WATER SUPPLY OF NEW RAILWAY BUILDINGS (C PHASE) (Q2808464): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in nl, and other parts: Adding Dutch translations)
(‎Changed label, description and/or aliases in it, and other parts: Adding Italian translations)
label / itlabel / it
 
RISORSE IDRICHE DELLA NUOVA INDUSTRIA SIDROCHRIOU (FASE C)
Property / summary
 
Il progetto riguarda la fase C del progetto parziale di approvvigionamento idrico per insediamenti dell'Unità Comunale di Neos Sidirochori del Comune di Komotini: — Costruzione di una nuova stazione di pompaggio nella zona dell'insediamento di Kosmiou, composta da un insediamento e un serbatoio sotterraneo di 60 m², dove saranno installate 4 pompe subacquee. — Estrazione e sfruttamento di 2 nuove operazioni di perforazione (C3 e C4) e installazione di pompe. Installazione di nuove pompe in 2 fori di perforazione esistenti (C1 e C2). — Costruzione di condutture alla nuova stazione di pompaggio con una lunghezza totale di 2,450 m — Costruzione di una conduttura dalla nuova stazione di pompaggio al pozzo della torre d'acqua di Kosmios, 1,956 m., e una conduttura che collega il serbatoio di Agioi Theodoroi alla rete esistente, 650 m di lunghezza — Costruzione di nuove condutture nella torre d'acqua di Kosmiou per le esigenze del progetto di 140 m di lunghezza. (Italian)
Property / summary: Il progetto riguarda la fase C del progetto parziale di approvvigionamento idrico per insediamenti dell'Unità Comunale di Neos Sidirochori del Comune di Komotini: — Costruzione di una nuova stazione di pompaggio nella zona dell'insediamento di Kosmiou, composta da un insediamento e un serbatoio sotterraneo di 60 m², dove saranno installate 4 pompe subacquee. — Estrazione e sfruttamento di 2 nuove operazioni di perforazione (C3 e C4) e installazione di pompe. Installazione di nuove pompe in 2 fori di perforazione esistenti (C1 e C2). — Costruzione di condutture alla nuova stazione di pompaggio con una lunghezza totale di 2,450 m — Costruzione di una conduttura dalla nuova stazione di pompaggio al pozzo della torre d'acqua di Kosmios, 1,956 m., e una conduttura che collega il serbatoio di Agioi Theodoroi alla rete esistente, 650 m di lunghezza — Costruzione di nuove condutture nella torre d'acqua di Kosmiou per le esigenze del progetto di 140 m di lunghezza. (Italian) / rank
 
Normal rank
Property / summary: Il progetto riguarda la fase C del progetto parziale di approvvigionamento idrico per insediamenti dell'Unità Comunale di Neos Sidirochori del Comune di Komotini: — Costruzione di una nuova stazione di pompaggio nella zona dell'insediamento di Kosmiou, composta da un insediamento e un serbatoio sotterraneo di 60 m², dove saranno installate 4 pompe subacquee. — Estrazione e sfruttamento di 2 nuove operazioni di perforazione (C3 e C4) e installazione di pompe. Installazione di nuove pompe in 2 fori di perforazione esistenti (C1 e C2). — Costruzione di condutture alla nuova stazione di pompaggio con una lunghezza totale di 2,450 m — Costruzione di una conduttura dalla nuova stazione di pompaggio al pozzo della torre d'acqua di Kosmios, 1,956 m., e una conduttura che collega il serbatoio di Agioi Theodoroi alla rete esistente, 650 m di lunghezza — Costruzione di nuove condutture nella torre d'acqua di Kosmiou per le esigenze del progetto di 140 m di lunghezza. (Italian) / qualifier
 
point in time: 15 January 2022
Timestamp+2022-01-15T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 05:43, 15 January 2022

Project Q2808464 in Greece
Language Label Description Also known as
English
WATER SUPPLY OF NEW RAILWAY BUILDINGS (C PHASE)
Project Q2808464 in Greece

    Statements

    0 references
    378,790.0 Euro
    0 references
    22 September 2016
    0 references
    31 December 2023
    0 references
    ΔΗΜΟΤΙΚΗ ΕΠΙΧΕΙΡΗΣΗ ΥΔΡΕΥΣΗΣ ΑΠΟΧΕΤΕΥΣΗΣ ΚΟΜΟΤΗΝΗΣ (ΔΕΥΑ ΚΟΜΟΤΗΝΗΣ)
    0 references
    0 references

    41°10'1.60"N, 25°1'29.57"E
    0 references
    Το έργο αφορά στην Γ΄ φάση του τμηματοποιημένου έργου ύδρευσης οικισμών της Δημοτικής Ενότητας Νέου Σιδηροχωρίου του Δήμου Κομοτηνής με την: - Κατασκευή νέου αντλιοστασίου στην περιοχή του οικισμού Κοσμίου, που θα αποτελείται από οικίσκο και υπόγεια δεξαμενή 60 κ.μ., όπου θα εγκατασταθούν 4 υποβρύχιες αντλίες. - Ανόρυξη και αξιοποίηση 2 νέων γεωτρήσεων (Γ3 και Γ4) και εγκατάσταση αντλιών. Εγκατάσταση νέων αντλιών σε 2 υφιστάμενες γεωτρήσεις (Γ1 και Γ2). - Κατασκευή αγωγών μεταφοράς προς το νέο αντλιοστάσιοσυνολικού μήκους 2.450 μ. - Κατασκευή αγωγού μεταφοράς από το νέο αντλιοστάσιο στο φρεάτιο του υδατόπυργου του Κοσμίου, μήκους 1.956 μ., και αγωγού που θα συνδέει τη δεξαμενή των Αγίων Θεοδώρων με το υπάρχον δίκτυο, μήκους 650 μ. - Κατασκευή νέων αγωγών στον υδατόπυργο του Κοσμίου για τις ανάγκες του έργου μήκους 140 μ. (Greek)
    0 references
    The project concerns the third phase of the water supply project of the Municipal Unit of Neo Sidirochori of the Municipality of Komotini with: Construction of a new pumping station in the area of Kosmiou settlement, consisting of a house and underground tank of 60 m², where 4 underwater pumps will be installed. 2 new drilling (C3 and C4) and installation of pumps. Installation of new pumps on 2 existing wells (C1 and C2). — Construction of transport pipelines to the new pumping station of total length 2.450 m – Construction of a transport pipeline from the new pumping station to the water tower of Kosmio, 1,956 m long, and a pipeline connecting the reservoir of Agii Theodora to the existing network, 650 m long – Construction of new pipelines in the water tower of Kosmios for the needs of the work of 140 m length. (English)
    5 July 2021
    0 references
    Le projet concerne la phase C du projet partiel d’approvisionnement en eau pour les établissements de l’unité municipale de Neos Sidirochori de la municipalité de Komotini: — Construction d’une nouvelle station de pompage dans la zone du village de Kosmiou, composée d’une colonie et d’un réservoir souterrain de 60 m², où 4 pompes sous-marines seront installées. — Exploitation minière et exploitation de 2 nouvelles opérations de forage (C3 et C4) et installation de pompes. Installation de nouvelles pompes dans 2 forages existants (C1 et C2). — Construction de canalisations à la nouvelle station de pompage d’une longueur totale de 2,450 m — Construction d’un pipeline de la nouvelle station de pompage au puits du château d’eau de Kosmios, 1,956 m., et d’un pipeline reliant le réservoir d’Agioi Theodoroi au réseau existant, 650 m de long — Construction de nouveaux pipelines dans la tour d’eau de Kosmiou pour les besoins du projet de 140 m de long. (French)
    30 November 2021
    0 references
    Das Projekt betrifft Phase C des Teilprojekts Wasserversorgung für Siedlungen der Gemeinde Neos Sidirochori der Gemeinde Komotini durch: — Bau einer neuen Pumpstation im Gebiet der Siedlung Kosmiou, bestehend aus einer Siedlung und einem unterirdischen Tank von 60 m², wo 4 Unterwasserpumpen installiert werden. — Abbau und Nutzung von zwei neuen Bohrungen (C3 und C4) und Installation von Pumpen. Einbau neuer Pumpen in 2 vorhandenen Bohrlöchern (C1 und C2). — Bau von Rohrleitungen zur neuen Pumpstation mit einer Gesamtlänge von 2,450 m – Bau einer Pipeline von der neuen Pumpstation zum Brunnen des Wasserturms von Kosmios, 1,956 m, und einer Pipeline, die den Stausee von Agioi Theodoroi mit dem bestehenden Netz verbindet, 650 m lang – Bau neuer Rohrleitungen im Wasserturm von Kosmiou für die Bedürfnisse des 140 m langen Projekts. (German)
    6 December 2021
    0 references
    Het project betreft fase C van het gedeeltelijke watervoorzieningsproject voor nederzettingen van de gemeentelijke eenheid Neos Sidirochori van de gemeente Komotini door: Bouw van een nieuw pompstation in het gebied van de nederzetting Kosmiou, bestaande uit een nederzetting en een ondergrondse tank van 60 m², waar 4 onderwaterpompen zullen worden geïnstalleerd. — Winning en exploitatie van 2 nieuwe boorwerkzaamheden (C3 en C4) en installatie van pompen. Installatie van nieuwe pompen in 2 bestaande boorgaten (C1 en C2). — Bouw van pijpleidingen naar het nieuwe pompstation met een totale lengte van 2,450 m — Bouw van een pijpleiding van het nieuwe pompstation naar de put van de watertoren van Kosmios, 1,956 m., en een pijpleiding die het reservoir van Agioi Theodoroi verbindt met het bestaande netwerk, 650 m lang — Bouw van nieuwe pijpleidingen in de watertoren van Kosmiou voor de behoeften van het 140 m lange project. (Dutch)
    16 December 2021
    0 references
    Il progetto riguarda la fase C del progetto parziale di approvvigionamento idrico per insediamenti dell'Unità Comunale di Neos Sidirochori del Comune di Komotini: — Costruzione di una nuova stazione di pompaggio nella zona dell'insediamento di Kosmiou, composta da un insediamento e un serbatoio sotterraneo di 60 m², dove saranno installate 4 pompe subacquee. — Estrazione e sfruttamento di 2 nuove operazioni di perforazione (C3 e C4) e installazione di pompe. Installazione di nuove pompe in 2 fori di perforazione esistenti (C1 e C2). — Costruzione di condutture alla nuova stazione di pompaggio con una lunghezza totale di 2,450 m — Costruzione di una conduttura dalla nuova stazione di pompaggio al pozzo della torre d'acqua di Kosmios, 1,956 m., e una conduttura che collega il serbatoio di Agioi Theodoroi alla rete esistente, 650 m di lunghezza — Costruzione di nuove condutture nella torre d'acqua di Kosmiou per le esigenze del progetto di 140 m di lunghezza. (Italian)
    15 January 2022
    0 references

    Identifiers

    5.001.000
    0 references