Restoration of degraded areas through the establishment of office space and public manufacturing infrastructure (Q3057465): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in it, and other parts: Adding Italian translations)
(‎Changed label, description and/or aliases in es, and other parts: Adding Spanish translations)
label / eslabel / es
 
Restauración de zonas degradadas mediante el establecimiento de espacios de oficinas e infraestructura pública para la producción
Property / summary
 
El objetivo del proyecto es revitalizar el territorio de RSEZ en el Distrito Norte de Rezekne, regenerando la zona degradada, garantizando un crecimiento territorial respetuoso con el medio ambiente y ambientalmente sostenible y creando nuevos puestos de trabajo. En el marco del proyecto se prevé reconstruir el edificio existente en la avenida At Liberation 155A, k-1, espacio de oficinas e edificio industrial con una superficie total de 3 818,8 m². así como en los lados oriental y norte del edificio está previsto construir plazas de asfalto con aparcamientos para coches, que se utilizarán no solo para los coches del callejón 155A de Atbrīvošanas, sino también otros edificios ubicados en las inmediaciones, visitantes, clientes y empleados del edificio. Tras la finalización de los trabajos de construcción, está previsto alquilar el edificio al comerciante o comerciantes, que se seleccionará de acuerdo con el procedimiento de licitación. Como resultado del proyecto, se crearán al menos 50 nuevos puestos de trabajo y se atraerán inversiones no financieras adicionales de 910 759 EUR. La reducción de las zonas degradadas está prevista para un máximo de 2 hectáreas. El grupo destinatario específico del proyecto es el municipio de Rezekne, los operadores económicos y los residentes. El coste total del proyecto es de 1 904 877,89 EUR, incl. 1 652 604,08 EUR costes subvencionables financiados con los siguientes recursos financieros: 910 759 EUR, que representan el 55,11 % del presupuesto total; subvención presupuestaria estatal 61 363,53 EUR (3,71 %); financiación local 184 090,59 EUR (11,14 %); costes privados subvencionables 496 390,97 EUR (30,04 %).La duración de la ejecución del proyecto es de 24 meses. (Spanish)
Property / summary: El objetivo del proyecto es revitalizar el territorio de RSEZ en el Distrito Norte de Rezekne, regenerando la zona degradada, garantizando un crecimiento territorial respetuoso con el medio ambiente y ambientalmente sostenible y creando nuevos puestos de trabajo. En el marco del proyecto se prevé reconstruir el edificio existente en la avenida At Liberation 155A, k-1, espacio de oficinas e edificio industrial con una superficie total de 3 818,8 m². así como en los lados oriental y norte del edificio está previsto construir plazas de asfalto con aparcamientos para coches, que se utilizarán no solo para los coches del callejón 155A de Atbrīvošanas, sino también otros edificios ubicados en las inmediaciones, visitantes, clientes y empleados del edificio. Tras la finalización de los trabajos de construcción, está previsto alquilar el edificio al comerciante o comerciantes, que se seleccionará de acuerdo con el procedimiento de licitación. Como resultado del proyecto, se crearán al menos 50 nuevos puestos de trabajo y se atraerán inversiones no financieras adicionales de 910 759 EUR. La reducción de las zonas degradadas está prevista para un máximo de 2 hectáreas. El grupo destinatario específico del proyecto es el municipio de Rezekne, los operadores económicos y los residentes. El coste total del proyecto es de 1 904 877,89 EUR, incl. 1 652 604,08 EUR costes subvencionables financiados con los siguientes recursos financieros: 910 759 EUR, que representan el 55,11 % del presupuesto total; subvención presupuestaria estatal 61 363,53 EUR (3,71 %); financiación local 184 090,59 EUR (11,14 %); costes privados subvencionables 496 390,97 EUR (30,04 %).La duración de la ejecución del proyecto es de 24 meses. (Spanish) / rank
 
Normal rank
Property / summary: El objetivo del proyecto es revitalizar el territorio de RSEZ en el Distrito Norte de Rezekne, regenerando la zona degradada, garantizando un crecimiento territorial respetuoso con el medio ambiente y ambientalmente sostenible y creando nuevos puestos de trabajo. En el marco del proyecto se prevé reconstruir el edificio existente en la avenida At Liberation 155A, k-1, espacio de oficinas e edificio industrial con una superficie total de 3 818,8 m². así como en los lados oriental y norte del edificio está previsto construir plazas de asfalto con aparcamientos para coches, que se utilizarán no solo para los coches del callejón 155A de Atbrīvošanas, sino también otros edificios ubicados en las inmediaciones, visitantes, clientes y empleados del edificio. Tras la finalización de los trabajos de construcción, está previsto alquilar el edificio al comerciante o comerciantes, que se seleccionará de acuerdo con el procedimiento de licitación. Como resultado del proyecto, se crearán al menos 50 nuevos puestos de trabajo y se atraerán inversiones no financieras adicionales de 910 759 EUR. La reducción de las zonas degradadas está prevista para un máximo de 2 hectáreas. El grupo destinatario específico del proyecto es el municipio de Rezekne, los operadores económicos y los residentes. El coste total del proyecto es de 1 904 877,89 EUR, incl. 1 652 604,08 EUR costes subvencionables financiados con los siguientes recursos financieros: 910 759 EUR, que representan el 55,11 % del presupuesto total; subvención presupuestaria estatal 61 363,53 EUR (3,71 %); financiación local 184 090,59 EUR (11,14 %); costes privados subvencionables 496 390,97 EUR (30,04 %).La duración de la ejecución del proyecto es de 24 meses. (Spanish) / qualifier
 
point in time: 12 January 2022
Timestamp+2022-01-12T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 17:46, 12 January 2022

Project Q3057465 in Latvia
Language Label Description Also known as
English
Restoration of degraded areas through the establishment of office space and public manufacturing infrastructure
Project Q3057465 in Latvia

    Statements

    0 references
    0 references
    882,745.71 Euro
    0 references
    1,601,788.63 Euro
    0 references
    55.11 percent
    0 references
    29 November 2017
    0 references
    28 November 2019
    0 references
    RĒZEKNES PILSĒTAS DOME
    0 references
    0 references

    56°31'43.00"N, 27°20'51.18"E
    0 references
    Projekta mērķis ir Rēzeknes pilsētas Ziemeļu rajona RSEZ teritorijas revitalizācija, reģenerējot degradēto teritoriju, nodrošinot videi draudzīgu un vides ilgtspēju veicinošu teritoriālo izaugsmi un jaunu darba vietu radīšanu.Projekta ietvaros ir plānots pārbūvēt esošo ēku Atbrīvošanas alejā 155A, k-1, par biroju telpu un ražošanas ēku ar kopējo platību – 3818,8 m2, kā arī ēkas austrumu un ziemeļu pusēs paredzēts izbūvēt asfaltētus laukumus ar autostāvvietām vieglajām automašīnām, kas būs izmantojami ne tikai Atbrīvošanas alejas 155A ēkas, bet arī citu ēku, kas atrodas tiešā tuvumā, apmeklētāju, klientu un darbinieku automašīnām. Pēc būvdarbu pabeigšanas, ēku plānots iznomāt komersantam vai komersantiem, kas tiks izvēlēts konkursa kārtībā.Projekta rezultātā, tiks radītas papildus vismaz 50 jaunas darba vietas un papildus piesaistītas nefinanšu investīcijas 910 759 EUR apmērā. Degradēto teritoriju samazinājums plānots līdz 2 ha.Projekta specifiskā mērķa grupa ir Rēzeknes pilsētas pašvaldība, saimnieciskās darbības veicēji un iedzīvotāji.Projekta kopējās izmaksas ir EUR 1 904 877,89, t.sk. EUR 1 652 604,08 attiecināmās izmaksas, kuras tiek finansētas ar sekojošiem finanšu avotiem:ERAF 910 759 EUR, kas sastāda 55,11% no kopējā budžeta;Valsts budžeta dotācija 61 363,53 EUR (3,71%);Pašvaldības finansējums 184 090,59 EUR (11,14%);Privātās attiecināmās izmaksas 496 390,97 EUR (30,04%).Projekta īstenošanas ilgums ir 24 mēneši. (Latvian)
    0 references
    The aim of the project is revitalisation of RSEZ territory of Rezekne city by regenerating degraded territory, ensuring environmentally friendly and environmental sustainability-friendly territorial growth and creation of new jobs.Within the project it is planned to rebuild the existing building in Atbrīvošanas aleja 155A, k-1, as well as office space and production building with total area of 3818.8 m², as well as building on the eastern and northern sides of the building it is planned to build asphalted areas with car parking spaces that will be used for cars, but also 155 buildings for customers, as well as buildings in the vicinity of the customers, as well as on the eastern and northern sides of the building it is planned to build asphalted areas with car parks, which will be used for cars, which will be used not only for customers, but not only for the customers, as well as on the eastern and northern sides of the building is planned to build asphalted areas with car parks, which will be used for cars other than 155 buildings, which are not only accessible to the customers, but also the buildings are located in the vicinity of the building, which will be used for parking cars, which will be used not only for the customers, but also for the buildings in the eastern and northern sides of the building with parking spaces for cars, which will be used for cars, which will be used not only for the customers, but also the buildings near the customer, the buildings in the eastern and northern sides are planned to build asphalted areas with car parking spaces, which will be used for cars, which will be used not only for the customers, but also the buildings are located in the vicinity of the customer, which are not limited to 155 parking spaces, but also the buildings are located in the area of Atbrīvošanas aleja 155A, k-1, which will be used for the total area of 3818.8 m After the completion of the construction works, it is planned to rent the building to a merchant or merchants, who will be selected in a tender procedure.As a result of the project, at least 50 new jobs will be created and additional non-financial investments will be attracted in the amount of EUR 910759. The reduction of degraded areas is planned up to 2 ha.The project specific target group is Rezekne city municipality, economic operators and residents.The total project costs are EUR 1 904 877.89, including. EUR 1 652 604,08 eligible costs financed by the following financial sources:ERDF EUR 910759, which represents 55,11 % of the total budget;State budget grant EUR 61363,53 (3.71 %);Local Government funding EUR 184090.59 (11.14 %);Private eligible costs of EUR 496390.97 (30,04 %).The duration of the project is 24 months. (English)
    15 July 2021
    0 references
    L’objectif du projet est de revitaliser le territoire de RSEZ dans le district nord de Rezekne, en régénérant la zone dégradée, en assurant une croissance territoriale respectueuse de l’environnement et écologiquement durable et en créant de nouveaux emplois. Dans le cadre du projet, il est prévu de reconstruire le bâtiment existant à l’avenue de Libération 155A, k-1, des bureaux et des bâtiments industriels d’une superficie totale de 3 818,8 m², ainsi que sur les côtés est et nord du bâtiment, il est prévu de construire des places asphaltées avec des parkings pour les voitures, qui sera utilisé non seulement pour les voitures de l’allée d’Atbrīvošanas 155A, mais aussi pour d’autres bâtiments situés à proximité immédiate, visiteurs, clients et employés du bâtiment. Après l’achèvement des travaux de construction, il est prévu de louer le bâtiment au ou aux commerçants, qui seront sélectionnés conformément à la procédure d’appel d’offres. À la suite du projet, au moins 50 nouveaux emplois seront créés et des investissements non financiers supplémentaires de 910 759 EUR seront attirés. La réduction des zones dégradées devrait aller jusqu’à 2 ha. Le groupe cible spécifique du projet est la municipalité de Rezekne, les opérateurs économiques et les résidents. Le coût total du projet s’élève à 1 904 877,89 EUR, y compris. 1 652 604,08 EUR coûts éligibles financés par les ressources financières suivantes: 910 759 EUR, soit 55,11 % du budget total;subvention du budget de l’État: 61 363,53 EUR (3,71 %); Financement local 184 090,59 EUR (11,14 %);Coûts éligibles privés: 496 390,97 EUR (30,04 %).La durée de la mise en œuvre du projet est de 24 mois. (French)
    25 November 2021
    0 references
    Ziel des Projekts ist die Wiederbelebung des Territoriums der RSEZ im nördlichen Bezirk Rezekne durch die Sanierung des degradierten Gebiets, die Gewährleistung eines umweltverträglichen und umweltverträglichen territorialen Wachstums und die Schaffung neuer Arbeitsplätze. Im Rahmen des Projekts soll das bestehende Gebäude in der Liberation Avenue 155A, k-1, Bürofläche und Industriegebäude mit einer Gesamtfläche von 3 818,8 m² sowie auf der Ost- und Nordseite des Gebäudes wieder aufgebaut werden. die nicht nur für die Autos der Atbrīvošanas Gasse 155A, sondern auch für andere Gebäude in unmittelbarer Nähe, Besucher, Kunden und Mitarbeiter des Gebäudes verwendet werden. Nach Abschluss der Bauarbeiten ist geplant, das Gebäude an den Kaufmann oder Händler zu vermieten, das nach dem Ausschreibungsverfahren ausgewählt wird. Als Ergebnis des Projekts werden mindestens 50 neue Arbeitsplätze geschaffen und zusätzliche nichtfinanzielle Investitionen in Höhe von 910 759 EUR angezogen. Die Reduzierung der degradierten Flächen soll bis zu 2 ha betragen. Die projektspezifische Zielgruppe ist die Gemeinde Rezekne, Wirtschaftsteilnehmer und Einwohner. Die Gesamtkosten des Projekts betragen 1 904 887,89 EUR, inkl. 180 759 EUR, d. h. 55,11 % des Gesamtbudgets; staatliche Zuschüsse 61 363,53 EUR (3,71 %);Lokale Finanzierung 184 090,59 EUR (11,14 %); private förderfähige Kosten 496 390,97 EUR (30,04 %).Die Laufzeit der Projektdurchführung beträgt 24 Monate. (German)
    28 November 2021
    0 references
    Het doel van het project is om het grondgebied van de RSEZ in het noordelijke district Rezekne nieuw leven in te blazen door het aangetaste gebied te regenereren, milieuvriendelijke en ecologisch duurzame territoriale groei te waarborgen en nieuwe banen te creëren. In het kader van het project is het de bedoeling om het bestaande gebouw in At Liberation avenue 155A, k-1, kantoorruimte en industrieel gebouw met een totale oppervlakte van 3 818,8 m² te herbouwen, evenals aan de oostelijke en noordelijke zijden van het gebouw is het gepland om asfaltpleinen te bouwen met parkeerplaatsen voor auto’s, die zal niet alleen worden gebruikt voor de auto’s van de Atbrīvošanas steeg 155A, maar ook andere gebouwen in de directe omgeving, bezoekers, klanten en medewerkers van het gebouw. Na voltooiing van de bouwwerkzaamheden is het de bedoeling het gebouw te verhuren aan de koopman of kooplieden, die volgens de aanbestedingsprocedure zal worden geselecteerd. Als gevolg van het project zullen ten minste 50 nieuwe banen worden gecreëerd en zullen extra niet-financiële investeringen van 910 759 EUR worden aangetrokken. De vermindering van aangetaste gebieden is gepland tot 2 ha. De projectspecifieke doelgroep is de gemeente Rezekne City, marktdeelnemers en bewoners. De totale kosten van het project bedragen EUR 1 904.877,89, incl. 652 604,08 EUR subsidiabele kosten gefinancierd uit de volgende financiële middelen: 910 759 EUR, ofwel 55,11 % van de totale begroting; subsidie uit de overheidsbegroting 61 363,53 EUR (3,71 %); Lokale financiering 184 090,59 EUR (11,14 %);Private subsidiabele kosten 496 390,97 EUR (30,04 %).De looptijd van de projectuitvoering bedraagt 24 maanden. (Dutch)
    28 November 2021
    0 references
    L'obiettivo del progetto è quello di rivitalizzare il territorio di RSEZ nel distretto settentrionale di Rezekne, rigenerando l'area degradata, garantendo una crescita territoriale rispettosa dell'ambiente e sostenibile e creando nuovi posti di lavoro. Nel quadro del progetto si prevede di ricostruire l'edificio esistente in At Liberation avenue 155A, k-1, uffici e edifici industriali con una superficie totale di 3 818,8 m², così come sui lati orientali e settentrionali dell'edificio si prevede di costruire piazze asfaltate con parcheggi per auto, che saranno utilizzati non solo per le automobili del vicolo Atbrīvošanas 155A, ma anche altri edifici situati nelle immediate vicinanze, visitatori, clienti e dipendenti dell'edificio. Dopo il completamento dei lavori di costruzione, si prevede di affittare l'edificio all'esercente o agli esercenti, che saranno selezionati secondo la procedura di gara. A seguito del progetto, saranno creati almeno 50 nuovi posti di lavoro e saranno attratti ulteriori investimenti non finanziari pari a 910 759 EUR. La riduzione delle aree degradate è prevista per un massimo di 2 ettari. Il gruppo target specifico del progetto è il Comune di Rezekne, gli operatori economici e i residenti. Il costo totale del progetto è di EUR 1.904.877,89, incl. 1 652 604,08 EUR costi ammissibili finanziati dalle seguenti risorse finanziarie: 910 759 EUR, pari al 55,11 % del bilancio totale; sovvenzione statale 61 363,53 EUR (3,71 %); finanziamento locale 184 090,59 EUR (11,14 %); Costi ammissibili privati 496 390,97 EUR (30,04 %).La durata dell'attuazione del progetto è di 24 mesi. (Italian)
    11 January 2022
    0 references
    El objetivo del proyecto es revitalizar el territorio de RSEZ en el Distrito Norte de Rezekne, regenerando la zona degradada, garantizando un crecimiento territorial respetuoso con el medio ambiente y ambientalmente sostenible y creando nuevos puestos de trabajo. En el marco del proyecto se prevé reconstruir el edificio existente en la avenida At Liberation 155A, k-1, espacio de oficinas e edificio industrial con una superficie total de 3 818,8 m². así como en los lados oriental y norte del edificio está previsto construir plazas de asfalto con aparcamientos para coches, que se utilizarán no solo para los coches del callejón 155A de Atbrīvošanas, sino también otros edificios ubicados en las inmediaciones, visitantes, clientes y empleados del edificio. Tras la finalización de los trabajos de construcción, está previsto alquilar el edificio al comerciante o comerciantes, que se seleccionará de acuerdo con el procedimiento de licitación. Como resultado del proyecto, se crearán al menos 50 nuevos puestos de trabajo y se atraerán inversiones no financieras adicionales de 910 759 EUR. La reducción de las zonas degradadas está prevista para un máximo de 2 hectáreas. El grupo destinatario específico del proyecto es el municipio de Rezekne, los operadores económicos y los residentes. El coste total del proyecto es de 1 904 877,89 EUR, incl. 1 652 604,08 EUR costes subvencionables financiados con los siguientes recursos financieros: 910 759 EUR, que representan el 55,11 % del presupuesto total; subvención presupuestaria estatal 61 363,53 EUR (3,71 %); financiación local 184 090,59 EUR (11,14 %); costes privados subvencionables 496 390,97 EUR (30,04 %).La duración de la ejecución del proyecto es de 24 meses. (Spanish)
    12 January 2022
    0 references
    Atbrīvošanas aleja 155A k-1, Rēzekne, LV-4604
    0 references

    Identifiers

    5.6.2.0/17/I/005
    0 references