenterà del 34,92 %, mentre la riduzione di CO2 in atmosfera raggiungerà il 66,10 %. Il richiedente deve avere la piena capacità di attuare correttamente il progetto conformemente ai criteri al riguardo. (Italian) / qualifier | |||||||||||||||
point in time: 15 January 2022
|
Revision as of 15:09, 15 January 2022
Project Q132199 in Poland
Language | Label | Description | Also known as |
---|---|---|---|
English | Improving energy efficiency in the company D.C.M, Sp. z o.o. through the thermal modernisation of the upholstery hall and the administrative and social building and modernisation of the production and assembly of furniture bodies. |
Project Q132199 in Poland |
Statements
1,677,513.47 zloty
0 references
2,309,670.2 zloty
0 references
72.63 percent
0 references
24 January 2018
0 references
31 December 2019
0 references
D.C.M. SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ
0 references
Przedmiotem projektu jest termomodernizacja budynku hali tapicerni wraz z zapleczem administracyjno-socjalnym (docieplenie przegród zewnętrznych części ogrzewanych wraz z wymianą stolarki okiennej i drzwiowej zewnętrznych przegród przezroczystych oraz modernizacja oświetlenia wbudowanego w budynku) oraz modernizacja procesu produkcji korpusów meblowych. Inwestycja dotyczy działek nr 174/2, 174/3 i 174/4 w miejscowości Piecki, pod adresem ul. Zwycięstwa 32/14. Niniejszy projekt wpisuje się w założenia określone w SzOOP RPO WiM dla Osi priorytetowej 4 Efektywność energetyczna dla działania 4.2. Inwestycja dotyczy głębokiej, kompleksowej modernizacji energetycznej budynku należącego do Wnioskodawcy wraz z modernizacją linii produkcyjnych produkcji korpusów meblowych wraz z wymianą istniejących energochłonnych urządzeń na nowe z wykorzystaniem pilarki optymalizującej oraz centrum wiertarskim o lepszych parametrach technicznych wraz ze ograniczeniem systemu zmianowego produkcji z: 2 zmian po 8 godzin do jednej zmiany 8 godzin pracy na hali produkcyjnej. Wnioskodawca należy do MŚP, przed przystąpieniem do złożenia wniosku zostały opracowane audyty energetyczne, w którym pokazany został zestaw działań w przedsiębiorstwie zwiększający jego efektywność energetyczną. Projekt będzie realizowany w okresie od I kw 2018 r do IV kw 2019 r. Dzięki realizacji inwestycji efektywność energetyczna w przedsiębiorstwie wzrośnie o 34,92 %, natomiast redukcja CO2 do atmosfery wyniesie 66,10%. Wnioskodawca posiada pełną zdolność realizacyjną do prawidłowej realizacji projektu zgodnie z zapisami kryteriów w tym zakresie. (Polish)
0 references
The subject of the project is the thermal modernisation of the building of the upholstery hall with administrative and social facilities (warming of the outer partitions heated together with the replacement of window and door carpentry of external transparent bulkheads and modernisation of built-in lighting in the building) and modernisation of the production process of furniture bodies. The investment concerns plots no. 174/2, 174/3 and 174/4 in Piecki, at ul. Wins 32/14. This project fits into the assumptions set out in the WiM ROP for Priority Axis 4 Energy Efficiency for Action 4.2. The investment concerns a deep, comprehensive energy modernisation of the building belonging to the Applicant together with the modernisation of the production lines of furniture body production, together with the replacement of existing energy-intensive equipment with the use of an optimisation saw and a drilling centre with better technical parameters, with the limitation of the changing system of production from: 2 changes after 8 hours to one shift 8 hours working in the production hall. The applicant belongs to SMEs, prior to the submission of the application, energy audits were developed, in which a set of activities in an undertaking increasing its energy efficiency was presented. The project will be implemented in the period from the first quarter of 2018 to the fourth quarter of 2019. Thanks to the investment, energy efficiency in the company will increase by 34.92 % and the reduction of CO2 to the atmosphere will amount to 66.10 %. The applicant shall have the full capacity to carry out the project correctly in accordance with the criteria in this respect. (English)
21 October 2020
0 references
L’objet du projet est la thermomodernisation du bâtiment d’ameublement avec les installations administratives et sociales (l’isolation des cloisons extérieures des pièces chauffées ainsi que le remplacement de la menuiserie des fenêtres et des portes des cloisons transparentes extérieures et la modernisation de l’éclairage intégré dans le bâtiment) et la modernisation du processus de production des carrosseries de meubles. L’investissement concerne les parcelles nos 174/2, 174/3 et 174/4 à Piecki, à ul. Victoire 32/14. Ce projet est conforme aux hypothèses énoncées dans la norme SzOOP ROP WiM pour l’axe prioritaire 4 Efficacité énergétique pour la mesure 4.2. L’investissement concerne une modernisation énergétique approfondie et complète du bâtiment appartenant à la requérante, ainsi que la modernisation des lignes de production des carrosseries de meubles, ainsi que le remplacement des équipements à forte intensité énergétique par l’utilisation d’une scie d’optimisation et d’un centre de forage avec de meilleurs paramètres techniques, ainsi que la réduction du système de production en mutation: 2 quarts après 8 heures à un quart 8 heures de travail dans le hall de production. Le demandeur appartient à une PME et des audits énergétiques ont été réalisés avant la présentation de la demande, montrant un ensemble d’actions dans l’entreprise visant à améliorer son efficacité énergétique. Le projet sera mis en œuvre au cours de la période allant du premier trimestre 2018 au quatrième trimestre 2019. Grâce à l’investissement, l’efficacité énergétique de l’entreprise augmentera de 34,92 %, tandis que la réduction du CO2 dans l’atmosphère atteindra 66,10 %. Le demandeur doit avoir la pleine capacité de mettre en œuvre le projet correctement conformément aux critères à cet égard. (French)
2 December 2021
0 references
Gegenstand des Projekts ist die Thermomodernisierung des Polstergebäudes zusammen mit den administrativen und sozialen Einrichtungen (die Isolierung der äußeren Trennwände der beheizten Teile zusammen mit dem Austausch von Fenster- und Türtischlereien von äußeren transparenten Trennwänden und Modernisierung der in das Gebäude eingebauten Beleuchtung) und Modernisierung des Produktionsprozesses von Möbelkörpern. Die Investition betrifft die Parzellen Nr. 174/2, 174/3 und 174/4 in Piecki, at ul. Sieg 32/14. Dieses Projekt steht im Einklang mit den Annahmen des SzOOP ROP WiM für Prioritätsachse 4 Energieeffizienz für Maßnahme 4.2. Die Investition betrifft eine tiefgreifende, umfassende Energiemodernisierung des zum Antragsteller gehörenden Gebäudes zusammen mit der Modernisierung der Produktionslinien von Möbelkörpern sowie die Ersetzung bestehender energieintensiver Anlagen durch den Einsatz einer Optimierungssäge und eines Bohrzentrums mit besseren technischen Parametern sowie die Reduzierung des sich verlagernden Produktionssystems von: 2 Schichten nach 8 Stunden auf eine Schicht 8 Stunden arbeiten in der Produktionshalle. Der Antragsteller gehört zu einem KMU-Audits, und vor der Einreichung des Antrags wurden Energieaudits entwickelt, die eine Reihe von Maßnahmen im Unternehmen zur Verbesserung der Energieeffizienz aufzeigen. Das Projekt wird im Zeitraum vom 1. Quartal 2018 bis zum 4. Quartal 2019 umgesetzt. Dank der Investition wird die Energieeffizienz im Unternehmen um 34,92 % steigen, während die Reduktion von CO2 in die Atmosphäre 66,10 % erreichen wird. Der Antragsteller muss in vollem Umfang in der Lage sein, das Projekt entsprechend den einschlägigen Kriterien ordnungsgemäß durchzuführen. (German)
9 December 2021
0 references
Het doel van het project is de thermomodernisering van het bekledingsgebouw samen met de administratieve en sociale voorzieningen (de isolatie van de buitenwanden van de verwarmde delen samen met de vervanging van raam- en deurschrijnwerk van externe transparante scheidingswanden en modernisering van de in het gebouw ingebouwde verlichting) en modernisering van het productieproces van meubellichamen. De investering betreft de percelen nrs. 174/2, 174/3 en 174/4 in Piecki, te ul. Overwinning 32/14. Dit project is in overeenstemming met de veronderstellingen in het SzOOP ROP WiM voor prioritaire as 4 Energie-efficiëntie voor maatregel 4.2. De investering betreft een grondige, alomvattende energie-modernisering van het gebouw van verzoekster, samen met de modernisering van de productielijnen van meubellichamen, samen met de vervanging van bestaande energie-intensieve apparatuur door het gebruik van een optimaliseringszaag en een boorcentrum met betere technische parameters, samen met de vermindering van het verschuivende productiesysteem van: 2 ploegen na 8 uur naar één ploeg 8 uur werkend in de productiehal. De aanvrager maakt deel uit van een kmo-audit en er zijn vóór de indiening van de aanvraag energieaudits ontwikkeld, waaruit een reeks acties in het bedrijf blijkt om haar energie-efficiëntie te verbeteren. Het project wordt uitgevoerd in de periode van het eerste kwartaal van 2018 tot het vierde kwartaal van 2019. Dankzij de investering zal de energie-efficiëntie in het bedrijf met 34,92 % toenemen, terwijl de reductie van CO2 in de atmosfeer 66,10 % zal bedragen. De aanvrager beschikt over de volledige capaciteit om het project correct uit te voeren overeenkomstig de criteria in dit verband. (Dutch)
17 December 2021
0 references
Oggetto del progetto è la termomodernizzazione dell'edificio imbottito insieme alle strutture amministrative e sociali (l'isolamento dei divisori esterni delle parti riscaldate insieme alla sostituzione di serramenti e porte di divisori esterni trasparenti e l'ammodernamento dell'illuminazione incorporata nell'edificio) e l'ammodernamento del processo produttivo dei corpi mobili. L'investimento riguarda i terreni 174/2, 174/3 e 174/4 a Piecki, a ul. Vittoria 32/14. Questo progetto è in linea con le ipotesi esposte nel POR SZOOP WiM per l'asse prioritario 4 Efficienza energetica per la misura 4.2. L'investimento riguarda un profondo e completo ammodernamento energetico dell'edificio appartenente al richiedente, nonché l'ammodernamento delle linee di produzione dei corpi mobili, nonché la sostituzione delle attrezzature esistenti ad alta intensità energetica con l'utilizzo di una sega di ottimizzazione e di un centro di perforazione con migliori parametri tecnici, nonché la riduzione del sistema produttivo di spostamento da: 2 turni dopo 8 ore a un turno 8 ore di lavoro nella sala di produzione. Il richiedente appartiene a una PMI e sono stati sviluppati audit energetici prima di presentare la domanda, mostrando una serie di azioni nell'impresa che migliorano la sua efficienza energetica. Il progetto sarà attuato nel periodo dal primo trimestre 2018 al quarto trimestre 2019. Grazie all'investimento, l'efficienza energetica in azienda aumenterà del 34,92 %, mentre la riduzione di CO2 in atmosfera raggiungerà il 66,10 %. Il richiedente deve avere la piena capacità di attuare correttamente il progetto conformemente ai criteri al riguardo. (Italian)
15 January 2022
0 references