Thermal modernisation of public buildings and increased use of renewable energy sources in the municipality of Chełmiec (Q112225): Difference between revisions
Jump to navigation
Jump to search
(Changed label, description and/or aliases in nl, and other parts: Adding Dutch translations) |
(Changed label, description and/or aliases in it, and other parts: Adding Italian translations) |
||||||||||||||
label / it | label / it | ||||||||||||||
Termomodernizzazione degli edifici pubblici e aumento dell'uso di fonti energetiche rinnovabili nel comune di Chełmiec | |||||||||||||||
Property / summary | |||||||||||||||
L'investimento consiste in lavori di ammodernamento termico, ammodernamento degli impianti di riscaldamento, applicazione di FER (fotovoltaico, collettori solari, biomassa) in 11 edifici pubblici. La portata ottimale del lavoro è stata determinata sulla base di audit energetici elaborati in conformità con la "Metodologia di...": L'ambito del lavoro di audit e gli altri elementi necessari comprendono i seguenti compiti e attività (descritti in dettaglio al punto C.2.3): 1.Costi preparatori: 1.1 audit energetici; 1.2 Analisi finanziaria ed economica; 1.3 Programma di uso funzionale 2.Termomodernizzazione — Centro comunale di previdenza sociale — isolamento delle partizioni esterne. (pareti, soffitti), installazione del banco 3.Kindergarten ramo in Marcinkowice — isolamento di partizioni esterne. (pareti, soffitto); scambio di fonti di calore, impianto fotovoltaico con metro 4.Scuola di base a Januszowa — isolamento di partizioni esterne. (pareti), sostituzione di finestre, porte, installazione di un contatore di calore 5.Scuola di base a Klęczany — isolamento di divisori esterni (pareti, soffitti), scambio di luxspheres, scambio di fonti di calore — biomassa, contatore di calore, ammodernamento di inst. c.o. 6. Scuola primaria in basso — isolamento di divisori esterni. (pareti, soffitti), scambio di fonti di calore — biomassa, contatore di calore, sostituzione di inst. c.o. 7. Scuola primaria di Rdziostów — isolamento di partizioni esterne. (pareti, soffitto), sostituzione di finestre, porte, sostituzione fonte di calore — biomassa, contatore di calore, ammodernamento di inst. c.o. con regolazione di 8.Schomranice Scuole — isolamento di divisori esterni. (pareti, soffitto), scambio di fonte di calore e acqua calda — gas, calore e contatori di acqua calda, regolazione di inst. c.o. 9.Scuola in Marcinkowice — isolamento di partizioni esterne. (pareti, soffitto), sostituzione porta, cambio inst. c.o. con regolazione, contatori di calore. 10.Scuola a Paszyn — isolamento di pareti esterne (pareti, soffitti), sostituzione delle porte, sostituzione dell'inst. c.o., sostituzione della fonte di calore — gas, contatore di calore Continuando al punto Q della domanda di finanziamento (Italian) | |||||||||||||||
Property / summary: L'investimento consiste in lavori di ammodernamento termico, ammodernamento degli impianti di riscaldamento, applicazione di FER (fotovoltaico, collettori solari, biomassa) in 11 edifici pubblici. La portata ottimale del lavoro è stata determinata sulla base di audit energetici elaborati in conformità con la "Metodologia di...": L'ambito del lavoro di audit e gli altri elementi necessari comprendono i seguenti compiti e attività (descritti in dettaglio al punto C.2.3): 1.Costi preparatori: 1.1 audit energetici; 1.2 Analisi finanziaria ed economica; 1.3 Programma di uso funzionale 2.Termomodernizzazione — Centro comunale di previdenza sociale — isolamento delle partizioni esterne. (pareti, soffitti), installazione del banco 3.Kindergarten ramo in Marcinkowice — isolamento di partizioni esterne. (pareti, soffitto); scambio di fonti di calore, impianto fotovoltaico con metro 4.Scuola di base a Januszowa — isolamento di partizioni esterne. (pareti), sostituzione di finestre, porte, installazione di un contatore di calore 5.Scuola di base a Klęczany — isolamento di divisori esterni (pareti, soffitti), scambio di luxspheres, scambio di fonti di calore — biomassa, contatore di calore, ammodernamento di inst. c.o. 6. Scuola primaria in basso — isolamento di divisori esterni. (pareti, soffitti), scambio di fonti di calore — biomassa, contatore di calore, sostituzione di inst. c.o. 7. Scuola primaria di Rdziostów — isolamento di partizioni esterne. (pareti, soffitto), sostituzione di finestre, porte, sostituzione fonte di calore — biomassa, contatore di calore, ammodernamento di inst. c.o. con regolazione di 8.Schomranice Scuole — isolamento di divisori esterni. (pareti, soffitto), scambio di fonte di calore e acqua calda — gas, calore e contatori di acqua calda, regolazione di inst. c.o. 9.Scuola in Marcinkowice — isolamento di partizioni esterne. (pareti, soffitto), sostituzione porta, cambio inst. c.o. con regolazione, contatori di calore. 10.Scuola a Paszyn — isolamento di pareti esterne (pareti, soffitti), sostituzione delle porte, sostituzione dell'inst. c.o., sostituzione della fonte di calore — gas, contatore di calore Continuando al punto Q della domanda di finanziamento (Italian) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: L'investimento consiste in lavori di ammodernamento termico, ammodernamento degli impianti di riscaldamento, applicazione di FER (fotovoltaico, collettori solari, biomassa) in 11 edifici pubblici. La portata ottimale del lavoro è stata determinata sulla base di audit energetici elaborati in conformità con la "Metodologia di...": L'ambito del lavoro di audit e gli altri elementi necessari comprendono i seguenti compiti e attività (descritti in dettaglio al punto C.2.3): 1.Costi preparatori: 1.1 audit energetici; 1.2 Analisi finanziaria ed economica; 1.3 Programma di uso funzionale 2.Termomodernizzazione — Centro comunale di previdenza sociale — isolamento delle partizioni esterne. (pareti, soffitti), installazione del banco 3.Kindergarten ramo in Marcinkowice — isolamento di partizioni esterne. (pareti, soffitto); scambio di fonti di calore, impianto fotovoltaico con metro 4.Scuola di base a Januszowa — isolamento di partizioni esterne. (pareti), sostituzione di finestre, porte, installazione di un contatore di calore 5.Scuola di base a Klęczany — isolamento di divisori esterni (pareti, soffitti), scambio di luxspheres, scambio di fonti di calore — biomassa, contatore di calore, ammodernamento di inst. c.o. 6. Scuola primaria in basso — isolamento di divisori esterni. (pareti, soffitti), scambio di fonti di calore — biomassa, contatore di calore, sostituzione di inst. c.o. 7. Scuola primaria di Rdziostów — isolamento di partizioni esterne. (pareti, soffitto), sostituzione di finestre, porte, sostituzione fonte di calore — biomassa, contatore di calore, ammodernamento di inst. c.o. con regolazione di 8.Schomranice Scuole — isolamento di divisori esterni. (pareti, soffitto), scambio di fonte di calore e acqua calda — gas, calore e contatori di acqua calda, regolazione di inst. c.o. 9.Scuola in Marcinkowice — isolamento di partizioni esterne. (pareti, soffitto), sostituzione porta, cambio inst. c.o. con regolazione, contatori di calore. 10.Scuola a Paszyn — isolamento di pareti esterne (pareti, soffitti), sostituzione delle porte, sostituzione dell'inst. c.o., sostituzione della fonte di calore — gas, contatore di calore Continuando al punto Q della domanda di finanziamento (Italian) / qualifier | |||||||||||||||
point in time: 15 January 2022
|
Revision as of 10:41, 15 January 2022
Project Q112225 in Poland
Language | Label | Description | Also known as |
---|---|---|---|
English | Thermal modernisation of public buildings and increased use of renewable energy sources in the municipality of Chełmiec |
Project Q112225 in Poland |
Statements
1,754,506.87 zloty
0 references
4,178,392.39 zloty
0 references
41.99 percent
0 references
30 September 2016
0 references
28 December 2018
0 references
GMINA CHEŁMIEC
0 references
Inwestycja polega na przeprowadzeniu prac termomodernizacyjnych, modernizacji systemów grzewczych, zastosowaniu OZE (fotowoltaika, kolektory słoneczne, biomasa) w 11 budynkach użyteczności publicznej. Optymalny zakres prac określono na podstawie audytów energetycznych opracowanych zgodnie z „Metodyką ...”: Zakres prac wynikający z audytu oraz pozostałe niezbędne elementy obejmują następujące zadania i działania (opisane szczegółowo w punkcie C.2.3): 1.Koszty przygotowawcze: 1.1 audyty energetyczne; 1.2 analiza finansowo-ekonomiczna; 1.3 program funkcjonalno-użytkowy 2.Termomodernizacja - Gminny Ośrodek Pomocy Społecznej - docieplenie przegród zewn. (ściany, stropy), montaż licznika 3.Oddział Przedszkolny w Marcinkowicach - docieplenie przegród zewn. (ściany, strop); wymiana źródeł ciepła, system fotowoltaiczny z licznikiem 4.Szkoła Podstawowa w Januszowej - docieplenie przegród zewn. (ściany), wymiana okien, drzwi, montaż licznika ciepła 5.Szkoła Podstawowa w Klęczanach - docieplenie przegród zewn.(ściany, stropy), wymiana luksferów, wymiana źródła ciepła – biomasa, licznik ciepła, modernizacja inst. c.o. 6.Szkoła Podstawowa w Niskowej - docieplenie przegród zewn. (ściany, stropy), wymiana źródła ciepła - biomasa, licznik ciepła, wymiana inst. c.o. 7.Szkoła Podstawowa w Rdziostowie - docieplenie przegród zewn. (ściany, strop), wymiana okien, drzwi, wymiana źródła ciepła - biomasa, licznik ciepła, modernizacja inst. c.o. z regulacją 8.Zespół Szkół w Chomranicach - docieplenie przegród zewn. (ściany, strop), wymiana źródła ciepła i c.w.u - gaz, liczniki ciepła i ciepłej wody, regulacja inst. c.o. 9.Zespół Szkół w Marcinkowicach - docieplenie przegród zewn. (ściany, strop), wymiana drzwi, wymiana inst. c.o. z regulacją, liczniki ciepła. 10.Zespół Szkół w Paszynie - docieplenie przegród zewn.(ściany, stropy), wymiana drzwi, wymiana inst. c.o., Wymiana źródła ciepła – gaz, licznik ciepła Ciąg dalszy w punkcie Q wniosku o dofinansowanie (Polish)
0 references
The investment consists of carrying out thermal modernisation works, modernisation of heating systems, the use of RES (photovoltaics, solar collectors, biomass) in 11 public utility buildings. The optimal scope of work was determined on the basis of energy audits developed in accordance with the “... method”: The scope of audit work and other necessary elements include the following tasks and activities (described in detail in point C.2.3): 1.Preparatory costs: 1.1 energy audits; 1.2 financial and economic analysis; 1.3 functional-use programme 2.Termomodernisation – Municipal Social Assistance Centre – insulation of external compartments. (walls, ceilings), installation of counter 3.Preschool division in Marcinkowice – insulation of external compartments. (walls, ceilings); exchange of heat sources, photovoltaic system with counter 4.Basic School in Januszowa – insulation of external compartments. (walls), replacement of windows, doors, installation of heat meter 5.Basic School in Klęczany – insulation of outer compartments (walls, ceilings), exchange of luxpheres, exchange of heat source – biomass, heat counter, modernisation of the central heating unit 6. (walls, ceilings), exchange of heat source – biomass, heat counter, exchange inst. c.o. 7. Primary school in Rdziostów – warming of outer compartments. (walls, ceiling), replacement of windows, doors, exchange of heat source – biomass, heat counter, modernisation of central heating with regulation 8.School in Chomranice – insulation of outer partitions. (walls, ceiling), replacement of heat source and hot water – gas, heat meters and hot water, regulation of the 9th Central Schools Team in Marcinkowice – insulation of outer partitions. (walls, ceiling), replacement of doors, exchange of central heating with adjustable, heat meters. 10.School team in Paszyn – insulation of outer compartments (walls, ceilings), door replacement, replacement of central heating, heat source exchange – gas, heat counter Continue in point Q of the application for funding (English)
20 October 2020
0 references
L’investissement consiste en des travaux de modernisation thermique, de modernisation des systèmes de chauffage, d’application des SER (photovoltaïque, capteurs solaires, biomasse) dans 11 bâtiments publics. La portée optimale des travaux a été déterminée sur la base d’audits énergétiques élaborés conformément à la «méthodologie de...»: Le champ d’application des travaux d’audit et les autres éléments nécessaires comprennent les tâches et activités suivantes (décrites en détail au point C.2.3): 1.Coûts de préparation: 1.1 audits énergétiques; 1.2 Analyse financière et économique; 1.3 Programme d’utilisation fonctionnelle 2.Termomodernisation — Centre municipal de protection sociale — isolation des cloisons extérieures. (murs, plafonds), installation du comptoir 3.Kindergarten branche à Marcinkowice — isolation des cloisons extérieures. (murs, plafond); échange de sources de chaleur, système photovoltaïque avec mètre 4.école de base à Januszowa — isolation des cloisons extérieures. (murs), remplacement des fenêtres, portes, installation d’un compteur de chaleur 5.École de base à Klęczany — isolation des cloisons extérieures (murs, plafonds), échange de luxsphères, échange de sources de chaleur — biomasse, compteur de chaleur, modernisation de l’école primaire en bas — isolation des cloisons extérieures. (murs, plafonds), échange de sources de chaleur — biomasse, compteur de chaleur, remplacement de l’inst. c.o. 7. École primaire à Rdziostów — isolation des cloisons extérieures. (murs, plafond), remplacement des fenêtres, portes, remplacement des sources de chaleur — biomasse, thermomètre, modernisation de l’inst. c.o. avec réglage de 8.Schomranice Schools — isolation des cloisons extérieures. (murs, plafond), échange de source de chaleur et d’eau chaude — compteurs de gaz, de chaleur et d’eau chaude, régulation de l’inst. c.o. 9.School à Marcinkowice — isolation des cloisons extérieures. (murs, plafond), remplacement de porte, changement de c.a. inst. avec réglage, compteurs de chaleur. 10.École à Paszyn — isolation des cloisons extérieures (murs, plafonds), remplacement de porte, remplacement de l’inst. c.o., remplacement de la source de chaleur — gaz, thermomètre Continuer au point Q de la demande de financement (French)
1 December 2021
0 references
Die Investition besteht aus thermischen Modernisierungsarbeiten, Modernisierung von Heizsystemen, Einsatz von RES (Photovoltaik, Solarkollektoren, Biomasse) in 11 öffentlichen Gebäuden. Der optimale Arbeitsumfang wurde anhand von Energieaudits ermittelt, die gemäß der „Methode von...“ entwickelt wurden: Der Umfang der Prüfungstätigkeit und die sonstigen erforderlichen Elemente umfassen die folgenden Aufgaben und Tätigkeiten (im Einzelnen unter Punkt C.2.3) beschrieben: 1.Vorbereitende Kosten: 1.1 Energieaudits; 1.2 Finanz- und Wirtschaftsanalyse; 1.3 Funktionelle Nutzungsprogramm 2.Termomodernisierung – kommunales Sozialzentrum – Isolierung von externen Trennwänden. (Wände, Decken), Einbau des Zählers 3.Kindergarten in Marcinkowice – Isolierung der äußeren Trennwände. (Wände, Decke); Austausch von Wärmequellen, Photovoltaik-Anlage mit Meter 4.Grundschule in Januszowa – Isolierung von externen Trennwänden. (Wände), Austausch von Fenstern, Türen, Installation des Wärmezählers 5. Grundschule in Klęczany – Isolierung der äußeren Trennwände (Wände, Decken), Austausch von Luxussphären, Wärmetausch – Biomasse, Wärmezähler, Modernisierung von inst. c.o. 6. Grundschule in niedrigen – Isolierung der äußeren Trennwände. (Wände, Decken), Wärmetausch – Biomasse, Wärmezähler, Ersatz von inst. u. a. 7. Grundschule in Rdziostów – Isolierung der äußeren Trennwände. (Wände, Decke), Austausch von Fenstern, Türen, Wärmequellenersatz – Biomasse, Wärmezähler, Modernisierung von inst. c.o. mit Einstellung von 8.Schomranice Schulen – Isolierung externer Trennwände. (Wände, Decke), Austausch von Wärmequelle und Warmwasser – Gas-, Wärme- und Warmwasserzähler, Regulierung von inst. c.o. 9.Schule in Marcinkowice – Isolierung der äußeren Trennwände. (Wände, Decke), Türwechsel, Wechsel von Inst. u. a. mit Einstellung, Wärmezähler. 10.Schule in Paszyn – Isolierung von externen Trennwänden (Wände, Decken), Türwechsel, Ersatz von inst. c.o., Austausch von Wärmequelle – Gas, Wärmezähler Fortsetzung in Punkt Q des Antrags auf Finanzierung (German)
7 December 2021
0 references
De investering bestaat uit thermische moderniseringswerken, modernisering van verwarmingssystemen, toepassing van RES (fotovoltaïsche energie, zonnecollectoren, biomassa) in 11 openbare gebouwen. De optimale reikwijdte van de werkzaamheden werd bepaald op basis van energieaudits die werden ontwikkeld in overeenstemming met de „Methodologie van...”: De reikwijdte van de auditwerkzaamheden en de andere noodzakelijke elementen omvatten de volgende taken en activiteiten (in detail beschreven in punt C.2.3): 1.Voorbereidende kosten: 1.1 energieaudits; 1.2 Financiële en economische analyse; 1.3 Functioneel gebruiksprogramma 2.Termomodernisering — Gemeentelijk Sociaal Welzijnscentrum — isolatie van externe scheidingswanden. (muren, plafonds), installatie van de teller 3.Kindergarten tak in Marcinkowice — isolatie van externe scheidingswanden. (muren, plafond); uitwisseling van warmtebronnen, fotovoltaïsche systeem met meter 4.Basisschool in Januszowa — isolatie van externe scheidingswanden. (muren), vervanging van ramen, deuren, installatie van een warmtemeter 5.Basisschool in Klęczany — isolatie van externe scheidingswanden (muren, plafonds), uitwisseling van luxe, warmtebron uitwisseling — biomassa, warmtemeter, modernisering van inst. c.o. 6. Primaire school in lage — isolatie van externe scheidingswanden. (muren, plafonds), warmtebron uitwisseling — biomassa, warmtemeter, vervanging van inst. c.o. 7. Primaire school in Rdziostów — isolatie van externe scheidingswanden. (muren, plafond), vervanging van ramen, deuren, warmtebron vervanging — biomassa, warmtemeter, modernisering van inst. c.o. met aanpassing van 8.Schomranice scholen — isolatie van externe scheidingswanden. (muren, plafond), uitwisseling van warmtebron en warm water — gas, warmte en warm water meters, regeling van inst. c.o. 9.School in Marcinkowice — isolatie van externe scheidingswanden. (muren, plafond), deurvervanging, verandering van inst. c.o. met aanpassing, warmtemeters. 10.School in Paszyn — isolatie van externe scheidingswanden (muren, plafonds), deurvervanging, vervanging van inst. c.o., vervanging van warmtebron — gas, warmtemeter Continuing in punt Q van de aanvraag voor financiering (Dutch)
17 December 2021
0 references
L'investimento consiste in lavori di ammodernamento termico, ammodernamento degli impianti di riscaldamento, applicazione di FER (fotovoltaico, collettori solari, biomassa) in 11 edifici pubblici. La portata ottimale del lavoro è stata determinata sulla base di audit energetici elaborati in conformità con la "Metodologia di...": L'ambito del lavoro di audit e gli altri elementi necessari comprendono i seguenti compiti e attività (descritti in dettaglio al punto C.2.3): 1.Costi preparatori: 1.1 audit energetici; 1.2 Analisi finanziaria ed economica; 1.3 Programma di uso funzionale 2.Termomodernizzazione — Centro comunale di previdenza sociale — isolamento delle partizioni esterne. (pareti, soffitti), installazione del banco 3.Kindergarten ramo in Marcinkowice — isolamento di partizioni esterne. (pareti, soffitto); scambio di fonti di calore, impianto fotovoltaico con metro 4.Scuola di base a Januszowa — isolamento di partizioni esterne. (pareti), sostituzione di finestre, porte, installazione di un contatore di calore 5.Scuola di base a Klęczany — isolamento di divisori esterni (pareti, soffitti), scambio di luxspheres, scambio di fonti di calore — biomassa, contatore di calore, ammodernamento di inst. c.o. 6. Scuola primaria in basso — isolamento di divisori esterni. (pareti, soffitti), scambio di fonti di calore — biomassa, contatore di calore, sostituzione di inst. c.o. 7. Scuola primaria di Rdziostów — isolamento di partizioni esterne. (pareti, soffitto), sostituzione di finestre, porte, sostituzione fonte di calore — biomassa, contatore di calore, ammodernamento di inst. c.o. con regolazione di 8.Schomranice Scuole — isolamento di divisori esterni. (pareti, soffitto), scambio di fonte di calore e acqua calda — gas, calore e contatori di acqua calda, regolazione di inst. c.o. 9.Scuola in Marcinkowice — isolamento di partizioni esterne. (pareti, soffitto), sostituzione porta, cambio inst. c.o. con regolazione, contatori di calore. 10.Scuola a Paszyn — isolamento di pareti esterne (pareti, soffitti), sostituzione delle porte, sostituzione dell'inst. c.o., sostituzione della fonte di calore — gas, contatore di calore Continuando al punto Q della domanda di finanziamento (Italian)
15 January 2022
0 references
Identifiers
RPMP.04.03.02-12-0197/16
0 references