label / itlabel / it
 
Costruzione di un impianto di depurazione a Krempachy con la costruzione di una rete igienico-sanitaria a Krempachy.
Property / summary
 
Come parte dell'investimento, 10,75 km di rete fognaria a Krempachy saranno costruiti: DN 300 160 mm con una lunghezza di 7 362,10 m e collegamenti gravitazionali di 160 mm tubi in PVC ed estrusione in PE di 50 mm per una lunghezza totale di 3 393,60 m.L'investimento prevede anche la costruzione di un impianto di trattamento meccanico biologico delle acque reflue a Krempachy. Capacità dell'impianto di trattamento: portata massima oraria Qhmax 76,7 m3h portata di media giornata Qdśr 500 m3d portata massima giornaliera Qdmax 800 m3dNel quadro della costruzione di un impianto di depurazione in m. Krempachy è prevista per la costruzione: costruzione sociale: volume di 611 m³, superficie Edificio tecnologico di 135,59 m²: 750 m³, 138,78 m² edificio di disidratazione dei sedimenti: 533 m³, 106,56 m² Conformità dell'agglomerato oggetto del progetto di disposizioni della direttiva sul trattamento delle acque reflue urbane: Condizione prima dell'attuazione.Carico degli agglomerati a.e. 0Livello di raccolta del carico 0Livello di connessione nel carico 0IAS singoli sistemi e altri sistemi pertinenti: nel carico 0Officienza dell'impianto di trattamento delle acque reflue urbane al servizio di un determinato agglomerato a.e. 0 RLMOlivello applicabile di trattamento secondarioOffettività 0 a.e. Condizione dopo l'attuazione: Carico dell'agglomerato a.e. 2660Livello di raccolta del carico 70,68 W m. La nuova parte bianca del sistema fognario sarà costruita in una data successiva.Il livello di connessione nel carico 70,68IAS sistemi singoli e altri sistemi appropriati: in carico 0La capacità dell'impianto di trattamento delle acque reflue urbane che serve un determinato agglomerato a.e. Il nuovo impianto, la capacità dell'impianto di trattamento di 500md, garantisce la pulizia dell'intero carico dell'agglomerato 3767livello applicabile di trattamento: BZT525, ChZT125, SS35, N15, capacità di purificazione P2P 500md (Italian)
Property / summary: Come parte dell'investimento, 10,75 km di rete fognaria a Krempachy saranno costruiti: DN 300 160 mm con una lunghezza di 7 362,10 m e collegamenti gravitazionali di 160 mm tubi in PVC ed estrusione in PE di 50 mm per una lunghezza totale di 3 393,60 m.L'investimento prevede anche la costruzione di un impianto di trattamento meccanico biologico delle acque reflue a Krempachy. Capacità dell'impianto di trattamento: portata massima oraria Qhmax 76,7 m3h portata di media giornata Qdśr 500 m3d portata massima giornaliera Qdmax 800 m3dNel quadro della costruzione di un impianto di depurazione in m. Krempachy è prevista per la costruzione: costruzione sociale: volume di 611 m³, superficie Edificio tecnologico di 135,59 m²: 750 m³, 138,78 m² edificio di disidratazione dei sedimenti: 533 m³, 106,56 m² Conformità dell'agglomerato oggetto del progetto di disposizioni della direttiva sul trattamento delle acque reflue urbane: Condizione prima dell'attuazione.Carico degli agglomerati a.e. 0Livello di raccolta del carico 0Livello di connessione nel carico 0IAS singoli sistemi e altri sistemi pertinenti: nel carico 0Officienza dell'impianto di trattamento delle acque reflue urbane al servizio di un determinato agglomerato a.e. 0 RLMOlivello applicabile di trattamento secondarioOffettività 0 a.e. Condizione dopo l'attuazione: Carico dell'agglomerato a.e. 2660Livello di raccolta del carico 70,68 W m. La nuova parte bianca del sistema fognario sarà costruita in una data successiva.Il livello di connessione nel carico 70,68IAS sistemi singoli e altri sistemi appropriati: in carico 0La capacità dell'impianto di trattamento delle acque reflue urbane che serve un determinato agglomerato a.e. Il nuovo impianto, la capacità dell'impianto di trattamento di 500md, garantisce la pulizia dell'intero carico dell'agglomerato 3767livello applicabile di trattamento: BZT525, ChZT125, SS35, N15, capacità di purificazione P2P 500md (Italian) / rank
 
Normal rank
Property / summary: Come parte dell'investimento, 10,75 km di rete fognaria a Krempachy saranno costruiti: DN 300 160 mm con una lunghezza di 7 362,10 m e collegamenti gravitazionali di 160 mm tubi in PVC ed estrusione in PE di 50 mm per una lunghezza totale di 3 393,60 m.L'investimento prevede anche la costruzione di un impianto di trattamento meccanico biologico delle acque reflue a Krempachy. Capacità dell'impianto di trattamento: portata massima oraria Qhmax 76,7 m3h portata di media giornata Qdśr 500 m3d portata massima giornaliera Qdmax 800 m3dNel quadro della costruzione di un impianto di depurazione in m. Krempachy è prevista per la costruzione: costruzione sociale: volume di 611 m³, superficie Edificio tecnologico di 135,59 m²: 750 m³, 138,78 m² edificio di disidratazione dei sedimenti: 533 m³, 106,56 m² Conformità dell'agglomerato oggetto del progetto di disposizioni della direttiva sul trattamento delle acque reflue urbane: Condizione prima dell'attuazione.Carico degli agglomerati a.e. 0Livello di raccolta del carico 0Livello di connessione nel carico 0IAS singoli sistemi e altri sistemi pertinenti: nel carico 0Officienza dell'impianto di trattamento delle acque reflue urbane al servizio di un determinato agglomerato a.e. 0 RLMOlivello applicabile di trattamento secondarioOffettività 0 a.e. Condizione dopo l'attuazione: Carico dell'agglomerato a.e. 2660Livello di raccolta del carico 70,68 W m. La nuova parte bianca del sistema fognario sarà costruita in una data successiva.Il livello di connessione nel carico 70,68IAS sistemi singoli e altri sistemi appropriati: in carico 0La capacità dell'impianto di trattamento delle acque reflue urbane che serve un determinato agglomerato a.e. Il nuovo impianto, la capacità dell'impianto di trattamento di 500md, garantisce la pulizia dell'intero carico dell'agglomerato 3767livello applicabile di trattamento: BZT525, ChZT125, SS35, N15, capacità di purificazione P2P 500md (Italian) / qualifier
 
point in time: 15 January 2022
Timestamp+2022-01-15T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 10:41, 15 January 2022

Project Q112669 in Poland
Language Label Description Also known as
English
Construction of a sewage treatment plant in Krempachy with the construction of a sewage system in Krempachy.
Project Q112669 in Poland

    Statements

    0 references
    4,687,346.37 zloty
    0 references
    1,124,963.13 Euro
    13 January 2020
    0 references
    6,260,647.02 zloty
    0 references
    1,502,555.28 Euro
    13 January 2020
    0 references
    74.87 percent
    0 references
    1 October 2017
    0 references
    31 December 2019
    0 references
    GMINA NOWY TARG
    0 references
    W ramach inwestycji wybudowane zostanie 10,75 km sieci kanalizacyjnej w m. Krempachy: DN 300 160 mm o długości 7.362,10 m oraz przyłączy grawitacyjnych rury PCV 160 mm i tłocznych rury PE 50 mm o łącznej długości 3.393,60 mb.Inwestycja zakłada też budowę mechanicznobiologicznej oczyszczalni ścieków w miejscowości Krempachy. Wydajność oczyszczalni: przepływ max godzinowy Qhmax 76,7 m3h przepływ średniodobowy Qdśr 500 m3d przepływ max dobowy Qdmax 800 m3dW ramach budowy oczyszczalni ścieków w m. Krempachy planuje się budowę: budynek socjalny: kubatura 611 m3, pow. zab. 135,59 m2 budynek technologiczny: 750 m3, 138,78 m2 budynek odwadniania osadów: 533 m3, 106,56 m2Przestrzegania przez aglomerację będącą przedmiotem projektu przepisów dyrektywy dotyczącej oczyszczania ścieków komunalnych: Stan przed realizacją.Ładunek aglomeracji RLM 0Poziom zbierania w ładunku 0Poziom powiązania w ładunku 0IAS pojedyncze systemy i inne właściwe systemy: w ładunku 0Wydajność oczyszczalni ścieków komunalnych obsługującej daną aglomerację RLM 0 RLMObowiązujący poziom oczyszczania oczyszczanie wtórneWydajność oczyszczania 0 RLM Stan po realizacji:Ładunek aglomeracji RLM 2660Poziom zbierania w ładunku 70,68 W m. Nowa Biała część kanalizacji zostanie wybudowana w późn. terminie.Poziom powiązania w ładunku 70,68IAS pojedyncze systemy i inne właściwe systemy: w ładunku 0Wydajność oczyszczalni ścieków komunalnych obsługującej daną aglomerację RLM Obiekt nowy, wydajność oczyszczalni 500md, zapewnia oczyścić cały ładunek aglomeracji 3767Obowiązujący poziom oczyszczania: BZT525, ChZT125, SS35, N15, P2Wydajność oczyszczania 500 md (Polish)
    0 references
    As part of the investment, 10.75 km of sewage network will be built in Krempachy: Dn 300160 mm with a length of 7362.10 m and gravitational connections of 160 mm PVC pipe and 50 mm PE pipe with a total length of 3.393.60 m.The investment also assumes the construction of a mechanical sewage treatment plant in Krempachy. Efficiency of the treatment plant: hourly flow Qhmax 76.7 m3h medium daily flow Qdśr 500 m3d max daily flow Qdmax 800 m3dThe construction of a sewage treatment plant in m. Krempachy is planned to build: social building: cubicure 611 m³, per. tob. 135,59 m² technological building: 750 m³, 138,78 m² sediment drainage building: 533 m³, 106,56 m2Respect by agglomeration which is the subject of the draft provisions of the Urban Waste Water Treatment Directive: Load of the agglomeration RLM 0Aggregation level in cargo 0 Level of connection in cargo 0IAS single systems and other relevant systems: in cargo 0The efficiency of the municipal waste water treatment plant supporting the RLM 0 RLM agglomeration level of secondary treatmentThe treatment efficiency of 0 RLM Condition after implementation:The load load RLM 2660Receiving level of collection in cargo 70,68 W m. The new White part of the sewer will be built late.The level of connections in the load 70,68IAS single systems and other relevant systems: in cargo 0The efficiency of the municipal waste water treatment plant supporting the RLM agglomeration The new facility, 500md treatment plant efficiency, ensures cleansing of the entire agglomeration charge 3767Applicable level of treatment: BZT525, COD125, SS35, N15, P2 Purification efficiency 500 md (English)
    20 October 2020
    0 references
    Dans le cadre de l’investissement, 10,75 km de réseau d’assainissement à Krempachy seront construits: DN 300 160 mm avec une longueur de 7 362,10 m et raccords gravitationnels de 160 mm en PVC et tuyau d’extrusion PE de 50 mm d’une longueur totale de 3 393,60 m.L’investissement implique également la construction d’une station d’épuration mécanique biologique des eaux usées à Krempachy. Capacité de la station de traitement: débit horaire maximum Qhmax 76,7 m3h débit moyen-jour Qdśr 500 m3d débit journalier max Qdmax 800 m3dDans le cadre de la construction d’une station d’épuration en m. Krempachy est prévu de construire: construction sociale: volume de 611 m³, surface 135,59 m² de bâtiment technologique: 750 m³, 138,78 m² bâtiment d’assèchement des sédiments: 533 m³, 106,56 m2Conformité par l’agglomération couverte par le projet de dispositions de la directive relative au traitement des eaux urbaines résiduaires: Condition préalable à la mise en œuvre.Load of agglomérations p.e. 0Niveau de collecte en charge 0Niveau de raccordement dans la charge 0IAS systèmes individuels et autres systèmes pertinents: dans la charge 0Officiency de l’usine de traitement des eaux urbaines résiduaires desservant une agglomération donnée p.e. 0 RLMO Niveau applicable de traitement secondaireOffectives 0 E.P. Etat après mise en œuvre: Charge de l’agglomération p.e. 2660Niveau de collecte en charge 70,68 W m. La nouvelle partie blanche du système d’égouts sera construite à une date ultérieure.Le niveau de raccordement dans les systèmes de charge 70,68IAS et autres systèmes appropriés: en charge 0La capacité de l’usine de traitement des eaux urbaines résiduaires desservant une agglomération donnée p.e. La nouvelle installation, la capacité de la station de traitement de 500 md, assure le nettoyage de l’ensemble de la charge de l’agglomération 3767Niveau de traitement applicable: BZT525, ChZT125, SS35, N15, P2P Capacité de purification 500md (French)
    1 December 2021
    0 references
    Im Rahmen der Investition werden in Krempachy 10,75 km Kanalisationsnetze errichtet: DN 300 160 mm mit einer Länge von 7 362,10 m und Gravitationsverbindungen von 160 mm PVC-Rohr und Extrusions-PE-Rohr von 50 mm mit einer Gesamtlänge von 3 393,60 m.Die Investition beinhaltet auch den Bau einer mechanischen biologischen Kläranlage in Krempachy. Kapazität der Kläranlage: Durchfluss max stündlich Qhmax 76,7 m3h Mitteltagesstrom Qdśr 500 m3d max täglichen Durchfluss Qdmax 800 m3dIm Rahmen des Baus einer Kläranlage in m. Krempachy soll bauen: soziales Gebäude: Volumen von 611 m³, Fläche 135,59 m² technologisches Gebäude: 750 m³, 138,78 m² Sedimententwässerungsgebäude: 533 m³, 106,56 m2Konformität mit dem Ballungsraum, der Gegenstand des Entwurfs der Richtlinie über die Behandlung von kommunalem Abwasser ist: Zustand vor der Implementierung.Load of Agglomerations S.e. 0Stufe der Abholung in Last 0Level der Verbindung in Last 0IAS-Einzelsysteme und andere relevante Systeme: in der Last 0Offizienz der kommunalen Abwasserbehandlungsanlage, die eine gegebene Agglomeration bedient, p.e. 0 RLMOAnwendbares Niveau der sekundären BehandlungsbehandlungOffectiveness 0 S. E. Zustand nach der Umsetzung: Belastung der Ballungsräume S. 2660Auftragsebene in Last 70,68 W m. Der neue weiße Teil des Abwassersystems wird zu einem späteren Zeitpunkt gebaut.Die Anschlusshöhe in der Last 70,68IAS Einzelsysteme und andere geeignete Systeme: in Belastbarkeit 0Die Kapazität der kommunalen Abwasserbehandlungsanlage in einem bestimmten Ballungsraum p.e. Die neue Anlage, die Kapazität der 500md Kläranlage, sorgt für die Reinigung der gesamten Belastung des Ballungsraums 3767Anwendbarer Behandlungsgrad: BZT525, ChZT125, SS35, N15, P2P Reinigungskapazität 500md (German)
    7 December 2021
    0 references
    In het kader van de investering zal 10,75 km rioleringsnetwerk in Krempachy worden gebouwd: DN 300 160 mm met een lengte van 7 362,10 m en zwaartekrachtaansluitingen van 160 mm PVC buis en extrusie PE buis van 50 mm met een totale lengte van 3.393,60 m. De investering omvat ook de bouw van een mechanische biologische zuiveringsinstallatie in Krempachy. Capaciteit van de zuiveringsinstallatie: stroom max per uur Qhmax 76,7 m3h medium-day flow Qdśr 500 m3d max dagelijkse stroom Qdmax 800 m3dIn het kader van de bouw van een rioolwaterzuiveringsinstallatie in m. Krempachy is gepland om te bouwen: sociaal gebouw: volume van 611 m³, oppervlakte 135,59 m² technologisch gebouw: 750 m³, 138,78 m² sedimentontwateringsgebouw: 533 m³, 106,56 m2Naleving door de agglomeratie waarop de ontwerpbepalingen van de richtlijn inzake de behandeling van stedelijk afvalwater van toepassing zijn: Voorwaarde voorafgaand aan de tenuitvoerlegging.Load van agglomeraties i.e. 0Level van inzameling in lading 0Level van aansluiting in lading 0IAS individuele systemen en andere relevante systemen: in de belasting 0Officiëntie van de stedelijke waterzuiveringsinstallatie ten dienste van een bepaalde agglomeratie i.e. 0 RLMO Toepasselijk niveau van secundaire behandelingOffectiviteit 0 i.e. Staat na implementatie: Lading van agglomeratie i.e. 2660Level van inzameling in last 70,68 W m. Het nieuwe Witte deel van het rioolsysteem zal later worden gebouwd.Het aansluitniveau in de lading 70,68IAS enkele systemen en andere geschikte systemen: in belasting 0De capaciteit van de stedelijke waterzuiveringsinstallatie ten dienste van een bepaalde agglomeratie i.e. De nieuwe installatie, de capaciteit van de 500md zuiveringsinstallatie, zorgt voor de reiniging van de volledige belasting van agglomeratie 3767Toepasselijk niveau van behandeling: BZT525, ChZT125, SS35, N15, P2P Zuiveringscapaciteit 500md (Dutch)
    17 December 2021
    0 references
    Come parte dell'investimento, 10,75 km di rete fognaria a Krempachy saranno costruiti: DN 300 160 mm con una lunghezza di 7 362,10 m e collegamenti gravitazionali di 160 mm tubi in PVC ed estrusione in PE di 50 mm per una lunghezza totale di 3 393,60 m.L'investimento prevede anche la costruzione di un impianto di trattamento meccanico biologico delle acque reflue a Krempachy. Capacità dell'impianto di trattamento: portata massima oraria Qhmax 76,7 m3h portata di media giornata Qdśr 500 m3d portata massima giornaliera Qdmax 800 m3dNel quadro della costruzione di un impianto di depurazione in m. Krempachy è prevista per la costruzione: costruzione sociale: volume di 611 m³, superficie Edificio tecnologico di 135,59 m²: 750 m³, 138,78 m² edificio di disidratazione dei sedimenti: 533 m³, 106,56 m² Conformità dell'agglomerato oggetto del progetto di disposizioni della direttiva sul trattamento delle acque reflue urbane: Condizione prima dell'attuazione.Carico degli agglomerati a.e. 0Livello di raccolta del carico 0Livello di connessione nel carico 0IAS singoli sistemi e altri sistemi pertinenti: nel carico 0Officienza dell'impianto di trattamento delle acque reflue urbane al servizio di un determinato agglomerato a.e. 0 RLMOlivello applicabile di trattamento secondarioOffettività 0 a.e. Condizione dopo l'attuazione: Carico dell'agglomerato a.e. 2660Livello di raccolta del carico 70,68 W m. La nuova parte bianca del sistema fognario sarà costruita in una data successiva.Il livello di connessione nel carico 70,68IAS sistemi singoli e altri sistemi appropriati: in carico 0La capacità dell'impianto di trattamento delle acque reflue urbane che serve un determinato agglomerato a.e. Il nuovo impianto, la capacità dell'impianto di trattamento di 500md, garantisce la pulizia dell'intero carico dell'agglomerato 3767livello applicabile di trattamento: BZT525, ChZT125, SS35, N15, capacità di purificazione P2P 500md (Italian)
    15 January 2022
    0 references

    Identifiers

    RPMP.05.03.02-12-0018/17