Installation of RES for the needs of the hotel-gastronomical facility Folwark Żuławski company PRZEMYSŁAW PASTEWSKI (Q131810): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in nl, and other parts: Adding Dutch translations)
(‎Changed label, description and/or aliases in it, and other parts: Adding Italian translations)
label / itlabel / it
 
Installazione di RES per le esigenze dell'hotel e della ristorazione Folwark Żuławski by PRZEMYSŁAW Pastewski
Property / summary
 
Il progetto prevede di costruire due istanze FER, vale a dire un impianto fotovoltaico in rete di 39,75 kWp che utilizza energia solare e impianti che utilizzano pompe di calore verticali che utilizzano l'energia geotermica da 72 kW. Gli impianti previsti saranno utilizzati per la produzione di energia eclettica e termica, che sarà utilizzata per le esigenze dell'attività di ristorazione e alberghiera PRZEMYSŁAW Pastewski del richiedente nell'impianto Folwark Żuławski. L'ambito dell'investimento comprenderà: 1. Acquisto e installazione di un impianto fotovoltaico da 39,75 kW composto da 150 moduli fotovoltaici, inverter di rete e protezione AC/DC. L'efficienza del sistema è stimata a circa. 85 %. Il sistema permetterà di ottenere ca. 42,57 MWh di elettricità pura, 2. Acquisto e installazione di due pompe di calore con una potenza totale di 72k nel tempo con serbatoi di stoccaggio, lavori di terra relativi a scavi di 18 fori in cui saranno collocate sonde in acque profonde. Il sistema permetterà di ottenere ca. 180,66 MWht di pura energia termica. L'intero investimento sarà situato sul terreno n. 82/5 ob. 0029, nel villaggio di Władysławowo 4a Elbląg. L'attuazione dell'investimento avrà effetti positivi sull'ambiente, anche in termini di riduzione delle emissioni di CO2, stimata a 126,80 all'anno. Il progetto si inserisce nell'allegato. 4 assi di priorità. Dipartimento ROP WiM. 4.1 è in linea con l'obiettivo specifico di "aumento della quota di fonti energetiche rinnovabili nel bilancio energetico globale della regione". Il richiedente dispone di un'adeguata capacità finanziaria e istituzionale, comprese le risorse umane e organizzative, per attuare il progetto. L'analisi formale e giuridica ha confermato la piena fattibilità formale e giuridica dell'investimento. Il progetto sarà finanziato dalle risorse proprie dell'impresa (15 %) e dalle sovvenzioni dell'UE (85 %). In assenza di una sovvenzione, il progetto non sarà attuato a causa dei notevoli costi di investimento. (Italian)
Property / summary: Il progetto prevede di costruire due istanze FER, vale a dire un impianto fotovoltaico in rete di 39,75 kWp che utilizza energia solare e impianti che utilizzano pompe di calore verticali che utilizzano l'energia geotermica da 72 kW. Gli impianti previsti saranno utilizzati per la produzione di energia eclettica e termica, che sarà utilizzata per le esigenze dell'attività di ristorazione e alberghiera PRZEMYSŁAW Pastewski del richiedente nell'impianto Folwark Żuławski. L'ambito dell'investimento comprenderà: 1. Acquisto e installazione di un impianto fotovoltaico da 39,75 kW composto da 150 moduli fotovoltaici, inverter di rete e protezione AC/DC. L'efficienza del sistema è stimata a circa. 85 %. Il sistema permetterà di ottenere ca. 42,57 MWh di elettricità pura, 2. Acquisto e installazione di due pompe di calore con una potenza totale di 72k nel tempo con serbatoi di stoccaggio, lavori di terra relativi a scavi di 18 fori in cui saranno collocate sonde in acque profonde. Il sistema permetterà di ottenere ca. 180,66 MWht di pura energia termica. L'intero investimento sarà situato sul terreno n. 82/5 ob. 0029, nel villaggio di Władysławowo 4a Elbląg. L'attuazione dell'investimento avrà effetti positivi sull'ambiente, anche in termini di riduzione delle emissioni di CO2, stimata a 126,80 all'anno. Il progetto si inserisce nell'allegato. 4 assi di priorità. Dipartimento ROP WiM. 4.1 è in linea con l'obiettivo specifico di "aumento della quota di fonti energetiche rinnovabili nel bilancio energetico globale della regione". Il richiedente dispone di un'adeguata capacità finanziaria e istituzionale, comprese le risorse umane e organizzative, per attuare il progetto. L'analisi formale e giuridica ha confermato la piena fattibilità formale e giuridica dell'investimento. Il progetto sarà finanziato dalle risorse proprie dell'impresa (15 %) e dalle sovvenzioni dell'UE (85 %). In assenza di una sovvenzione, il progetto non sarà attuato a causa dei notevoli costi di investimento. (Italian) / rank
 
Normal rank
Property / summary: Il progetto prevede di costruire due istanze FER, vale a dire un impianto fotovoltaico in rete di 39,75 kWp che utilizza energia solare e impianti che utilizzano pompe di calore verticali che utilizzano l'energia geotermica da 72 kW. Gli impianti previsti saranno utilizzati per la produzione di energia eclettica e termica, che sarà utilizzata per le esigenze dell'attività di ristorazione e alberghiera PRZEMYSŁAW Pastewski del richiedente nell'impianto Folwark Żuławski. L'ambito dell'investimento comprenderà: 1. Acquisto e installazione di un impianto fotovoltaico da 39,75 kW composto da 150 moduli fotovoltaici, inverter di rete e protezione AC/DC. L'efficienza del sistema è stimata a circa. 85 %. Il sistema permetterà di ottenere ca. 42,57 MWh di elettricità pura, 2. Acquisto e installazione di due pompe di calore con una potenza totale di 72k nel tempo con serbatoi di stoccaggio, lavori di terra relativi a scavi di 18 fori in cui saranno collocate sonde in acque profonde. Il sistema permetterà di ottenere ca. 180,66 MWht di pura energia termica. L'intero investimento sarà situato sul terreno n. 82/5 ob. 0029, nel villaggio di Władysławowo 4a Elbląg. L'attuazione dell'investimento avrà effetti positivi sull'ambiente, anche in termini di riduzione delle emissioni di CO2, stimata a 126,80 all'anno. Il progetto si inserisce nell'allegato. 4 assi di priorità. Dipartimento ROP WiM. 4.1 è in linea con l'obiettivo specifico di "aumento della quota di fonti energetiche rinnovabili nel bilancio energetico globale della regione". Il richiedente dispone di un'adeguata capacità finanziaria e istituzionale, comprese le risorse umane e organizzative, per attuare il progetto. L'analisi formale e giuridica ha confermato la piena fattibilità formale e giuridica dell'investimento. Il progetto sarà finanziato dalle risorse proprie dell'impresa (15 %) e dalle sovvenzioni dell'UE (85 %). In assenza di una sovvenzione, il progetto non sarà attuato a causa dei notevoli costi di investimento. (Italian) / qualifier
 
point in time: 15 January 2022
Timestamp+2022-01-15T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 14:55, 15 January 2022

Project Q131810 in Poland
Language Label Description Also known as
English
Installation of RES for the needs of the hotel-gastronomical facility Folwark Żuławski company PRZEMYSŁAW PASTEWSKI
Project Q131810 in Poland

    Statements

    0 references
    437,838.76 zloty
    0 references
    105,081.30 Euro
    13 January 2020
    0 references
    515,104.42 zloty
    0 references
    123,625.06 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    5 April 2017
    0 references
    31 December 2019
    0 references
    PRZEMYSŁAW PASTEWSKI
    0 references
    0 references

    54°9'30.2"N, 19°18'31.7"E
    0 references
    W ramach przedsięwzięcia planuje się budowę dwóch instancji OZE tj instalacji fotowoltaicznej on-grid o mocy 39,75kWp wykorzystującą energię ze słońca oraz instalacji z zastosowaniem pionowych pomp ciepła wykorzystującą energię geotermalną o mocy 72kW. Projektowane instalacje będą służyły do produkcji energii eklektycznej i cieplnej , która będzie wykorzystywana na potrzeby prowadzonej przez Wnioskodawcę PRZEMYSŁAW PASTEWSKI działalności gastronomiczno-hotelowej w obiekcie Folwark Żuławski. Zakres inwestycji będzie obejmował: 1. Zakup i montaż instalacji fotowoltaicznej o mocy 39,75kW w której skład będzie wchodziło 150 szt. modułów PV, inwerter sieciowy oraz zabezpieczenie AC/DC. Sprawność układu szacuje się na ok. 85 %. System pozwoli na pozyskanie rocznie ok. 42,57 MWh czystej energii elektrycznej, 2. Zakup i montaż dwóch pomp ciepła o łącznej mocy 72k w raz z zasobnikami, prace ziemne związane z wykopami 18 otworów, w których zostaną umieszczone sondy głębinowe. System pozwoli na pozyskanie rocznie ok. 180,66 MWht czystej energii cieplnej. Cała inwestycja będzie zlokalizowana na działce nr 82/5 ob. 0029, w miejscowości Władysławowo 4a gm. Elbląg. Realizacja inwestycji przyniesie pozytywne efekty środowiskowe, w tym w zakresie redukcji emisji CO2, która szacowana jest na poziomie 126,80/rok. Projekt wpisuje się w zał. 4 osi priorytet. RPO WiM dział. 4.1, jest zgodny z celem szczegółowym "zwiększony udział odnawialnych źródeł energii w ogólnym bilansie energetycznym regionu". Wnioskodawca posiada odpowiedni potencjał finansowy i instytucjonalny, w tym zasoby kadrowe i organizacyjne, do realizacji projektu. Analiza formalno-prawna potwierdziła pełną formalno-prawną wykonalność inwestycji. Przedsięwzięcie będzie finansowane ze środków własnych przedsiębiorstwa (15%) oraz dotacji ze środków unijnych (85%). Z uwagi na znaczące nakłady inwestycyjne,w przypadku nie uzyskania dotacji, przedsięwzięcie nie zostanie zrealizowane. (Polish)
    0 references
    The project plans to build two RES instances, i.e. on-grid photovoltaic installation with a power of 39.75kWp using solar energy and installations using vertical heat pumps using geothermal energy of 72 kW. The planned installations will be used for the production of eclectic and thermal energy, which will be used for the purposes of catering and hotel activities carried out by the Applicant PASTEWSKI in the Folwark Żuławski building. The scope of the investment will include: 1. Purchase and installation of a 39.75 kW photovoltaic installation consisting of 150 PV modules, a network inverter and AC/DC security. The efficiency of the system is estimated to be approx. IT’S 85 %. The system will allow to obtain approx. 42.57 MWh of clean electricity, 2. Purchase and assembly of two heat pumps with a total capacity of 72k at once with storage tanks, earthworks related to excavations of 18 holes in which deep-sea probes will be placed. The system will allow to obtain approx. 180,66 MWht of clean thermal energy. The entire investment will be located on plot no. 82/5. 0029, in the village of Władysławowo 4a gm. Elbląg. The implementation of the investment will have positive environmental effects, including in terms of CO2 reductions, which is estimated at 126.80/year. The project fits in. 4 axes priority. RPO WiM department. 4.1 is in line with the specific objective “increased share of renewable energy sources in the overall energy balance of the region”. The applicant shall have adequate financial and institutional capacity, including staff and organisational resources, to carry out the project. The formal and legal analysis confirmed the full formal and legal feasibility of the investment. The project will be financed from the company’s own resources (15 %) and grants from EU funds (85 %). Due to significant investment outlays, in the absence of a grant, the project will not be carried out. (English)
    21 October 2020
    0 references
    Le projet prévoit de construire deux instances SER, à savoir une installation photovoltaïque sur réseau de 39,75 kWp utilisant l’énergie solaire et des installations utilisant des pompes à chaleur verticales utilisant l’énergie géothermique de 72 kW. Les installations prévues seront utilisées pour la production d’énergie éclectique et thermique, qui seront utilisées pour répondre aux besoins de l’activité de restauration et d’hôtellerie PRZEMYSŁAW Pastewski de la requérante dans l’installation de Folwark ▲uławski. La portée de l’investissement comprendra: 1. Achat et installation d’une installation photovoltaïque de 39,75 kW composée de 150 modules PV, onduleur réseau et protection AC/DC. L’efficacité du système est estimée à environ. 85 %. Le système permettra d’obtenir environ. 42,57 MWh d’électricité pure, 2. Achat et installation de deux pompes à chaleur d’une puissance totale de 72k dans le temps avec des réservoirs de stockage, travaux de terre liés à l’excavation de 18 trous dans lesquels des sondes en eau profonde seront placées. Le système permettra d’obtenir environ. 180,66 MWht d’énergie thermique pure. L’ensemble de l’investissement sera situé sur la parcelle no 82/5 ob. 0029, dans le village de Władysławowo 4a Elbląg. La mise en œuvre de l’investissement aura des effets positifs sur l’environnement, notamment en termes de réduction des émissions de CO2, qui est estimée à 126,80 par an. Le projet s’inscrit dans l’annexe. 4 axes prioritaires. Service ROP WiM. 4.1 est conforme à l’objectif spécifique consistant à «accroître la part des sources d’énergie renouvelables dans le bilan énergétique global de la région». Le demandeur dispose des capacités financières et institutionnelles adéquates, y compris des ressources humaines et organisationnelles, pour mettre en œuvre le projet. L’analyse formelle et juridique a confirmé la faisabilité formelle et juridique de l’investissement. Le projet sera financé sur les ressources propres de l’entreprise (15 %) et sur les subventions de l’UE (85 %). En l’absence de subvention, le projet ne sera pas mis en œuvre en raison de coûts d’investissement importants. (French)
    2 December 2021
    0 references
    Das Projekt plant den Bau von zwei RES-Instanzen, d. h. einer netzgestützten Photovoltaikanlage von 39,75kWp mit Solarenergie und Anlagen mit vertikalen Wärmepumpen mit 72 kW Geothermie. Die geplanten Anlagen werden für die Produktion von eklektischer und thermischer Energie genutzt, die für die Bedürfnisse der PRZEMYSŁAW Pastewski Gastronomie und Hotelaktivitäten im Werk Folwark Żuławski verwendet werden. Der Umfang der Investition umfasst: 1. Kauf und Einbau einer 39,75 kW Photovoltaikanlage bestehend aus 150 PV-Modulen, Netzwerk-Wechselrichter und AC/DC-Schutz. Die Effizienz des Systems wird auf ca. 85 %. Das System ermöglicht es, ca. 42,57 MWh aus reinem Strom, 2. Kauf und Installation von zwei Wärmepumpen mit einer Gesamtleistung von 72k in der Zeit mit Speichertanks, Erdarbeiten im Zusammenhang mit Ausgrabungen von 18 Löchern, in denen Tiefseesonden platziert werden. Das System ermöglicht es, ca. 180,66 MWht reine thermische Energie. Die gesamte Investition wird auf dem Grundstück Nr. 82/5 ob liegen. 0029, im Dorf Władysławowo 4a Elbląg. Die Durchführung der Investition wird positive Auswirkungen auf die Umwelt haben, auch im Hinblick auf die Verringerung der CO2-Emissionen, die auf 126,80/Jahr geschätzt wird. Das Projekt passt in den Anhang. 4 Achsen Priorität. ROP WiM Abteilung. 4.1 steht im Einklang mit dem Einzelziel „Erhöhung des Anteils erneuerbarer Energiequellen an der Gesamtenergiebilanz der Region“. Der Antragsteller muss über angemessene finanzielle und institutionelle Kapazitäten, einschließlich personeller und organisatorischer Ressourcen, zur Durchführung des Projekts verfügen. Die formale und rechtliche Analyse bestätigte die formelle und rechtliche Machbarkeit der Investition. Das Projekt wird aus eigenen Mitteln (15 %) und EU-Beihilfen (85 %) finanziert. In Ermangelung eines Zuschusses wird das Projekt aufgrund erheblicher Investitionskosten nicht durchgeführt. (German)
    9 December 2021
    0 references
    Het project is van plan twee RES-gevallen te bouwen, d.w.z. een fotovoltaïsche installatie op het net van 39,75kWp met zonne-energie en installaties die gebruikmaken van verticale warmtepompen die 72 kW geothermische energie gebruiken. De geplande installaties zullen worden gebruikt voor de productie van eclectische en thermische energie, die zal worden gebruikt voor de behoeften van de PRZEMYSŁAW Pastewski catering en hotelactiviteiten in de faciliteit Folwark Șuławski. Het toepassingsgebied van de investering omvat: 1. Aankoop en installatie van een 39,75 kW fotovoltaïsche installatie bestaande uit 150 PV modules, netwerkomvormer en AC/DC bescherming. De efficiëntie van het systeem wordt geschat op ca. 85 %. Het systeem zal het mogelijk maken om ca. 42,57 MWh zuivere elektriciteit, 2. Aankoop en installatie van twee warmtepompen met een totaal vermogen van 72k in tijd met opslagtanks, grondwerken in verband met opgravingen van 18 gaten waarin diepzeesondes zullen worden geplaatst. Het systeem zal het mogelijk maken om ca. 180,66 MWht zuivere thermische energie. De gehele investering zal worden gelokaliseerd op perceel nr. 82/5 ob. 0029, in het dorp Władysławowo 4a Elbląg. De uitvoering van de investering zal positieve milieueffecten hebben, onder meer wat betreft de vermindering van de CO2-uitstoot, die op 126,80/jaar wordt geraamd. Het project past in de bijlage. 4 assen prioriteit. ROP WiM afdeling. 4.1 is in overeenstemming met de specifieke doelstelling „een groter aandeel hernieuwbare energiebronnen in de totale energiebalans van de regio”. De aanvrager beschikt over voldoende financiële en institutionele capaciteit, met inbegrip van personele en organisatorische middelen, om het project uit te voeren. De formele en juridische analyse bevestigde de volledige formele en juridische haalbaarheid van de investering. Het project zal worden gefinancierd uit de eigen middelen van de onderneming (15 %) en EU-subsidies (85 %). Als er geen subsidie is, zal het project niet worden uitgevoerd vanwege aanzienlijke investeringskosten. (Dutch)
    17 December 2021
    0 references
    Il progetto prevede di costruire due istanze FER, vale a dire un impianto fotovoltaico in rete di 39,75 kWp che utilizza energia solare e impianti che utilizzano pompe di calore verticali che utilizzano l'energia geotermica da 72 kW. Gli impianti previsti saranno utilizzati per la produzione di energia eclettica e termica, che sarà utilizzata per le esigenze dell'attività di ristorazione e alberghiera PRZEMYSŁAW Pastewski del richiedente nell'impianto Folwark Żuławski. L'ambito dell'investimento comprenderà: 1. Acquisto e installazione di un impianto fotovoltaico da 39,75 kW composto da 150 moduli fotovoltaici, inverter di rete e protezione AC/DC. L'efficienza del sistema è stimata a circa. 85 %. Il sistema permetterà di ottenere ca. 42,57 MWh di elettricità pura, 2. Acquisto e installazione di due pompe di calore con una potenza totale di 72k nel tempo con serbatoi di stoccaggio, lavori di terra relativi a scavi di 18 fori in cui saranno collocate sonde in acque profonde. Il sistema permetterà di ottenere ca. 180,66 MWht di pura energia termica. L'intero investimento sarà situato sul terreno n. 82/5 ob. 0029, nel villaggio di Władysławowo 4a Elbląg. L'attuazione dell'investimento avrà effetti positivi sull'ambiente, anche in termini di riduzione delle emissioni di CO2, stimata a 126,80 all'anno. Il progetto si inserisce nell'allegato. 4 assi di priorità. Dipartimento ROP WiM. 4.1 è in linea con l'obiettivo specifico di "aumento della quota di fonti energetiche rinnovabili nel bilancio energetico globale della regione". Il richiedente dispone di un'adeguata capacità finanziaria e istituzionale, comprese le risorse umane e organizzative, per attuare il progetto. L'analisi formale e giuridica ha confermato la piena fattibilità formale e giuridica dell'investimento. Il progetto sarà finanziato dalle risorse proprie dell'impresa (15 %) e dalle sovvenzioni dell'UE (85 %). In assenza di una sovvenzione, il progetto non sarà attuato a causa dei notevoli costi di investimento. (Italian)
    15 January 2022
    0 references

    Identifiers

    RPWM.04.01.00-28-0171/17
    0 references