Reconstruction of main road No 3 (E264) Jõhvi-Tartu-Valga road section garden-Vapramäe-Elva (km 146.6-159.4) (Q3067957): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in nl, and other parts: Adding Dutch translations)
(‎Changed label, description and/or aliases in it, and other parts: Adding Italian translations)
label / itlabel / it
 
Ricostruzione della strada principale n. 3 (E264) Jõhvi-Tartu-Valga tratto strada giardino-Vapramäe-Elva (km 146,6-159.4)
Property / summary
 
Le attività del progetto comprendono: 1. Costruzione di nuovi rivestimenti in calcestruzzo asfalto e ricostruzione di substrati di costruzione stradale secondo progetti tecnici. 2. Ricostruzione delle rampe del viadotto di Kulbilohu e copertura del collettore della sezione Elva-Kulbilohu. 3. Migliorare la gestione del traffico dell'intersezione 7 della sezione (vie aggiuntive, sicurezza e isole separanti, segnaletica orizzontale corrispondente). 4. La costruzione di un tunnel a traffico leggero nel villaggio di Vissi (km 157,2) e la costruzione di un collegamento per pedoni e ciclisti per garantire l'accesso al tipo dalle strade esistenti alle gallerie. 5. Aggiornamento delle fermate degli autobus con due diverse soluzioni (4 tipi — con panca e tasca aperta e 3 altri tipi — padiglione di attesa in tasca aperta) e costruendo percorsi pedonali per collegarli ad un'altra rete stradale. 6. Rinnovo della segnaletica stradale, della segnaletica orizzontale e delle indicazioni per l'intero tratto. 7. Pulizia dei sistemi di drenaggio dell'acqua piovana (compresi i culverti). 8. Costruzione di nuova illuminazione stradale a tutti gli incroci stradali secondo il progetto di illuminazione degli incroci. 9. Adeguamento dei servizi di pubblica utilità secondo un progetto tecnico. (Italian)
Property / summary: Le attività del progetto comprendono: 1. Costruzione di nuovi rivestimenti in calcestruzzo asfalto e ricostruzione di substrati di costruzione stradale secondo progetti tecnici. 2. Ricostruzione delle rampe del viadotto di Kulbilohu e copertura del collettore della sezione Elva-Kulbilohu. 3. Migliorare la gestione del traffico dell'intersezione 7 della sezione (vie aggiuntive, sicurezza e isole separanti, segnaletica orizzontale corrispondente). 4. La costruzione di un tunnel a traffico leggero nel villaggio di Vissi (km 157,2) e la costruzione di un collegamento per pedoni e ciclisti per garantire l'accesso al tipo dalle strade esistenti alle gallerie. 5. Aggiornamento delle fermate degli autobus con due diverse soluzioni (4 tipi — con panca e tasca aperta e 3 altri tipi — padiglione di attesa in tasca aperta) e costruendo percorsi pedonali per collegarli ad un'altra rete stradale. 6. Rinnovo della segnaletica stradale, della segnaletica orizzontale e delle indicazioni per l'intero tratto. 7. Pulizia dei sistemi di drenaggio dell'acqua piovana (compresi i culverti). 8. Costruzione di nuova illuminazione stradale a tutti gli incroci stradali secondo il progetto di illuminazione degli incroci. 9. Adeguamento dei servizi di pubblica utilità secondo un progetto tecnico. (Italian) / rank
 
Normal rank
Property / summary: Le attività del progetto comprendono: 1. Costruzione di nuovi rivestimenti in calcestruzzo asfalto e ricostruzione di substrati di costruzione stradale secondo progetti tecnici. 2. Ricostruzione delle rampe del viadotto di Kulbilohu e copertura del collettore della sezione Elva-Kulbilohu. 3. Migliorare la gestione del traffico dell'intersezione 7 della sezione (vie aggiuntive, sicurezza e isole separanti, segnaletica orizzontale corrispondente). 4. La costruzione di un tunnel a traffico leggero nel villaggio di Vissi (km 157,2) e la costruzione di un collegamento per pedoni e ciclisti per garantire l'accesso al tipo dalle strade esistenti alle gallerie. 5. Aggiornamento delle fermate degli autobus con due diverse soluzioni (4 tipi — con panca e tasca aperta e 3 altri tipi — padiglione di attesa in tasca aperta) e costruendo percorsi pedonali per collegarli ad un'altra rete stradale. 6. Rinnovo della segnaletica stradale, della segnaletica orizzontale e delle indicazioni per l'intero tratto. 7. Pulizia dei sistemi di drenaggio dell'acqua piovana (compresi i culverti). 8. Costruzione di nuova illuminazione stradale a tutti gli incroci stradali secondo il progetto di illuminazione degli incroci. 9. Adeguamento dei servizi di pubblica utilità secondo un progetto tecnico. (Italian) / qualifier
 
point in time: 12 January 2022
Timestamp+2022-01-12T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 15:16, 12 January 2022

Project Q3067957 in Estonia
Language Label Description Also known as
English
Reconstruction of main road No 3 (E264) Jõhvi-Tartu-Valga road section garden-Vapramäe-Elva (km 146.6-159.4)
Project Q3067957 in Estonia

    Statements

    0 references
    5,473,804.96 Euro
    0 references
    6,439,770.54 Euro
    0 references
    85.0 percent
    0 references
    27 April 2015
    0 references
    1 June 2016
    0 references
    Transpordiamet
    0 references
    0 references
    0 references

    59°21'23.40"N, 24°37'49.04"E
    0 references
    10916
    0 references
    Projektitegevused hõlmavad järgmist: 1. Uue asfaltbetoonkatte ehitus ja teekonstruktsiooni aluskihtide rekonstrueerimine vastavalt tehnilistele projektidele. 2. Kulbilohu viadukti rampide ja Elva-Kulbilohu lõigu kogujatee katendi rekonstrueerimine. 3. Lõigule jääva 7 ristmiku liikluskorralduse uuendamine (lisa pöörderajad, ohutus- ja eraldussaared, vastav teetähistus). 4. Kergliiklustunneli rajamine Vissi küla juurde (km 157,2) ja olemasolevatelt teedelt tunnelile liigipääsu tagamiseks ühendustee ehitamine jalakäijatele ja jalgratturitele. 5. Bussipeatuste uuendamine kahe erineva lahendusega (4 esimest tüüpi - pingiga ja avatud taskus ning 3 teist tüüpi - ootepaviljon avatud taskus) ja nende ühendamiseks muu teedevõrguga jalgteede rajamine. 6. Kogu lõigul liiklusmärkide, teekattemärgistuse ja tähispostide uuendamine. 7. Sadevete äravoolusüsteemide (k.a truubid) puhastamine. 8. Kõikide teeületuskohtade juurde uue tänavavalgustuse rajamine vastavalt ristmike valgustuse tööprojektile. 9. Tehnovõrkude ümberpaigaldamine vastavalt tehnilisele projektile. (Estonian)
    0 references
    Project activities include: 1. Construction of new asphalt concrete coating and reconstruction of road construction substrates according to technical projects. 2. Reconstruction of Kulbilohu viaduct ramps and collector cover of Elva-Kulbilohu section. 3. Upgrading the traffic management of the intersection 7 in the section (additional lanes, safety and separating islands, corresponding road marking). 4. The construction of a light traffic tunnel in Vissi village (km 157.2) and the construction of a connection for pedestrians and cyclists to ensure access to the type from existing roads to tunnels. 5. Upgrading bus stops with two different solutions (4 types – with bench and open pocket and 3 other types – waiting pavilion in open pocket) and building footpaths to connect them to another road network. 6. Renewal of road signs, road markings and signposts on the entire section. 7. Cleaning of rainwater drainage systems (including culverts). 8. Construction of new street lighting at all road crossings according to the lighting project of the junctions. 9. Retrofitting of utilities in accordance with a technical project. (English)
    16 August 2021
    0 references
    Les activités du projet comprennent: 1. Construction d’un nouveau revêtement en béton bitumineux et reconstruction de substrats de construction de routes selon des projets techniques. 2. Reconstruction des rampes de viaduc de Kulbilohu et couverture collecteur de la section Elva-Kulbilohu. 3. Amélioration de la gestion du trafic de l’intersection 7 du tronçon (voies supplémentaires, îlots de sécurité et de séparation, marquage routier correspondant). 4. La construction d’un tunnel léger dans le village de Vissi (km 157.2) et la construction d’une connexion pour les piétons et les cyclistes afin d’assurer l’accès au type de route existante aux tunnels. 5. Améliorer les arrêts de bus avec deux solutions différentes (4 types — avec banc et poche ouverte et 3 autres types — pavillon d’attente en poche ouverte) et construire des sentiers pour les relier à un autre réseau routier. 6. Renouvellement de la signalisation routière, des marquages et des panneaux de signalisation sur l’ensemble du tronçon. 7. Nettoyage des systèmes de drainage des eaux de pluie (y compris les ponceaux). 8. Construction d’un nouvel éclairage public à tous les passages à niveau selon le projet d’éclairage des carrefours. 9. Mise à niveau des services publics conformément à un projet technique. (French)
    26 November 2021
    0 references
    Zu den Projektaktivitäten gehören: 1. Bau neuer Asphaltbetonbeschichtung und Rekonstruktion von Straßenbausubstraten nach technischen Projekten. 2. Rekonstruktion von Kulbilohu Viaduktrampen und Kollektorabdeckung des Abschnitts Elva-Kulbilohu. 3. Verbesserung des Verkehrsmanagements des Abschnitts 7 (zusätzliche Fahrspuren, Sicherheits- und Trenninseln, entsprechende Straßenmarkierung). 4. Der Bau eines Ampeltunnels im Dorf Vissi (km 157.2) und der Bau einer Verbindung für Fußgänger und Radfahrer, um den Zugang zum Typ von bestehenden Straßen zu Tunneln zu gewährleisten. 5. Aufrüstung von Bushaltestellen mit zwei verschiedenen Lösungen (4 Typen – mit Bank und offenem Tasche und 3 anderen Typen – warten Pavillon in offener Tasche) und Fußwege zu bauen, um sie mit einem anderen Straßennetz zu verbinden. 6. Erneuerung von Straßenschildern, Straßenmarkierungen und Wegweisern auf dem gesamten Abschnitt. 7. Reinigung der Regenwasserentwässerungssysteme (einschließlich Spulen). 8. Bau einer neuen Straßenbeleuchtung an allen Straßenübergängen nach dem Beleuchtungsprojekt der Kreuzungen. 9. Nachrüstung von Versorgungsunternehmen gemäß einem technischen Projekt. (German)
    30 November 2021
    0 references
    De projectactiviteiten omvatten: 1. Bouw van nieuwe asfaltbetoncoating en reconstructie van wegenbouwsubstraten volgens technische projecten. 2. Reconstructie van Kulbilohu viaduct hellingen en verzamelklep van Elva-Kulbilohu sectie. 3. Verbetering van het verkeersbeheer van het snijpunt 7 van het traject (aanvullende rijstroken, veiligheid en scheiding van eilanden, bijbehorende wegmarkering). 4. De aanleg van een lichte verkeerstunnel in het dorp Vissi (km 157,2) en de aanleg van een aansluiting voor voetgangers en fietsers om de toegang tot het type te waarborgen van bestaande wegen tot tunnels. 5. Upgrade bus stopt met twee verschillende oplossingen (4 types — met bank en open zak en 3 andere types — wachten paviljoen in open zak) en het bouwen van voetpaden om ze te verbinden met een ander wegennet. 6. Vernieuwing van verkeersborden, wegmarkeringen en wegwijzers op het gehele traject. 7. Reiniging van regenwaterafvoersystemen (inclusief duikers). 8. Bouw van nieuwe straatverlichting bij alle oversteekplaatsen volgens het verlichtingsproject van de kruispunten. 9. Aanpassing van nutsvoorzieningen in overeenstemming met een technisch project. (Dutch)
    5 December 2021
    0 references
    Le attività del progetto comprendono: 1. Costruzione di nuovi rivestimenti in calcestruzzo asfalto e ricostruzione di substrati di costruzione stradale secondo progetti tecnici. 2. Ricostruzione delle rampe del viadotto di Kulbilohu e copertura del collettore della sezione Elva-Kulbilohu. 3. Migliorare la gestione del traffico dell'intersezione 7 della sezione (vie aggiuntive, sicurezza e isole separanti, segnaletica orizzontale corrispondente). 4. La costruzione di un tunnel a traffico leggero nel villaggio di Vissi (km 157,2) e la costruzione di un collegamento per pedoni e ciclisti per garantire l'accesso al tipo dalle strade esistenti alle gallerie. 5. Aggiornamento delle fermate degli autobus con due diverse soluzioni (4 tipi — con panca e tasca aperta e 3 altri tipi — padiglione di attesa in tasca aperta) e costruendo percorsi pedonali per collegarli ad un'altra rete stradale. 6. Rinnovo della segnaletica stradale, della segnaletica orizzontale e delle indicazioni per l'intero tratto. 7. Pulizia dei sistemi di drenaggio dell'acqua piovana (compresi i culverti). 8. Costruzione di nuova illuminazione stradale a tutti gli incroci stradali secondo il progetto di illuminazione degli incroci. 9. Adeguamento dei servizi di pubblica utilità secondo un progetto tecnico. (Italian)
    12 January 2022
    0 references

    Identifiers

    2014-2020.10.01.001.01.15-0011
    0 references