Increase the connectivity of new renewable electricity generation units through the construction and modernisation of the SN network at the Olsztyn ENERGA-OPERATOR SA Branch (Q131699): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in nl, and other parts: Adding Dutch translations)
(‎Changed label, description and/or aliases in it, and other parts: Adding Italian translations)
label / itlabel / it
 
Aumentare il potenziale di collegamento di nuove unità di produzione di energia elettrica da fonti rinnovabili attraverso la costruzione e l'ammodernamento della rete SN presso la filiale Olsztyn ENERGA-OPERATOR SA
Property / summary
 
L'ambito del progetto comprende la costruzione e la ricostruzione di linee elettriche a media tensione (SN) situate nell'area operativa di Olsztyn ENERGA-OPERATOR SA Branch. Il progetto copre 9 progetti di investimento previsti per l'attuazione nel 2018 e nel 2019 nel Voivodato di Warmińsko-Mazurskie, nei comuni: Małdyty, Morąg, città di Nidzica, Bishtinek, Reszel, Piecki, Natale, Ostróda, Gietrzwałd, Iława e Iława City. La portata dettagliata, vale a dire l'ubicazione precisa del progetto (comuni, località, indirizzi e numero di parcella), la portata materiale dei singoli compiti (elementi tecnici, tipo di infrastruttura, quantità), una descrizione della soluzione scelta e le condizioni tecniche di attuazione, nonché la determinazione se gli elementi infrastrutturali siano nuovi, modernizzati, adattati o meno oggetto di modernizzazione, cfr. il capitolo 2.2 dello studio di fattibilità e l'allegato 1 dello studio di fattibilità. L'ambito materiale del progetto e le soluzioni tecnologiche selezionate comprendono: costruzione di nuovi collegamenti via cavo di linee SN esistenti e di un nuovo cavo di uscita da GPZ, ricostruzione delle uscite e degli approcci delle linee di cavi SN da GPZ, sostituzione di vecchie linee elettriche aeree non isolate sulla sezione della linea di media tensione da 15 kV esistente in nuove linee non isolate. I compiti di investimento proposti aumenteranno la possibilità di collegare alla rete nuove unità di produzione di energia elettrica da fonti rinnovabili e microimpianti in modo da garantire la sicurezza del funzionamento delle reti elettriche OSD. La lunghezza della rete di nuova costruzione 21,205 km. La lunghezza della rete modernizzata 2,475 km. (Italian)
Property / summary: L'ambito del progetto comprende la costruzione e la ricostruzione di linee elettriche a media tensione (SN) situate nell'area operativa di Olsztyn ENERGA-OPERATOR SA Branch. Il progetto copre 9 progetti di investimento previsti per l'attuazione nel 2018 e nel 2019 nel Voivodato di Warmińsko-Mazurskie, nei comuni: Małdyty, Morąg, città di Nidzica, Bishtinek, Reszel, Piecki, Natale, Ostróda, Gietrzwałd, Iława e Iława City. La portata dettagliata, vale a dire l'ubicazione precisa del progetto (comuni, località, indirizzi e numero di parcella), la portata materiale dei singoli compiti (elementi tecnici, tipo di infrastruttura, quantità), una descrizione della soluzione scelta e le condizioni tecniche di attuazione, nonché la determinazione se gli elementi infrastrutturali siano nuovi, modernizzati, adattati o meno oggetto di modernizzazione, cfr. il capitolo 2.2 dello studio di fattibilità e l'allegato 1 dello studio di fattibilità. L'ambito materiale del progetto e le soluzioni tecnologiche selezionate comprendono: costruzione di nuovi collegamenti via cavo di linee SN esistenti e di un nuovo cavo di uscita da GPZ, ricostruzione delle uscite e degli approcci delle linee di cavi SN da GPZ, sostituzione di vecchie linee elettriche aeree non isolate sulla sezione della linea di media tensione da 15 kV esistente in nuove linee non isolate. I compiti di investimento proposti aumenteranno la possibilità di collegare alla rete nuove unità di produzione di energia elettrica da fonti rinnovabili e microimpianti in modo da garantire la sicurezza del funzionamento delle reti elettriche OSD. La lunghezza della rete di nuova costruzione 21,205 km. La lunghezza della rete modernizzata 2,475 km. (Italian) / rank
 
Normal rank
Property / summary: L'ambito del progetto comprende la costruzione e la ricostruzione di linee elettriche a media tensione (SN) situate nell'area operativa di Olsztyn ENERGA-OPERATOR SA Branch. Il progetto copre 9 progetti di investimento previsti per l'attuazione nel 2018 e nel 2019 nel Voivodato di Warmińsko-Mazurskie, nei comuni: Małdyty, Morąg, città di Nidzica, Bishtinek, Reszel, Piecki, Natale, Ostróda, Gietrzwałd, Iława e Iława City. La portata dettagliata, vale a dire l'ubicazione precisa del progetto (comuni, località, indirizzi e numero di parcella), la portata materiale dei singoli compiti (elementi tecnici, tipo di infrastruttura, quantità), una descrizione della soluzione scelta e le condizioni tecniche di attuazione, nonché la determinazione se gli elementi infrastrutturali siano nuovi, modernizzati, adattati o meno oggetto di modernizzazione, cfr. il capitolo 2.2 dello studio di fattibilità e l'allegato 1 dello studio di fattibilità. L'ambito materiale del progetto e le soluzioni tecnologiche selezionate comprendono: costruzione di nuovi collegamenti via cavo di linee SN esistenti e di un nuovo cavo di uscita da GPZ, ricostruzione delle uscite e degli approcci delle linee di cavi SN da GPZ, sostituzione di vecchie linee elettriche aeree non isolate sulla sezione della linea di media tensione da 15 kV esistente in nuove linee non isolate. I compiti di investimento proposti aumenteranno la possibilità di collegare alla rete nuove unità di produzione di energia elettrica da fonti rinnovabili e microimpianti in modo da garantire la sicurezza del funzionamento delle reti elettriche OSD. La lunghezza della rete di nuova costruzione 21,205 km. La lunghezza della rete modernizzata 2,475 km. (Italian) / qualifier
 
point in time: 15 January 2022
Timestamp+2022-01-15T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 14:57, 15 January 2022

Project Q131699 in Poland
Language Label Description Also known as
English
Increase the connectivity of new renewable electricity generation units through the construction and modernisation of the SN network at the Olsztyn ENERGA-OPERATOR SA Branch
Project Q131699 in Poland

    Statements

    0 references
    0 references
    0 references
    0 references
    3,761,728.26 zloty
    0 references
    902,814.78 Euro
    13 January 2020
    0 references
    6,358,567.04 zloty
    0 references
    1,526,056.09 Euro
    13 January 2020
    0 references
    59.16 percent
    0 references
    24 October 2018
    0 references
    30 June 2019
    0 references
    ENERGA-OPERATOR SPÓŁKA AKCYJNA
    0 references
    0 references

    54°5'12.1"N, 20°54'31.7"E
    0 references

    53°35'46.0"N, 19°34'34.0"E
    0 references

    54°2'53.9"N, 21°8'31.9"E
    0 references

    53°44'57.1"N, 21°20'28.3"E
    0 references

    53°21'41.0"N, 20°25'39.4"E
    0 references

    53°59'56.0"N, 22°19'6.2"E
    0 references

    53°44'52.8"N, 20°14'3.8"E
    0 references

    53°55'13.1"N, 19°44'30.1"E
    0 references

    53°54'43.2"N, 19°55'40.8"E
    0 references

    53°42'10.1"N, 19°57'46.4"E
    0 references
    Zakres projektu obejmuje budowę i przebudowę linii elektroenergetycznych średniego napięcia (SN) zlokalizowanych na terenie działania Oddziału Olsztyn ENERGA-OPERATOR SA Projekt obejmuje 9 zadań inwestycyjnych planowanych do realizacji w 2018 i 2019 r. na terenie województwa warmińsko-mazurskiego, na obszarze gmin: Małdyty, Morąg, Nidzica miasto, Bisztynek, Reszel, Piecki, Świętajno, Ostróda, Gietrzwałd, Iława i Iława Miasto. Szczegółowy zakres, tj. precyzyjne określenie miejsca Projektu (gminy, miejscowości, adresy i nr działek), zakres rzeczowy poszczególnych zadań (elementy techniczne, rodzaj infrastruktury, ilości) opis wybranego rozwiązania i techniczne uwarunkowania realizacyjne wraz z określeniem czy elementy infrastruktury są nowe, modernizowane, adaptowane czy niepodlegające modernizacji zawiera rozdział 2.2 studium wykonalności oraz Załącznik 1 do studium wykonalności. Zakres rzeczowy Projektu i wybrane rozwiązania technologiczne obejmują: budowę nowych powiązań kablowych istniejących linii SN oraz jednego nowego wyprowadzenia kablowego z GPZ, przebudowę wyprowadzeń oraz podejść linii kablowych SN z GPZ, wymianę starych nieizolowanych, napowietrznych przewodów elektroenergetycznych na odcinku istniejącej linii średniego napięcia 15 kV na nowe, niepełnoizolowane. Proponowane zadania inwestycyjne pozwolą zwiększyć możliwości przyłączania do sieci nowych jednostek wytwórczych energii elektrycznej z OZE oraz mikroinstalacji w sposób zapewniający bezpieczeństwo funkcjonowania sieci elektroenergetycznych OSD. Długość nowowobudowanej sieci 21,205 km. Długość zmodernizowanej sieci 2,475 km. (Polish)
    0 references
    The scope of the project includes the construction and reconstruction of medium voltage power lines (SN) located on the premises of the Olsztyn ENERGA-OPERATOR SA Branch The project comprises 9 investment tasks planned to be carried out in 2018 and 2019 in the Warmia-Mazury Voivodeship, in the area of communes: Małdyty, Morąg, Nidzica town, Bishtynek, Reszel, Piecki, Swiejno, Ostróda, Gietrzwald, Iława and Iława City. The detailed scope, i.e. precise determination of the location of the Project (communities, towns, addresses and plots), the material scope of individual tasks (technical elements, type of infrastructure, quantity) description of the chosen solution and technical implementation conditions, together with the determination of whether the infrastructure elements are new, modernised, adapted or not to be modernised, includes chapter 2.2 of the feasibility study and Appendix 1 to the feasibility study. The Project’s material scope and selected technological solutions include: construction of new cable connections of existing SN lines and one new cable outlet from GPZ, reconstruction of outlets and approaches of cable lines SN from GPZ, replacement of old non-insulated overhead power cables on the section of the existing medium voltage line of 15 kV with new, insulated. The proposed investment tasks will increase the ability to connect new RES generation units and micro-installations to the grid in such a way as to ensure the safety of OSD electricity grids. The length of the new network is 21.205 km. The length of the upgraded network is 2.475 km. (English)
    21 October 2020
    0 references
    Le projet comprend la construction et la reconstruction de lignes électriques à moyenne tension (SN) situées dans la zone d’exploitation de la branche Olsztyn ENERGA-OPERATOR SA. Le projet couvre 9 projets d’investissement dont la mise en œuvre est prévue en 2018 et 2019 dans la voïvodie de Warmińsko-Mazurskie, dans les communes: Małdyty, Morąg, Nidzica, Bishtinek, Reszel, Piecki, Noël, Ostróda, Gietrzwałd, Iława et Iława City. Le champ d’application détaillé, c’est-à-dire l’emplacement précis du projet (municipalités, localités, adresses et numéros de parcelle), la portée matérielle des différentes tâches (éléments techniques, type d’infrastructure, quantités), la description de la solution choisie et les conditions de mise en œuvre technique, ainsi que la détermination de la nouveauté, de la modernisation, de l’adaptation ou non de la modernisation des éléments d’infrastructure, voir le chapitre 2.2 de l’étude de faisabilité et l’annexe 1 de l’étude de faisabilité. Le champ d’application matériel du projet et les solutions technologiques sélectionnées comprennent: construction de nouvelles connexions de câbles des lignes SN existantes et d’une nouvelle sortie de câble de GPZ, reconstruction des sorties et approches des lignes de câbles SN à partir de GPZ, remplacement des anciennes lignes aériennes non isolées sur le tronçon de la ligne moyenne tension 15 kV existante en nouvelles lignes non isolées. Les tâches d’investissement proposées augmenteront la possibilité de connecter de nouvelles unités de production d’électricité à partir des SER et des micro-installations au réseau de manière à garantir la sécurité de l’exploitation des réseaux électriques OSD. La longueur du réseau nouvellement construit 21,205 km. La longueur du réseau modernisé 2,475 km. (French)
    2 December 2021
    0 references
    Das Projekt umfasst den Bau und den Wiederaufbau von Mittelspannungsleitungen (SN) innerhalb des Betriebsgebiets der Zweigstelle Olsztyn ENERGA-OPERATOR SA. Das Projekt umfasst neun Investitionsprojekte, die 2018 und 2019 in der Woiwodschaft Warmińsko-Mazurskie in den Gemeinden durchgeführt werden sollen: Małdyty, Morąg, Nidzica Stadt, Bishtinek, Reszel, Piecki, Weihnachten, Ostróda, Gietrzwałd, Iława und Iława Stadt. Der genaue Umfang, d. h. der genaue Standort des Projekts (Gemeinden, Ortschaften, Anschriften und Paketnummer), der sachliche Umfang der einzelnen Aufgaben (technische Elemente, Art der Infrastruktur, Mengen), eine Beschreibung der gewählten Lösung und die technischen Durchführungsbedingungen sowie die Feststellung, ob die Infrastrukturelemente neu, modernisiert, angepasst oder nicht modernisiert sind, siehe Kapitel 2.2 der Machbarkeitsstudie und Anhang 1 der Machbarkeitsstudie. Der materielle Umfang des Projekts und ausgewählte technologische Lösungen umfassen: Bau neuer Kabelanschlüsse bestehender SN-Leitungen und eines neuen Kabelausgangs von GPZ, Rekonstruktion von Ausgängen und Ansätzen von SN-Kabelleitungen von GPZ, Ersatz alter nicht isolierter Oberleitungen auf dem Abschnitt der bestehenden 15 kV Mittelspannungsleitung in neue, nicht isolierte. Die vorgeschlagenen Investitionsaufgaben werden die Möglichkeit erhöhen, neue Stromerzeugungsanlagen aus erneuerbaren Energiequellen und Kleinstanlagen an das Netz anzuschließen, um die Sicherheit des Betriebs der OSD-Stromnetze zu gewährleisten. Die Länge des neu errichteten Netzes 21,205 km. Die Länge des modernisierten Netzes 2,475 km. (German)
    9 December 2021
    0 references
    Het project omvat de bouw en wederopbouw van middenspanningsleidingen (SN) binnen het werkterrein van de afdeling Olsztyn ENERGA-OPERATOR SA. Het project bestrijkt 9 investeringsprojecten die in 2018 en 2019 in het Voivodeschap Warmińsko-Mazurskie zullen worden uitgevoerd, in de gemeenten: Małdyty, Morąg, Nidzica, Bishtinek, Reszel, Piecki, Kerstmis, Ostróda, Gietrzwałd, Iława en Iława City. De gedetailleerde reikwijdte, d.w.z. de precieze locatie van het project (gemeenten, plaatsen, adressen en perceelnummer), de materiële reikwijdte van de afzonderlijke taken (technische elementen, type infrastructuur, hoeveelheden), een beschrijving van de gekozen oplossing en de technische uitvoeringsvoorwaarden, samen met de vaststelling of de infrastructuurelementen nieuw, gemoderniseerd, aangepast of niet gemoderniseerd zijn, zie hoofdstuk 2.2 van de haalbaarheidsstudie en bijlage 1 bij de haalbaarheidsstudie. Het materiële toepassingsgebied van het project en de geselecteerde technologische oplossingen omvatten: bouw van nieuwe kabelverbindingen van bestaande SN-lijnen en één nieuwe kabeluitgang van GPZ, reconstructie van uitgangen en naderingen van SN-kabellijnen van GPZ, vervanging van oude niet-geïsoleerde bovenleidingen op het gedeelte van de bestaande 15 kV middenspanningslijn in nieuwe, niet-geïsoleerde lijnen. De voorgestelde investeringstaken zullen de mogelijkheid vergroten om nieuwe elektriciteitsproductie-eenheden uit hernieuwbare energiebronnen en micro-installaties op het net aan te sluiten, zodat de veiligheid van de exploitatie van de OSD-elektriciteitsnetwerken wordt gewaarborgd. De lengte van het nieuw aangelegde netwerk 21,205 km. De lengte van het gemoderniseerde netwerk 2,475 km. (Dutch)
    17 December 2021
    0 references
    L'ambito del progetto comprende la costruzione e la ricostruzione di linee elettriche a media tensione (SN) situate nell'area operativa di Olsztyn ENERGA-OPERATOR SA Branch. Il progetto copre 9 progetti di investimento previsti per l'attuazione nel 2018 e nel 2019 nel Voivodato di Warmińsko-Mazurskie, nei comuni: Małdyty, Morąg, città di Nidzica, Bishtinek, Reszel, Piecki, Natale, Ostróda, Gietrzwałd, Iława e Iława City. La portata dettagliata, vale a dire l'ubicazione precisa del progetto (comuni, località, indirizzi e numero di parcella), la portata materiale dei singoli compiti (elementi tecnici, tipo di infrastruttura, quantità), una descrizione della soluzione scelta e le condizioni tecniche di attuazione, nonché la determinazione se gli elementi infrastrutturali siano nuovi, modernizzati, adattati o meno oggetto di modernizzazione, cfr. il capitolo 2.2 dello studio di fattibilità e l'allegato 1 dello studio di fattibilità. L'ambito materiale del progetto e le soluzioni tecnologiche selezionate comprendono: costruzione di nuovi collegamenti via cavo di linee SN esistenti e di un nuovo cavo di uscita da GPZ, ricostruzione delle uscite e degli approcci delle linee di cavi SN da GPZ, sostituzione di vecchie linee elettriche aeree non isolate sulla sezione della linea di media tensione da 15 kV esistente in nuove linee non isolate. I compiti di investimento proposti aumenteranno la possibilità di collegare alla rete nuove unità di produzione di energia elettrica da fonti rinnovabili e microimpianti in modo da garantire la sicurezza del funzionamento delle reti elettriche OSD. La lunghezza della rete di nuova costruzione 21,205 km. La lunghezza della rete modernizzata 2,475 km. (Italian)
    15 January 2022
    0 references

    Identifiers

    RPWM.04.01.00-28-0001/18
    0 references