Comprehensive thermal modernisation with RES elements of the building at ul. Traugutta 27 in Elbląg (Q132428): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in nl, and other parts: Adding Dutch translations)
(‎Changed label, description and/or aliases in it, and other parts: Adding Italian translations)
label / itlabel / it
 
Termomodernizzazione complessa con elementi RES dell'edificio a ul. Traugutta 27 a Elbląg
Property / summary
 
L'obiettivo principale del progetto è la profonda termomodernizzazione, combinata con l'utilizzo di pannelli fotovoltaici FER in un edificio (edificio unico) di proprietà di SM Parków a Elbląg, a ul. Traugutta 27, situata sui terreni 238 e 239. Si trova nella parte settentrionale del quartiere Downtown ed è utilizzato come un edificio residenziale multifamiliare con locali di servizio al piano terra. L'edificio è indipendente, seminterrato, ha cinque piani terra — piano terra, 3 piani e mansarda. È stato commissionato nel 1995. L'edificio ha 22 abitazioni e 9 unità di utilità — per un totale di 75 utenti. Il progetto prevede lavori preparatori sotto forma di: progetto di audit energetico e di termomodernizzazione e costruzione, compreso lo smantellamento di grondaie e tubi di scarico esistenti, sistemi di fulmini, illuminazione e altri elementi collegati alla facciata; isolamento delle pareti esterne dell'edificio dall'esterno; riscaldamento delle finestre e dei telai delle porte dall'altro lato, rendendo una struttura in legno per fissare un ulteriore riscaldamento del tetto inclinato dall'interno; riscaldamento dell'edificio; isolamento delle pareti delle scale e installazione di pannelli fotovoltaici (sul tetto dell'impianto), unitamente all'utilizzo di ICT sotto forma di software basato sullo standard di "servizio intelligente". Il progetto deve essere dotato di adeguate autorizzazioni di attuazione. Il richiedente ha un contraente d'investimento selezionato conformemente al principio di competitività. Il progetto è in linea con le ipotesi esposte nel ROP WiM SzOOP per l'asse 4, secondo cui si ipotizza un aumento della capacità di generazione basata sulle fonti energetiche rinnovabili — il progetto ne assume l'applicazione e prevede anche l'efficienza energetica nel settore residenziale, che mira a ridurre le emissioni di CO2. Inoltre, il progetto è in linea con PI 4c — il settore residenziale, che ridurrà i consumi energetici in primo luogo, ridurrà la domanda di calore e ridurrà le emissioni di gas a effetto serra. (Italian)
Property / summary: L'obiettivo principale del progetto è la profonda termomodernizzazione, combinata con l'utilizzo di pannelli fotovoltaici FER in un edificio (edificio unico) di proprietà di SM Parków a Elbląg, a ul. Traugutta 27, situata sui terreni 238 e 239. Si trova nella parte settentrionale del quartiere Downtown ed è utilizzato come un edificio residenziale multifamiliare con locali di servizio al piano terra. L'edificio è indipendente, seminterrato, ha cinque piani terra — piano terra, 3 piani e mansarda. È stato commissionato nel 1995. L'edificio ha 22 abitazioni e 9 unità di utilità — per un totale di 75 utenti. Il progetto prevede lavori preparatori sotto forma di: progetto di audit energetico e di termomodernizzazione e costruzione, compreso lo smantellamento di grondaie e tubi di scarico esistenti, sistemi di fulmini, illuminazione e altri elementi collegati alla facciata; isolamento delle pareti esterne dell'edificio dall'esterno; riscaldamento delle finestre e dei telai delle porte dall'altro lato, rendendo una struttura in legno per fissare un ulteriore riscaldamento del tetto inclinato dall'interno; riscaldamento dell'edificio; isolamento delle pareti delle scale e installazione di pannelli fotovoltaici (sul tetto dell'impianto), unitamente all'utilizzo di ICT sotto forma di software basato sullo standard di "servizio intelligente". Il progetto deve essere dotato di adeguate autorizzazioni di attuazione. Il richiedente ha un contraente d'investimento selezionato conformemente al principio di competitività. Il progetto è in linea con le ipotesi esposte nel ROP WiM SzOOP per l'asse 4, secondo cui si ipotizza un aumento della capacità di generazione basata sulle fonti energetiche rinnovabili — il progetto ne assume l'applicazione e prevede anche l'efficienza energetica nel settore residenziale, che mira a ridurre le emissioni di CO2. Inoltre, il progetto è in linea con PI 4c — il settore residenziale, che ridurrà i consumi energetici in primo luogo, ridurrà la domanda di calore e ridurrà le emissioni di gas a effetto serra. (Italian) / rank
 
Normal rank
Property / summary: L'obiettivo principale del progetto è la profonda termomodernizzazione, combinata con l'utilizzo di pannelli fotovoltaici FER in un edificio (edificio unico) di proprietà di SM Parków a Elbląg, a ul. Traugutta 27, situata sui terreni 238 e 239. Si trova nella parte settentrionale del quartiere Downtown ed è utilizzato come un edificio residenziale multifamiliare con locali di servizio al piano terra. L'edificio è indipendente, seminterrato, ha cinque piani terra — piano terra, 3 piani e mansarda. È stato commissionato nel 1995. L'edificio ha 22 abitazioni e 9 unità di utilità — per un totale di 75 utenti. Il progetto prevede lavori preparatori sotto forma di: progetto di audit energetico e di termomodernizzazione e costruzione, compreso lo smantellamento di grondaie e tubi di scarico esistenti, sistemi di fulmini, illuminazione e altri elementi collegati alla facciata; isolamento delle pareti esterne dell'edificio dall'esterno; riscaldamento delle finestre e dei telai delle porte dall'altro lato, rendendo una struttura in legno per fissare un ulteriore riscaldamento del tetto inclinato dall'interno; riscaldamento dell'edificio; isolamento delle pareti delle scale e installazione di pannelli fotovoltaici (sul tetto dell'impianto), unitamente all'utilizzo di ICT sotto forma di software basato sullo standard di "servizio intelligente". Il progetto deve essere dotato di adeguate autorizzazioni di attuazione. Il richiedente ha un contraente d'investimento selezionato conformemente al principio di competitività. Il progetto è in linea con le ipotesi esposte nel ROP WiM SzOOP per l'asse 4, secondo cui si ipotizza un aumento della capacità di generazione basata sulle fonti energetiche rinnovabili — il progetto ne assume l'applicazione e prevede anche l'efficienza energetica nel settore residenziale, che mira a ridurre le emissioni di CO2. Inoltre, il progetto è in linea con PI 4c — il settore residenziale, che ridurrà i consumi energetici in primo luogo, ridurrà la domanda di calore e ridurrà le emissioni di gas a effetto serra. (Italian) / qualifier
 
point in time: 15 January 2022
Timestamp+2022-01-15T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 15:08, 15 January 2022

Project Q132428 in Poland
Language Label Description Also known as
English
Comprehensive thermal modernisation with RES elements of the building at ul. Traugutta 27 in Elbląg
Project Q132428 in Poland

    Statements

    0 references
    349,547.87 zloty
    0 references
    83,891.49 Euro
    13 January 2020
    0 references
    432,074.01 zloty
    0 references
    103,697.76 Euro
    13 January 2020
    0 references
    80.9 percent
    0 references
    31 March 2015
    0 references
    31 December 2019
    0 references
    SPÓŁDZIELNIA MIESZKANIOWA "PARKOWA" W ELBLĄGU
    0 references
    0 references

    54°11'56.0"N, 19°26'28.0"E
    0 references
    Głównym założeniem projektu jest głęboka termomodernizacji, połączona z wykorzystaniem OZE – paneli fotowoltaicznych w budynku (pojedynczy budynek) będącym własnością SM Parkowa w Elblągu, przy ul. Traugutta 27, umiejscowionym na działkach o numerach 238 i 239. Obiekt jest położony w północnej części dzielnicy Śródmieście i jest wykorzystywany jako budynek mieszkalny wielorodzinny z lokalami usługowymi na parterze. Obiekt jest wolnostojący, podpiwniczony, posiada pięć kondygnacji naziemnych – parter, 3 piętra oraz poddasze użytkowe. Został oddany do użytku w 1995 r. W budynku są 22 lokale mieszkalne i 9 użytkowych - łącznie 75 użytkowników. Projekt przewiduje prace przygotowawcze w postaci: audytu energetycznego oraz projektu termomodernizacji i budowlane w tym m.in. demontaż istniejących rynien i rur spustowych, instalacji odgromowej, oświetlenia i innych elementów mocowanych do elewacji; docieplenie ścian zew. budynku od zew.; ocieplenie ościeży okiennych i drzwiowych od zew. wykonanie konstrukcji drewnianej do zamocowania dodatkowego ocieplenia dachu skośnego od wewnątrz; ocieplenie stropodachu budynku; ocieplenie ścian klatek schodowych, a także instalację paneli fotowoltaicznych (na dachu obiektu), wraz z wykorzystaniem TIK w postaci oprogramowania bazującego na standardzie „inteligentnego serwisu”. Projekt posiada stosowne zezwolenia na realizację. Wnioskodawca posiada wykonawcę prac inwestycyjnych, który został wybrany zgodnie z zasadą konkurencyjności. Projekt wpisuje się w założenia określone w SzOOP RPO WiM dla Osi 4, zgodnie z którymi zakłada się wzrost mocy wytwórczych w oparciu o OZE – projekt zakłada ich zastosowanie, a także przewiduje racjonalizację zużycia energii w sektorze mieszkaniowym, które zmierza do redukcji emisji CO2. Ponadto projekt jest zgodny z PI 4c – sektor mieszkaniowym, w którym nastąpi obniżenie zużycia energii pierw. i zmniejszy się zapotrzebowanie na ciepło, a także nastąpi spadek emisji gazów cieplarnianych. (Polish)
    0 references
    The main objective of the project is a deep thermomodernisation, combined with the use of RES – photovoltaic panels in the building (single building) owned by SM Parkow in Elbląg, on ul. Traugutta 27, located on plots numbered 238 and 239. It is located in the northern part of the Śródmieście district and is used as a multi-family residential building with services on the ground floor. The building is freestanding, cellared and has five floors on the ground floor, 3 floors and a utility loft. It was opened in 1995. In the building there are 22 residential units and 9 utility premises – a total of 75 users. The project envisages preparatory work in the form of: energy audit and thermal modernisation and construction projects, including dismantling of existing gutters and drain pipes, lightning systems, lighting and other facade fixtures; warming of the walls of the building from the call; warming of window and door frames from the so-called wooden structure for mounting additional inclined roof insulation; warming of the ceiling of the building; insulation of stairway walls, as well as installation of photovoltaic panels (on the roof of an object), together with the use of ICT in the form of software based on the “smart service” standard. The project has appropriate permits for implementation. The applicant has an investment contractor selected in accordance with the principle of competitiveness. The project is part of the assumptions set out in the SzOOP RPO WiM for Axis 4, according to which an increase in production capacity based on RES is assumed – the project assumes their application and provides for energy efficiency in the housing sector, which aims to reduce CO2 emissions. Moreover, the project is in line with PI 4c – the housing sector, which will reduce energy consumption first, reduce the demand for heat and reduce greenhouse gas emissions. (English)
    21 October 2020
    0 references
    L’objectif principal du projet est la thermomodernisation profonde, combinée à l’utilisation de panneaux photovoltaïques SER dans un bâtiment (bâtiment unique) appartenant à SM Parków à Elbląg, à ul. Traugutta 27, située sur les parcelles 238 et 239. Il est situé dans la partie nord du quartier du centre-ville et est utilisé comme un immeuble résidentiel multifamilial avec des locaux de service au rez-de-chaussée. Le bâtiment est détaché, sous-sol, a cinq rez-de-chaussée — rez-de-chaussée, 3 étages et grenier. Il a été mis en service en 1995. Le bâtiment compte 22 logements et 9 unités d’utilité publique, soit un total de 75 utilisateurs. Le projet prévoit des travaux préparatoires sous la forme: audit énergétique et projet de thermomodernisation et de construction, y compris le démantèlement des gouttières et tuyaux de drainage existants, des systèmes de foudre, de l’éclairage et d’autres éléments attachés à la façade; isolation des murs extérieurs du bâtiment de l’extérieur; le réchauffement des cadres de fenêtres et de portes de l’autre côté, en faisant une structure en bois pour fixer un réchauffement supplémentaire du toit incliné de l’intérieur; le réchauffement du bâtiment; isolation des murs d’escalier, ainsi que l’installation de panneaux photovoltaïques (sur le toit de l’installation), ainsi que l’utilisation des TIC sous forme de logiciels basés sur la norme de «service intelligent». Le projet doit être doté d’un permis de mise en œuvre approprié. Le demandeur a un entrepreneur d’investissement qui a été sélectionné conformément au principe de compétitivité. Le projet est conforme aux hypothèses énoncées dans le SzOOP WiM ROP pour l’axe 4, selon lesquels une augmentation de la capacité de production fondée sur les sources d’énergie renouvelables est supposée — le projet suppose leur application et prévoit également l’efficacité énergétique dans le secteur résidentiel, qui vise à réduire les émissions de CO2. En outre, le projet est conforme à l’IP 4c — le secteur résidentiel, qui réduira d’abord la consommation d’énergie, la demande de chaleur et les émissions de gaz à effet de serre. (French)
    2 December 2021
    0 references
    Das Hauptziel des Projekts ist eine tiefgreifende Thermomodernisierung, kombiniert mit der Nutzung von RES – Photovoltaik-Panels in einem Gebäude (Einzelgebäude) im Besitz des SM Parków in Elbląg, in ul. Traugutta 27, auf den Grundstücken 238 und 239. Es befindet sich im nördlichen Teil des Stadtzentrums und wird als Mehrfamilienhaus mit Serviceeinrichtungen im Erdgeschoss genutzt. Das Gebäude ist freistehend, Keller, hat fünf Erdgeschoss – Erdgeschoss, 3 Etagen und Dachboden. Es wurde 1995 in Betrieb genommen. Das Gebäude verfügt über 22 Wohnungen und 9 Versorgungseinheiten – insgesamt 75 Nutzer. Das Projekt sieht Vorbereitungsarbeiten in folgender Form vor: Energieaudit und Thermomodernisierungs- und Bauvorhaben, einschließlich des Abbaus bestehender Rinnen und Abflussrohre, Blitzsysteme, Beleuchtung und andere an der Fassade befestigte Elemente; Isolierung der Außenwände des Gebäudes von außen; Erwärmung von Fenster und Türrahmen von der anderen Seite, so dass eine Holzkonstruktion, um eine zusätzliche Erwärmung des schrägen Daches von innen zu befestigen; Erwärmung des Gebäudes; Isolierung von Treppenwänden sowie Installation von Photovoltaik-Panels (auf dem Dach der Anlage) zusammen mit dem Einsatz von IKT in Form von Software auf Basis des Standards des „intelligenten Dienstes“. Das Projekt muss über entsprechende Durchführungsgenehmigungen verfügen. Der Antragsteller verfügt über einen Investitionsvertragspartner, der nach dem Grundsatz der Wettbewerbsfähigkeit ausgewählt wurde. Das Projekt steht im Einklang mit den im SzOOP WiM ROP für Achse 4 dargelegten Annahmen, wonach eine Erhöhung der Erzeugungskapazität auf Basis von RES angenommen wird – das Projekt geht von deren Anwendung aus und sieht auch Energieeffizienz in der Wohnwirtschaft vor, die auf eine Verringerung der CO2-Emissionen abzielt. Darüber hinaus steht das Projekt im Einklang mit PI 4c – dem Wohnsektor, der zunächst den Energieverbrauch senken, den Wärmebedarf verringern und die Treibhausgasemissionen senken wird. (German)
    9 December 2021
    0 references
    Het hoofddoel van het project is diepe thermomodernisering, gecombineerd met het gebruik van RES — fotovoltaïsche panelen in een gebouw (enkel gebouw) dat eigendom is van SM Parków in Elbląg, te ul. Traugutta 27, gelegen op percelen 238 en 239. Het is gelegen in het noordelijke deel van de wijk Downtown en wordt gebruikt als een meergezinswoning met woongebouwen op de begane grond. Het gebouw is vrijstaand, kelder, heeft vijf begane grond — begane grond, 3 verdiepingen en zolder. Het gebouw werd in 1995 in gebruik genomen en telt 22 woningen en 9 nutsvoorzieningen — in totaal 75 gebruikers. Het project voorziet in voorbereidende werkzaamheden in de vorm van: energieaudit en thermomoderniserings- en bouwproject, met inbegrip van de ontmanteling van bestaande goten en afvoerleidingen, bliksemsystemen, verlichting en andere elementen die aan de gevel zijn bevestigd; isolatie van buitenmuren van het gebouw van buitenaf; opwarming van het raam en deurkozijnen van de andere kant, waardoor een houten structuur om een extra opwarming van het schuine dak van de binnenkant te bevestigen; opwarming van het gebouw; isolatie van trappenwanden, installatie van fotovoltaïsche panelen (op het dak van de faciliteit), samen met het gebruik van ICT in de vorm van software op basis van de standaard van „slimme service”. Het project moet over passende uitvoeringsvergunningen beschikken. De aanvrager heeft een investeringscontractant die is geselecteerd overeenkomstig het beginsel van concurrentievermogen. Het project is in overeenstemming met de veronderstellingen in het SzOOP WiM ROP voor as 4, volgens welke een toename van de opwekkingscapaciteit op basis van hernieuwbare energiebronnen wordt verondersteld — het project gaat uit van de toepassing ervan en voorziet ook in energie-efficiëntie in de residentiële sector, die tot doel heeft de CO2-uitstoot te verminderen. Daarnaast is het project in overeenstemming met PI 4c — de residentiële sector, die het energieverbruik eerst zal verminderen, de vraag naar warmte zal verminderen en de uitstoot van broeikasgassen zal verminderen. (Dutch)
    17 December 2021
    0 references
    L'obiettivo principale del progetto è la profonda termomodernizzazione, combinata con l'utilizzo di pannelli fotovoltaici FER in un edificio (edificio unico) di proprietà di SM Parków a Elbląg, a ul. Traugutta 27, situata sui terreni 238 e 239. Si trova nella parte settentrionale del quartiere Downtown ed è utilizzato come un edificio residenziale multifamiliare con locali di servizio al piano terra. L'edificio è indipendente, seminterrato, ha cinque piani terra — piano terra, 3 piani e mansarda. È stato commissionato nel 1995. L'edificio ha 22 abitazioni e 9 unità di utilità — per un totale di 75 utenti. Il progetto prevede lavori preparatori sotto forma di: progetto di audit energetico e di termomodernizzazione e costruzione, compreso lo smantellamento di grondaie e tubi di scarico esistenti, sistemi di fulmini, illuminazione e altri elementi collegati alla facciata; isolamento delle pareti esterne dell'edificio dall'esterno; riscaldamento delle finestre e dei telai delle porte dall'altro lato, rendendo una struttura in legno per fissare un ulteriore riscaldamento del tetto inclinato dall'interno; riscaldamento dell'edificio; isolamento delle pareti delle scale e installazione di pannelli fotovoltaici (sul tetto dell'impianto), unitamente all'utilizzo di ICT sotto forma di software basato sullo standard di "servizio intelligente". Il progetto deve essere dotato di adeguate autorizzazioni di attuazione. Il richiedente ha un contraente d'investimento selezionato conformemente al principio di competitività. Il progetto è in linea con le ipotesi esposte nel ROP WiM SzOOP per l'asse 4, secondo cui si ipotizza un aumento della capacità di generazione basata sulle fonti energetiche rinnovabili — il progetto ne assume l'applicazione e prevede anche l'efficienza energetica nel settore residenziale, che mira a ridurre le emissioni di CO2. Inoltre, il progetto è in linea con PI 4c — il settore residenziale, che ridurrà i consumi energetici in primo luogo, ridurrà la domanda di calore e ridurrà le emissioni di gas a effetto serra. (Italian)
    15 January 2022
    0 references

    Identifiers

    RPWM.04.03.02-28-0079/17
    0 references