Aid for the development of commercial activities through the rehabilitation of public infrastructure for industrial purposes, Phase II (Q3056770): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Created claim: summary (P836): Het doel van het project is om het bedrag van de particuliere investeringen in de regio te verhogen door investeringen te doen voor de ontwikkeling van commerciële activiteiten, in overeenstemming met de economische specialisatie van de gebieden die zijn gedefinieerd in het ontwikkelingsprogramma van de gemeenteraad van Rezekne en op basis van de behoeften van de handelaren. De belangrijkste activiteiten van het project zijn de wederopbouw van d...)
(‎Changed label, description and/or aliases in it, and other parts: Adding Italian translations)
label / itlabel / it
 
Aiuti per lo sviluppo di attività commerciali mediante il ripristino delle infrastrutture pubbliche necessarie per il fabbisogno industriale, fase II
Property / summary
 
L'obiettivo del progetto è quello di aumentare l'importo degli investimenti privati nella regione effettuando investimenti per lo sviluppo di attività commerciali, in conformità con la specializzazione economica dei territori definiti nel programma di sviluppo del consiglio comunale di Rezekne e in base alle esigenze dei commercianti. Le principali attività del progetto sono la ricostruzione della via Komunāls della città di Rezekne in 658 m dalla via Viekas e la sezione 532 m dal vicolo At Liberation al passaggio a livello della ferrovia, la costruzione di reti idriche e fognarie domestiche, nonché la costruzione di un gasdotto (per denaro comunale — costi privati non ammissibili) in questi tratti della strada. Come risultato delle attività previste dal progetto, saranno sostenuti 6 commercianti, 25 nuovi posti di lavoro creati e ulteriori investimenti non finanziari pari a 1 785 360,00 EUR. Il periodo di attuazione del progetto è di 13 mesi. Il costo totale del progetto è di 2 110 106,19 EUR. 1 925 663,74 EUR costi ammissibili, finanziati con le seguenti risorse finanziarie: 1 636 814,18 EUR, che rappresentano l'85 % del bilancio totale; Sovvenzione di bilancio dello Stato EUR 72212,39 (3,75 %); finanziamento locale 216 637,17 EUR (11,25 %). (Italian)
Property / summary: L'obiettivo del progetto è quello di aumentare l'importo degli investimenti privati nella regione effettuando investimenti per lo sviluppo di attività commerciali, in conformità con la specializzazione economica dei territori definiti nel programma di sviluppo del consiglio comunale di Rezekne e in base alle esigenze dei commercianti. Le principali attività del progetto sono la ricostruzione della via Komunāls della città di Rezekne in 658 m dalla via Viekas e la sezione 532 m dal vicolo At Liberation al passaggio a livello della ferrovia, la costruzione di reti idriche e fognarie domestiche, nonché la costruzione di un gasdotto (per denaro comunale — costi privati non ammissibili) in questi tratti della strada. Come risultato delle attività previste dal progetto, saranno sostenuti 6 commercianti, 25 nuovi posti di lavoro creati e ulteriori investimenti non finanziari pari a 1 785 360,00 EUR. Il periodo di attuazione del progetto è di 13 mesi. Il costo totale del progetto è di 2 110 106,19 EUR. 1 925 663,74 EUR costi ammissibili, finanziati con le seguenti risorse finanziarie: 1 636 814,18 EUR, che rappresentano l'85 % del bilancio totale; Sovvenzione di bilancio dello Stato EUR 72212,39 (3,75 %); finanziamento locale 216 637,17 EUR (11,25 %). (Italian) / rank
 
Normal rank
Property / summary: L'obiettivo del progetto è quello di aumentare l'importo degli investimenti privati nella regione effettuando investimenti per lo sviluppo di attività commerciali, in conformità con la specializzazione economica dei territori definiti nel programma di sviluppo del consiglio comunale di Rezekne e in base alle esigenze dei commercianti. Le principali attività del progetto sono la ricostruzione della via Komunāls della città di Rezekne in 658 m dalla via Viekas e la sezione 532 m dal vicolo At Liberation al passaggio a livello della ferrovia, la costruzione di reti idriche e fognarie domestiche, nonché la costruzione di un gasdotto (per denaro comunale — costi privati non ammissibili) in questi tratti della strada. Come risultato delle attività previste dal progetto, saranno sostenuti 6 commercianti, 25 nuovi posti di lavoro creati e ulteriori investimenti non finanziari pari a 1 785 360,00 EUR. Il periodo di attuazione del progetto è di 13 mesi. Il costo totale del progetto è di 2 110 106,19 EUR. 1 925 663,74 EUR costi ammissibili, finanziati con le seguenti risorse finanziarie: 1 636 814,18 EUR, che rappresentano l'85 % del bilancio totale; Sovvenzione di bilancio dello Stato EUR 72212,39 (3,75 %); finanziamento locale 216 637,17 EUR (11,25 %). (Italian) / qualifier
 
point in time: 11 January 2022
Timestamp+2022-01-11T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 10:08, 11 January 2022

Project Q3056770 in Latvia
Language Label Description Also known as
English
Aid for the development of commercial activities through the rehabilitation of public infrastructure for industrial purposes, Phase II
Project Q3056770 in Latvia

    Statements

    0 references
    0 references
    1,216,587.46 Euro
    0 references
    1,431,279.36 Euro
    0 references
    85.0 percent
    0 references
    16 November 2017
    0 references
    15 December 2018
    0 references
    RĒZEKNES PILSĒTAS DOME
    0 references
    0 references

    56°31'30.94"N, 27°19'44.80"E
    0 references
    Projekta mērķis ir palielināt privāto investīciju apjomu reģionā, veicot ieguldījumus komercdarbības attīstībai, atbilstoši Rēzeknes pilsētas domes attīstības programmā noteiktajai teritoriju ekonomiskajai specializācijai un balstoties uz komersantu vajadzībām.Projekta galvenās darbības ir Rēzeknes pilsētas Komunālās ielas pārbūve 658 m posmā no Viļakas ielas un 532 m posmā no Atbrīvošanas alejas līdz dzelzceļa pārbrauktuvei, ūdensapgādes un sadzīves kanalizācijas tīklu izbūve, kā arī gāzes vada izbūve (par pašvaldības naudu-privātās neattiecināmas izmaksas) šajos ielas posmos. Projektā plānoto darbību rezultātā tiks atbalstīti 6 komersanti, radītas 25 jaunas darba vietas un piesaistītas papildus nefinanšu investīcijas 1 785 360.00 EUR apmērā.Projekta īstenošanas laiks ir 13 mēneši.Projekta kopējās izmaksas ir 2 110 106.19 EUR t.sk. 1 925 663.74 EUR attiecināmās izmaksas, kuras tiek finansētas ar sekojošiem finanšu avotiem:ERAF 1 636 814.18 EUR, kas sastāda 85% no kopējā budžeta; Valsts budžeta dotācija 72 212.39 EUR (3,75%);Pašvaldības finansējums 216 637.17 EUR (11,25%). (Latvian)
    0 references
    The aim of the project is to increase the amount of private investments in the region by investing for commercial development, in accordance with the economic specialisation of the territories defined in Rezekne City Council development programme and based on the needs of merchants.The main activities of the project are the reconstruction of Rēzekne City Komunāls Street in the 658 m section from Viļakas Street and 532 m section from the Liberation avenue to the railway crossing, construction of water supply and household sewerage networks, as well as construction of gas pipelines (for municipal money-ineligible street costs). The project’s planned activities will support 6 merchants, create 25 new jobs and attract additional non-financial investments in the amount of EUR 1785360.00.The project implementation period is 13 months.The total project costs are EUR 2110106.19 incl. EUR 1925663.74 eligible costs, which are financed by the following financial sources:ERDF EUR 1636814.18, which represents 85 % of the total budget; State budget grant EUR 72212.39 (3.75 %); Local Government funding EUR 216637.17 (11.25 %). (English)
    15 July 2021
    0 references
    L’objectif du projet est d’augmenter le montant des investissements privés dans la région en investissant pour le développement des activités commerciales, conformément à la spécialisation économique des territoires définis dans le programme de développement du conseil municipal de Rezekne et sur la base des besoins des commerçants. Les principales activités du projet sont la reconstruction de la rue Komunāls de la ville de Rezekne en 658 m de la rue Vi’akas et la section de 532 m de l’allée de libération jusqu’au passage à niveau du chemin de fer, la construction de réseaux d’approvisionnement en eau et d’assainissement ménager, ainsi que la construction d’un gazoduc (pour l’argent municipal — coûts inéligibles privés) dans ces tronçons de la rue. À la suite des activités prévues du projet, 6 commerçants seront soutenus, 25 nouveaux emplois créés et des investissements non financiers supplémentaires de 1 785 360,00 EUR sont attirés.La période de mise en œuvre du projet est de 13 mois.Le coût total du projet s’élève à 2 110 106,19 EUR. 1 925 663,74 EUR coûts éligibles, qui sont financés par les ressources financières suivantes: 1 636 814,18 EUR, soit 85 % du budget total; Subvention budgétaire de l’État 72 212,39 EUR (3,75 %); financement local 216 637,17 EUR (11,25 %). (French)
    25 November 2021
    0 references
    Ziel des Projekts ist es, die Höhe der privaten Investitionen in der Region zu erhöhen, indem Investitionen in die Entwicklung kommerzieller Aktivitäten getätigt werden, entsprechend der wirtschaftlichen Spezialisierung der im Entwicklungsprogramm des Stadtrats von Rezekne definierten Gebiete und auf der Grundlage der Bedürfnisse der Händler. Die Hauptaktivitäten des Projekts sind der Wiederaufbau der Rezekne City Komunāls Straße in 658 m Abschnitt von der Vi-akas-Straße und der 532 m Abschnitt von der At Liberation Allee bis zur Bahnüberquerung, dem Bau von Wasserversorgungs- und Haushaltskanalnetzen sowie dem Bau einer Gaspipeline (für kommunale Gelder – private nicht zuschussfähige Kosten) in diesen Straßenabschnitten. Als Ergebnis der geplanten Aktivitäten des Projekts werden 6 Händler unterstützt, 25 neue Arbeitsplätze geschaffen und zusätzliche nichtfinanzielle Investitionen in Höhe von 1 785 360,00 EUR angezogen.Die Projektdurchführungsfrist beträgt 13 Monate.Die Gesamtkosten des Projekts betragen 2 110 106,19 EUR. 1 925 663,74 EUR zuschussfähige Kosten, die aus folgenden Finanzmitteln finanziert werden: 1 636 814,18 EUR, was 85 % des Gesamtbudgets entspricht; Staatliche Zuschüsse in Höhe von 72 212,39 EUR (3,75 %);Lokale Finanzierungen 216 637,17 EUR (11,25 %). (German)
    28 November 2021
    0 references
    Het doel van het project is om het bedrag van de particuliere investeringen in de regio te verhogen door investeringen te doen voor de ontwikkeling van commerciële activiteiten, in overeenstemming met de economische specialisatie van de gebieden die zijn gedefinieerd in het ontwikkelingsprogramma van de gemeenteraad van Rezekne en op basis van de behoeften van de handelaren. De belangrijkste activiteiten van het project zijn de wederopbouw van de straat Rezekne City Komunāls in 658 m van Vi-akas-straat en het 532 m-gedeelte van de steeg At Liberation tot het niveau van de spoorwegovergang, de aanleg van watervoorziening en huishoudelijke rioleringsnetwerken, alsmede de aanleg van een gaspijpleiding (voor gemeentegeld — particuliere niet-subsidiabele kosten) in deze gedeelten van de straat. Als gevolg van de geplande activiteiten van het project zullen 6 handelaren worden ondersteund, 25 nieuwe banen worden gecreëerd en extra niet-financiële investeringen van 1 785 360,00 EUR worden aangetrokken.De uitvoeringsperiode van het project bedraagt 13 maanden. De totale kosten van het project bedragen 2 110 106,19 EUR. 1 925 663,74 EUR aan subsidiabele kosten, die uit de volgende financiële middelen worden gefinancierd: 1 636 814,18 EUR, hetgeen 85 % van de totale begroting uitmaakt; Subsidie uit de overheidsbegroting 722 212,39 EUR (3,75 %); Lokale financiering 216 637,17 EUR (11,25 %). (Dutch)
    28 November 2021
    0 references
    L'obiettivo del progetto è quello di aumentare l'importo degli investimenti privati nella regione effettuando investimenti per lo sviluppo di attività commerciali, in conformità con la specializzazione economica dei territori definiti nel programma di sviluppo del consiglio comunale di Rezekne e in base alle esigenze dei commercianti. Le principali attività del progetto sono la ricostruzione della via Komunāls della città di Rezekne in 658 m dalla via Viekas e la sezione 532 m dal vicolo At Liberation al passaggio a livello della ferrovia, la costruzione di reti idriche e fognarie domestiche, nonché la costruzione di un gasdotto (per denaro comunale — costi privati non ammissibili) in questi tratti della strada. Come risultato delle attività previste dal progetto, saranno sostenuti 6 commercianti, 25 nuovi posti di lavoro creati e ulteriori investimenti non finanziari pari a 1 785 360,00 EUR. Il periodo di attuazione del progetto è di 13 mesi. Il costo totale del progetto è di 2 110 106,19 EUR. 1 925 663,74 EUR costi ammissibili, finanziati con le seguenti risorse finanziarie: 1 636 814,18 EUR, che rappresentano l'85 % del bilancio totale; Sovvenzione di bilancio dello Stato EUR 72212,39 (3,75 %); finanziamento locale 216 637,17 EUR (11,25 %). (Italian)
    11 January 2022
    0 references
    Komunālā iela, Rēzekne
    0 references
    Komunālā iela, Rēzekne
    0 references

    Identifiers

    3.3.1.0/17/I/005
    0 references