Energy modernisation of public utility buildings of the Municipality of Kozenna (Q112267): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in nl, and other parts: Adding Dutch translations)
(‎Changed label, description and/or aliases in it, and other parts: Adding Italian translations)
label / itlabel / it
 
Ammodernamento energetico degli edifici pubblici del comune di Korzenna
Property / summary
 
Il progetto prevede l'esecuzione di 3 compiti: Preparazione del progetto, ammodernamento energetico degli edifici pubblici e promozione. La portata materiale del progetto, in particolare il regolamento n. 2, si basa sugli audit energet sviluppati. In SP Jasienna include: installazione moderna, rimozione di porte esterne, ammodernamento di impianti di acqua calda, sostituzione di finestre, riscaldamento del soffitto in soffitta, isolamento delle pareti esterne, ecc., ristrutturazione di scale esterne e camini, installazione di nuove grondaie e tubi di scarico. Nella SP Miłkowa: ammodernamento degli impianti di riscaldamento centrale, rimozione di porte esterne, installazione di ventilatori, riscaldamento del soffitto in soffitta, ammodernamento di impianti di acqua calda, riscaldamento di pareti esterne, ecc., ristrutturazione di scale e camini esterni, installazione di nuove grondaie e tubi di scarico. Nel Bukowiec OW: ammodernamento degli impianti di riscaldamento centrale, rimozione di finestre e porte esterne, installazione di ventilatori, installazione di acqua calda moderna, riscaldamento del soffitto in soffitta insieme alla sua rimovibile, riscaldamento delle pareti esterne, compresa la fondazione, ecc., riparazione di scale esterne e camini, installazione di nuove grondaie e tubi di scarico. Il progetto si tradurrà in: 1. Migliorare l'efficienza energetica del 64 %. 2. Applicazione di contatori di calore individuali e acqua calda 3. Installazione di termostati e valvole verticali (secondo audit energetico). fXLISD0XlSclcQUFJrlPV5KRB56u2B0U4zOn5J 11 4.Riduzione delle emissioni di CO2 del 77 %. 5.Ridurre le emissioni di polveri (PM 10 e PM 2,5) del 94 %. Indicatori di realizzazione: Numero di edifici modificati a energia-3 pz. Numero di unità di generazione di calore da fonti rinnovabili costruite — 3 pz. Capacità supplementare di generazione di calore rinnovabile — 0,006 MWt Indicatori di risultato: Riduzione del consumo finale di energia da progetti — 2 188 GJ/anno Riduzione del consumo annuo di energia primaria negli edifici pubblici — 728 476 kWh/anno Numero di energia termica risparmiata — 2 192 GJ/anno Diminuzione annua stimata dei gas a effetto serra — 179,9 t CO2/anno Produzione di energia termica da impianti di nuova costruzione (Italian)
Property / summary: Il progetto prevede l'esecuzione di 3 compiti: Preparazione del progetto, ammodernamento energetico degli edifici pubblici e promozione. La portata materiale del progetto, in particolare il regolamento n. 2, si basa sugli audit energet sviluppati. In SP Jasienna include: installazione moderna, rimozione di porte esterne, ammodernamento di impianti di acqua calda, sostituzione di finestre, riscaldamento del soffitto in soffitta, isolamento delle pareti esterne, ecc., ristrutturazione di scale esterne e camini, installazione di nuove grondaie e tubi di scarico. Nella SP Miłkowa: ammodernamento degli impianti di riscaldamento centrale, rimozione di porte esterne, installazione di ventilatori, riscaldamento del soffitto in soffitta, ammodernamento di impianti di acqua calda, riscaldamento di pareti esterne, ecc., ristrutturazione di scale e camini esterni, installazione di nuove grondaie e tubi di scarico. Nel Bukowiec OW: ammodernamento degli impianti di riscaldamento centrale, rimozione di finestre e porte esterne, installazione di ventilatori, installazione di acqua calda moderna, riscaldamento del soffitto in soffitta insieme alla sua rimovibile, riscaldamento delle pareti esterne, compresa la fondazione, ecc., riparazione di scale esterne e camini, installazione di nuove grondaie e tubi di scarico. Il progetto si tradurrà in: 1. Migliorare l'efficienza energetica del 64 %. 2. Applicazione di contatori di calore individuali e acqua calda 3. Installazione di termostati e valvole verticali (secondo audit energetico). fXLISD0XlSclcQUFJrlPV5KRB56u2B0U4zOn5J 11 4.Riduzione delle emissioni di CO2 del 77 %. 5.Ridurre le emissioni di polveri (PM 10 e PM 2,5) del 94 %. Indicatori di realizzazione: Numero di edifici modificati a energia-3 pz. Numero di unità di generazione di calore da fonti rinnovabili costruite — 3 pz. Capacità supplementare di generazione di calore rinnovabile — 0,006 MWt Indicatori di risultato: Riduzione del consumo finale di energia da progetti — 2 188 GJ/anno Riduzione del consumo annuo di energia primaria negli edifici pubblici — 728 476 kWh/anno Numero di energia termica risparmiata — 2 192 GJ/anno Diminuzione annua stimata dei gas a effetto serra — 179,9 t CO2/anno Produzione di energia termica da impianti di nuova costruzione (Italian) / rank
 
Normal rank
Property / summary: Il progetto prevede l'esecuzione di 3 compiti: Preparazione del progetto, ammodernamento energetico degli edifici pubblici e promozione. La portata materiale del progetto, in particolare il regolamento n. 2, si basa sugli audit energet sviluppati. In SP Jasienna include: installazione moderna, rimozione di porte esterne, ammodernamento di impianti di acqua calda, sostituzione di finestre, riscaldamento del soffitto in soffitta, isolamento delle pareti esterne, ecc., ristrutturazione di scale esterne e camini, installazione di nuove grondaie e tubi di scarico. Nella SP Miłkowa: ammodernamento degli impianti di riscaldamento centrale, rimozione di porte esterne, installazione di ventilatori, riscaldamento del soffitto in soffitta, ammodernamento di impianti di acqua calda, riscaldamento di pareti esterne, ecc., ristrutturazione di scale e camini esterni, installazione di nuove grondaie e tubi di scarico. Nel Bukowiec OW: ammodernamento degli impianti di riscaldamento centrale, rimozione di finestre e porte esterne, installazione di ventilatori, installazione di acqua calda moderna, riscaldamento del soffitto in soffitta insieme alla sua rimovibile, riscaldamento delle pareti esterne, compresa la fondazione, ecc., riparazione di scale esterne e camini, installazione di nuove grondaie e tubi di scarico. Il progetto si tradurrà in: 1. Migliorare l'efficienza energetica del 64 %. 2. Applicazione di contatori di calore individuali e acqua calda 3. Installazione di termostati e valvole verticali (secondo audit energetico). fXLISD0XlSclcQUFJrlPV5KRB56u2B0U4zOn5J 11 4.Riduzione delle emissioni di CO2 del 77 %. 5.Ridurre le emissioni di polveri (PM 10 e PM 2,5) del 94 %. Indicatori di realizzazione: Numero di edifici modificati a energia-3 pz. Numero di unità di generazione di calore da fonti rinnovabili costruite — 3 pz. Capacità supplementare di generazione di calore rinnovabile — 0,006 MWt Indicatori di risultato: Riduzione del consumo finale di energia da progetti — 2 188 GJ/anno Riduzione del consumo annuo di energia primaria negli edifici pubblici — 728 476 kWh/anno Numero di energia termica risparmiata — 2 192 GJ/anno Diminuzione annua stimata dei gas a effetto serra — 179,9 t CO2/anno Produzione di energia termica da impianti di nuova costruzione (Italian) / qualifier
 
point in time: 15 January 2022
Timestamp+2022-01-15T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 10:42, 15 January 2022

Project Q112267 in Poland
Language Label Description Also known as
English
Energy modernisation of public utility buildings of the Municipality of Kozenna
Project Q112267 in Poland

    Statements

    0 references
    949,074.98 zloty
    0 references
    227,778.00 Euro
    13 January 2020
    0 references
    1,581,791.64 zloty
    0 references
    379,629.99 Euro
    13 January 2020
    0 references
    60.0 percent
    0 references
    30 December 2015
    0 references
    31 March 2019
    0 references
    GMINA KORZENNA
    0 references
    W projekcie przewidziano wykonanie 3 zadań: Przygotowanie projektu, Modernizacja energetyczna budynków użyteczności publicznej oraz Promocja. Zakres rzeczowy projektu, w szczegól. zad. nr 2 wynika z opracowanych audytów energet. W SP Jasienna obejmuje: modern. instalacji c.o., wyminę drzwi zewn., modernizację instalacji c.w.u., wymianę okien, ocieplenie stropu na poddaszu, ociepl. ścian zewnętrznych, wyk. inst. odgr., remont schodów zewn. i kominów, montaż nowych rynien i rur spust. W SP Miłkowa: modernizację instalacji c.o., wyminę drzwi zewn., montaż nawiewników, ocieplenie stropu na poddaszu, modernizację instalacji c.w.u., ocieplenie ścian zewnętrznych, wyk inst. odgr., remont schodów zewn. i kominów, montaż nowych rynien i rur spustowych. W OW Bukowiec: modernizację instalacji c.o., wyminę okien i drzwi zewn., montaż nawiewników, modern. instalacji c.w.u., ocieplenie stropu na poddaszu wraz z jego wyminą, ocieplenie ścian zewn., w tym fundament., wyk inst. odgr., remont schodów zewn. i kominów, montaż nowych rynien i rur spust. W wyniku realizacji projektu wystąpi: 1.Poprawa efektywności energetycznej o 64%. 2.Zastosowanie indywidualnych liczników ciepła i c.w.u. 3.Montaż termostatów i zaworów podpionowych (wg audytu energetycznego). fXLISD0XlSclcQUFJtjrlPV5KRB56u2B0U4zOn5J 11 4.Redukcja emisji CO2 o 77%. 5.Obniżenie emisji pyłów (PM 10 i PM 2,5) o 94%. Wskaźniki produktu: Liczba zmodernizowanych energetycznie budynków-3szt. Liczba wybudowanych jednostek wytwarzania energii cieplnej z OZE – 3 szt. Dodatkowa zdolność wytwarzania energii cieplnej ze źródeł odnawialnych - 0,006 MWt Wskaźniki rezultatu: Zmniejszenie zużycia energii końcowej w wyniku realizacji projektów – 2 188 GJ/rok Zmniejszenie rocznego zużycia energii pierwotnej w budynkach publicznych – 728 476 kWh/rok Ilość zaoszczędzonej energii cieplnej - 2 192 GJ/rok Szacowany roczny spadek gazów cieplarnianych – 179,9 t CO2/rok Produkcja energii cieplnej z nowo wybudowanych instalacj (Polish)
    0 references
    The project provides for 3 tasks: Project preparation, Energy modernisation of public buildings and Promotion. The material scope of the project, in particular, as far as no. 2 results from the developed energet audits. The Jasienna SP shall include: modern. central heating system, exit door, modernisation of central heating system, replacement of windows, warming of ceilings in the attic, warming of external walls, repair of external stairs and chimneys, installation of new gutters and pipes. In SP Miłków: modernisation of the central heating system, exit door, installation of vents, warming of ceilings in the attic, modernisation of central heating installations, warming of external walls, extremity, renovation of external stairs and chimneys, installation of new gutters and drain pipes. In OW Bukowiec: modernisation of the central heating system, extinguishing windows and external doors, installation of vents, modern central heating system, warming of the ceiling in the attic along with its evisceration, warming of the outer walls, including foundation, forged stairs and chimneys, installation of new gutters and pipes. As a result of the project, there will be: 1.Improving energy efficiency by 64 %. 2.Application of individual heat meters and hot temperature 3.Assembly of thermostats and sub-pipe valves (according to energy audit). fXLISD0XlSclcQUFJtjrlPV5KRB56u2B0U4zOn5J 11 4. 5.Decrease in dust emissions (PM 10 and PM 2.5) by 94 %. Output indicators: Number of energy-renovated buildings – 3 pieces. Number of built units of heat generation from RES – 3 pcs. Additional capacity to generate heat from renewable sources – 0,006 MWt Results indicators: Reduction of final energy consumption as a result of projects – 2 188 GJ/year Reduction of annual primary energy consumption in public buildings – 728476 kWh/year Number of thermal energy saved – 2 192 GJ/year Estimated annual decrease in greenhouse gases – 179,9 t CO2/year Production of heat from newly built installations (English)
    20 October 2020
    0 references
    Le projet prévoit l’exécution de trois tâches: Préparation du projet, Modernisation énergétique des bâtiments publics et Promotion. Le champ d’application matériel du projet, en particulier le règlement no 2, est fondé sur les audits énerget développés. Dans SP Jasienna comprend: installation moderne, enlèvement des portes extérieures, modernisation des installations d’eau chaude, remplacement des fenêtres, réchauffement du plafond dans le grenier, isolation des murs extérieurs, etc., rénovation des escaliers extérieurs et des cheminées, installation de nouvelles gouttières et tuyaux d’évacuation. Dans le SP Miłkowa: modernisation des installations de chauffage central, enlèvement des portes extérieures, installation de ventilateurs, réchauffement du plafond dans le grenier, modernisation des installations d’eau chaude, réchauffement des murs extérieurs, etc., rénovation des escaliers extérieurs et des cheminées, installation de nouvelles gouttières et tuyaux d’évacuation. Dans le Bukowiec OW: modernisation des installations de chauffage central, enlèvement des fenêtres et des portes extérieures, installation de ventilateurs, installation d’eau chaude moderne, chauffage du plafond dans le grenier avec son amovible, chauffage des murs extérieurs, y compris les fondations, etc., réparation des escaliers extérieurs et des cheminées, installation de nouvelles gouttières et tuyaux d’évacuation. Le projet se traduira par: 1.Améliorer l’efficacité énergétique de 64 %. 2.Application de compteurs de chaleur individuels et d’eau chaude 3. Installation de thermostats et de vannes verticales (selon l’audit énergétique). fXLISD0XlSclcQUFJrlPV5KRB56u2B0U4zOn5J 11 4.Réduction des émissions de CO2 de 77 %. 5.Réduire les émissions de poussières (PM 10 et PM 2,5) de 94 %. Indicateurs de réalisation: Nombre de bâtiments modifiés par l’énergie-3 pièces. Nombre d’unités de production de chaleur SER construites — 3 pièces. Capacité supplémentaire de production de chaleur renouvelable — 0,006 MWt Indicateurs de résultat: Réduction de la consommation finale d’énergie des projets — 2 188 GJ/an Réduction de la consommation annuelle d’énergie primaire dans les bâtiments publics — 728 476 kWh/an Nombre d’économies d’énergie thermique — 2 192 GJ/an Réduction annuelle estimée des gaz à effet de serre — 179,9 t CO2/an Production d’énergie thermique provenant d’installations nouvellement construites (French)
    1 December 2021
    0 references
    Das Projekt sieht die Durchführung von drei Aufgaben vor: Vorbereitung des Projekts, Energiemodernisierung öffentlicher Gebäude und Förderung. Der sachliche Anwendungsbereich des Projekts, insbesondere die Verordnung Nr. 2, beruht auf den entwickelten energet-Prüfungen. In SP Jasienna beinhaltet: moderne Installation, Entfernung von Außentüren, Modernisierung von Warmwasserinstallationen, Austausch von Fenstern, Erwärmung der Decke im Dachboden, Isolierung von Außenwänden usw., Renovierung von Außentreppen und Schornsteinen, Installation neuer Rinnen und Ablaufrohre. In SP Miłkowa: Modernisierung der Zentralheizungsanlagen, Entfernung von Außentüren, Installation von Ventilatoren, Erwärmung der Decke im Dachboden, Modernisierung der Warmwasserinstallationen, Erwärmung der Außenwände usw., Renovierung von Außentreppen und Schornsteinen, Installation neuer Rinnen und Abflussrohre. Im Bukowiec OW: Modernisierung von Zentralheizungsanlagen, Entfernung von Fenstern und Außentüren, Installation von Ventilatoren, moderne Warmwasserinstallation, Erwärmung der Decke im Dachboden zusammen mit seiner abnehmbaren, Erwärmung der Außenwände, einschließlich Fundament usw., Reparatur von Außentreppen und Schornsteinen, Installation neuer Rinnen und Abflussrohre. Das Projekt führt zu folgenden Ergebnissen: 1. Verbesserung der Energieeffizienz um 64 %. 2.Anwendung einzelner Wärmezähler und Warmwasser 3. Installation von Thermostaten und vertikalen Ventilen (nach Energieaudit). fXLISD0XlSclcQUFJrlPV5KRB56u2B0U4zOn5J 11 4.Reduktion der CO2-Emissionen um 77 %. 5.Reduce Staubemissionen (PM 10 und PM 2,5) um 94 %. Outputindikatoren: Anzahl energiemodifizierter Gebäude-3 Stk. Anzahl der gebauten EE-Wärmeerzeugungseinheiten – 3 Stk. Zusätzliche Erneuerbare Wärmeerzeugungskapazität – 0,006 MWt Ergebnisindikatoren: Reduzierung des Endenergieverbrauchs aus Projekten – 2 188 GJ/Jahr Reduzierung des jährlichen Primärenergieverbrauchs in öffentlichen Gebäuden – 728 476 kWh/Jahr Anzahl der eingesparten thermischen Energie – 2 192 GJ/Jahr Geschätzter jährlicher Rückgang der Treibhausgase – 179,9 t CO2/Jahr Wärmeenergieerzeugung aus neu gebauten Anlagen (German)
    7 December 2021
    0 references
    Het project voorziet in de uitvoering van drie taken: Voorbereiding van het project, modernisering van de energie van openbare gebouwen en promotie. De materiële reikwijdte van het project, met name Verordening nr. 2, is gebaseerd op de ontwikkelde energet-audits. In SP Jasienna omvat: moderne installatie, verwijdering van buitendeuren, modernisering van warmwaterinstallaties, vervanging van ramen, opwarming van het plafond op zolder, isolatie van buitenmuren, enz., renovatie van externe trappen en schoorstenen, installatie van nieuwe goten en afvoerleidingen. In SP Miłkowa: modernisering van centrale verwarmingsinstallaties, verwijdering van buitendeuren, installatie van ventilatoren, opwarming van het plafond op zolder, modernisering van warmwaterinstallaties, opwarming van buitenmuren, renovatie van trappen en schoorstenen, installatie van nieuwe goten en afvoerleidingen. In de Bukowiec OW: modernisering van centrale verwarmingsinstallaties, verwijdering van ramen en buitendeuren, installatie van ventilatoren, moderne warmwaterinstallatie, opwarming van het plafond op zolder samen met de afneembare, opwarming van de buitenmuren, inclusief fundering, enz., reparatie van buitentrappen en schoorstenen, installatie van nieuwe goten en afvoerleidingen. Het project zal resulteren in: 1.Improving energie-efficiëntie met 64 %. 2.Application van individuele hittemeters en warm water 3. Installatie van thermostaten en verticale kleppen (volgens energieaudit). fXLISD0XlSclcQUFJrlPV5KRB56u2B0U4zOn5J 11 4.Vermindering van CO2-emissies door 77 %. 5. Verminder de stofemissies (PM 10 en PM 2.5) met 94 %. Outputindicatoren: Aantal energiegemodificeerde gebouwen-3 stuks. Aantal gebouwde RES-warmteopwekkingseenheden — 3 stuks. Aanvullende capaciteit voor de opwekking van hernieuwbare warmte — 0,006 MWt Resultaatindicatoren: Vermindering van het eindenergieverbruik van projecten — 2 188 GJ/jaar Vermindering van het jaarlijkse primaire energieverbruik in openbare gebouwen — 728 476 kWh/jaar Aantal bespaarde thermische energie — 2 192 GJ/jaar Geraamde jaarlijkse afname van broeikasgassen — 179,9 t CO2/jaar Warmteenergieproductie van nieuw gebouwde installaties (Dutch)
    17 December 2021
    0 references
    Il progetto prevede l'esecuzione di 3 compiti: Preparazione del progetto, ammodernamento energetico degli edifici pubblici e promozione. La portata materiale del progetto, in particolare il regolamento n. 2, si basa sugli audit energet sviluppati. In SP Jasienna include: installazione moderna, rimozione di porte esterne, ammodernamento di impianti di acqua calda, sostituzione di finestre, riscaldamento del soffitto in soffitta, isolamento delle pareti esterne, ecc., ristrutturazione di scale esterne e camini, installazione di nuove grondaie e tubi di scarico. Nella SP Miłkowa: ammodernamento degli impianti di riscaldamento centrale, rimozione di porte esterne, installazione di ventilatori, riscaldamento del soffitto in soffitta, ammodernamento di impianti di acqua calda, riscaldamento di pareti esterne, ecc., ristrutturazione di scale e camini esterni, installazione di nuove grondaie e tubi di scarico. Nel Bukowiec OW: ammodernamento degli impianti di riscaldamento centrale, rimozione di finestre e porte esterne, installazione di ventilatori, installazione di acqua calda moderna, riscaldamento del soffitto in soffitta insieme alla sua rimovibile, riscaldamento delle pareti esterne, compresa la fondazione, ecc., riparazione di scale esterne e camini, installazione di nuove grondaie e tubi di scarico. Il progetto si tradurrà in: 1. Migliorare l'efficienza energetica del 64 %. 2. Applicazione di contatori di calore individuali e acqua calda 3. Installazione di termostati e valvole verticali (secondo audit energetico). fXLISD0XlSclcQUFJrlPV5KRB56u2B0U4zOn5J 11 4.Riduzione delle emissioni di CO2 del 77 %. 5.Ridurre le emissioni di polveri (PM 10 e PM 2,5) del 94 %. Indicatori di realizzazione: Numero di edifici modificati a energia-3 pz. Numero di unità di generazione di calore da fonti rinnovabili costruite — 3 pz. Capacità supplementare di generazione di calore rinnovabile — 0,006 MWt Indicatori di risultato: Riduzione del consumo finale di energia da progetti — 2 188 GJ/anno Riduzione del consumo annuo di energia primaria negli edifici pubblici — 728 476 kWh/anno Numero di energia termica risparmiata — 2 192 GJ/anno Diminuzione annua stimata dei gas a effetto serra — 179,9 t CO2/anno Produzione di energia termica da impianti di nuova costruzione (Italian)
    15 January 2022
    0 references

    Identifiers

    RPMP.04.03.02-12-0269/16
    0 references