Implementation of Energy Efficiency Improvement Measures for Daugava Stadium Stadium Building Augssels 1, Riga (Q3057045): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Created claim: summary (P836): Doel van het project: Verbetering van de energie-efficiëntie van het gebouw in Upper Street 1, Riga door isolatie van de buitenmuren en afdelingen van het gebouw, vervanging van bestaande ramen, installatie van een nieuw klimaatbeheersingssysteem en de oprichting van een verwarmingssysteem, waardoor de verbetering van de thermische technische prestaties wordt verbeterd, waardoor het warmteverlies van het gebouw wordt verminderd. Bestaande verlic...)
(‎Changed label, description and/or aliases in it, and other parts: Adding Italian translations)
label / itlabel / it
 
Attuazione di misure di miglioramento dell'efficienza energetica per l'edificio dello stadio Daugava ad Augšiel 1, Riga
Property / summary
 
Obiettivo del progetto: Miglioramento dell'efficienza energetica dell'edificio in Upper Street 1, Riga mediante l'isolamento delle pareti esterne e delle divisioni dell'edificio, la sostituzione delle finestre esistenti, l'installazione di un nuovo sistema di controllo del clima e la creazione di un sistema di riscaldamento, migliorando così il miglioramento delle prestazioni tecniche termiche, riducendo la dispersione di calore dell'edificio. Sostituire l'illuminazione esistente nei locali con un'illuminazione efficiente sotto il profilo energetico, riducendo così il consumo energetico. Al fine di garantire il conseguimento dell'obiettivo specifico di cui al regolamento n. 13 del Consiglio del 4 gennaio 2018 "Promuovere l'attuazione del secondo ciclo di applicazioni progettuali del programma operativo"Crescita e occupazione"Obiettivo di sostegno specifico 4.2.1"Promuovere il miglioramento dell'efficienza energetica negli edifici statali e residenziali", VISA"Cultura e Sport "Stadio Daugavas" prevede di realizzare i seguenti lavori di costruzione:- isolamento delle pareti esterne dell'edificio;- isolamento delle divisioni;- sostituzione di finestre esistenti;- sostituzione di vecchi nodi d'ingresso;- installazione di un nuovo impianto di climatizzazione;- sostituzione dell'illuminazione esistente;- isolamento del pavimento;- creazione di un nuovo impianto di riscaldamento nell'edificio.Le attività previste nell'ambito del progetto sono direttamente finalizzate al raggiungimento dell'obiettivo, aumentando così la longevità dell'edificio e la vita dell'edificio.Il sito di realizzazione del progetto: High Street 1, Riga.Durata del progetto: tre mesi dalla conclusione del contratto di progetto. Le attività relative alla preparazione della domanda di progetto sono state avviate nel secondo trimestre del 2017, quando sono stati effettuati il parere dell'ispezione tecnica dell'edificio e l'audit energetico.I costi totali ammissibili del progetto ammontano a 1 047 200,00 EUR, compreso il finanziamento del Fondo europeo di sviluppo regionale — 890 120,00 EUR;- il finanziamento del bilancio statale ammissibile — 157 080,00 EUR.Risultati programmati: — il risparmio di energia termica dopo l'attuazione del progetto non sarà inferiore al 44,24 % all'anno del consumo di calore calcolato nel certificato energetico dell'edificio prima della realizzazione del progetto;- il consumo di energia termica per il riscaldamento dopo l'attuazione del progetto, basato sui calcoli effettuati nel certificato energetico dell'edificio e sui lavori di costruzione previsti nella documentazione tecnica del progetto, non supererà 49,58 kWh/m² all'anno; — riduzione del consumo annuo di energia primaria — 428,14 MWh/anno;- riduzione calcolata dei gas a effetto serra di 90,75 tonnellate di CO2 equivalente all'anno. (Italian)
Property / summary: Obiettivo del progetto: Miglioramento dell'efficienza energetica dell'edificio in Upper Street 1, Riga mediante l'isolamento delle pareti esterne e delle divisioni dell'edificio, la sostituzione delle finestre esistenti, l'installazione di un nuovo sistema di controllo del clima e la creazione di un sistema di riscaldamento, migliorando così il miglioramento delle prestazioni tecniche termiche, riducendo la dispersione di calore dell'edificio. Sostituire l'illuminazione esistente nei locali con un'illuminazione efficiente sotto il profilo energetico, riducendo così il consumo energetico. Al fine di garantire il conseguimento dell'obiettivo specifico di cui al regolamento n. 13 del Consiglio del 4 gennaio 2018 "Promuovere l'attuazione del secondo ciclo di applicazioni progettuali del programma operativo"Crescita e occupazione"Obiettivo di sostegno specifico 4.2.1"Promuovere il miglioramento dell'efficienza energetica negli edifici statali e residenziali", VISA"Cultura e Sport "Stadio Daugavas" prevede di realizzare i seguenti lavori di costruzione:- isolamento delle pareti esterne dell'edificio;- isolamento delle divisioni;- sostituzione di finestre esistenti;- sostituzione di vecchi nodi d'ingresso;- installazione di un nuovo impianto di climatizzazione;- sostituzione dell'illuminazione esistente;- isolamento del pavimento;- creazione di un nuovo impianto di riscaldamento nell'edificio.Le attività previste nell'ambito del progetto sono direttamente finalizzate al raggiungimento dell'obiettivo, aumentando così la longevità dell'edificio e la vita dell'edificio.Il sito di realizzazione del progetto: High Street 1, Riga.Durata del progetto: tre mesi dalla conclusione del contratto di progetto. Le attività relative alla preparazione della domanda di progetto sono state avviate nel secondo trimestre del 2017, quando sono stati effettuati il parere dell'ispezione tecnica dell'edificio e l'audit energetico.I costi totali ammissibili del progetto ammontano a 1 047 200,00 EUR, compreso il finanziamento del Fondo europeo di sviluppo regionale — 890 120,00 EUR;- il finanziamento del bilancio statale ammissibile — 157 080,00 EUR.Risultati programmati: — il risparmio di energia termica dopo l'attuazione del progetto non sarà inferiore al 44,24 % all'anno del consumo di calore calcolato nel certificato energetico dell'edificio prima della realizzazione del progetto;- il consumo di energia termica per il riscaldamento dopo l'attuazione del progetto, basato sui calcoli effettuati nel certificato energetico dell'edificio e sui lavori di costruzione previsti nella documentazione tecnica del progetto, non supererà 49,58 kWh/m² all'anno; — riduzione del consumo annuo di energia primaria — 428,14 MWh/anno;- riduzione calcolata dei gas a effetto serra di 90,75 tonnellate di CO2 equivalente all'anno. (Italian) / rank
 
Normal rank
Property / summary: Obiettivo del progetto: Miglioramento dell'efficienza energetica dell'edificio in Upper Street 1, Riga mediante l'isolamento delle pareti esterne e delle divisioni dell'edificio, la sostituzione delle finestre esistenti, l'installazione di un nuovo sistema di controllo del clima e la creazione di un sistema di riscaldamento, migliorando così il miglioramento delle prestazioni tecniche termiche, riducendo la dispersione di calore dell'edificio. Sostituire l'illuminazione esistente nei locali con un'illuminazione efficiente sotto il profilo energetico, riducendo così il consumo energetico. Al fine di garantire il conseguimento dell'obiettivo specifico di cui al regolamento n. 13 del Consiglio del 4 gennaio 2018 "Promuovere l'attuazione del secondo ciclo di applicazioni progettuali del programma operativo"Crescita e occupazione"Obiettivo di sostegno specifico 4.2.1"Promuovere il miglioramento dell'efficienza energetica negli edifici statali e residenziali", VISA"Cultura e Sport "Stadio Daugavas" prevede di realizzare i seguenti lavori di costruzione:- isolamento delle pareti esterne dell'edificio;- isolamento delle divisioni;- sostituzione di finestre esistenti;- sostituzione di vecchi nodi d'ingresso;- installazione di un nuovo impianto di climatizzazione;- sostituzione dell'illuminazione esistente;- isolamento del pavimento;- creazione di un nuovo impianto di riscaldamento nell'edificio.Le attività previste nell'ambito del progetto sono direttamente finalizzate al raggiungimento dell'obiettivo, aumentando così la longevità dell'edificio e la vita dell'edificio.Il sito di realizzazione del progetto: High Street 1, Riga.Durata del progetto: tre mesi dalla conclusione del contratto di progetto. Le attività relative alla preparazione della domanda di progetto sono state avviate nel secondo trimestre del 2017, quando sono stati effettuati il parere dell'ispezione tecnica dell'edificio e l'audit energetico.I costi totali ammissibili del progetto ammontano a 1 047 200,00 EUR, compreso il finanziamento del Fondo europeo di sviluppo regionale — 890 120,00 EUR;- il finanziamento del bilancio statale ammissibile — 157 080,00 EUR.Risultati programmati: — il risparmio di energia termica dopo l'attuazione del progetto non sarà inferiore al 44,24 % all'anno del consumo di calore calcolato nel certificato energetico dell'edificio prima della realizzazione del progetto;- il consumo di energia termica per il riscaldamento dopo l'attuazione del progetto, basato sui calcoli effettuati nel certificato energetico dell'edificio e sui lavori di costruzione previsti nella documentazione tecnica del progetto, non supererà 49,58 kWh/m² all'anno; — riduzione del consumo annuo di energia primaria — 428,14 MWh/anno;- riduzione calcolata dei gas a effetto serra di 90,75 tonnellate di CO2 equivalente all'anno. (Italian) / qualifier
 
point in time: 11 January 2022
Timestamp+2022-01-11T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 10:08, 11 January 2022

Project Q3057045 in Latvia
Language Label Description Also known as
English
Implementation of Energy Efficiency Improvement Measures for Daugava Stadium Stadium Building Augssels 1, Riga
Project Q3057045 in Latvia

    Statements

    0 references
    0 references
    890,120.0 Euro
    0 references
    1,047,200.0 Euro
    0 references
    85.0 percent
    0 references
    5 February 2021
    0 references
    4 May 2021
    0 references
    Valsts sabiedrība ar ierobežotu atbildību "Kultūras un sporta centrs "Daugavas stadions""
    0 references
    0 references

    56°57'16.96"N, 24°9'21.82"E
    0 references
    Projekta mērķis: VSIA "Kultūras un sporta centrs "Daugavas stadions"" ēkai Augšielā 1, Rīgā energoefektivitātes paaugstināšana, nodrošinot ēkas ārsienu un pārsegumu siltināšanu, esošo logu nomaiņa, jaunas klimata kontroles sistēmas ierīkošana un apkures sistēmas izveide, tādējādi uzlabojot siltumtehnisko rādītāju uzlabošanos, samazinot ēkas siltumu zudumus. Esošā apgaismojuma nomaiņa telpās pret energoefektīvu apgaismojumu, tādējādi samazinot enerģijas patēriņu. Lai nodrošinātu 2018.gada 4.janvāra Ministru kabineta noteikumos Nr.13 "Darbības programmas "Izaugsme un nodarbinātība" 4.2.1. specifiskā atbalsta mērķa "Veicināt energoefektivitātes paaugstināšanu valsts un dzīvojamās ēkās" 4.2.1.2. pasākuma "Veicināt energoefektivitātes paaugstināšanu valsts ēkās" otrās projektu iesniegumu atlases kārtas īstenošanas noteikumi" noteiktā specifiskā mērķa sasniegšanu, VISA "Kultūras un sporta centrs "Daugavas stadions"" plāno veikt šādus būvdarbus:- ēkas ārsienu siltināšana;- pārsegumu siltināšana;- esošo logu nomaiņa;- veco ieejas mezglu nomaiņa;- jaunas klimata kontroles sistēmas ierīkošana;- esošā apgaismojuma nomaiņa;- grīdas siltināšana;- jaunas apkures sistēmas izveide ēkā.Projekta ietvaros plānotās darbības ir tieši vērstas uz mērķa sasniegšanu, tādējādi palielinot ēkas ilgmūžību un ēkas ekspluatācijas laiku.Projekta īstenošanas vieta: Augšielā 1, Rīgā.Projekta ilgums: trīs mēneši no projekta līguma noslēgšanas. Ar projekta iesnieguma sagatavošanu saistītās darbības uzsāktas 2017.gada 2.ceturksni, kad tika veikts ēkas tehniskās apsekošanas atzinums un energoaudits.Projekta kopējās attiecināmās izmaksas ir 1 047 200,00 EUR, t.sk.- Eiropas Reģionālās attīstības fonda finansējums - 890 120,00 EUR;- attiecināmais valsts budžeta finansējums - 157 080,00 EUR.Plānotie rezultāti: - siltumenerģijas ietaupījums pēc projekta īstenošanas būs ne mazāks kā 44,24% gadā no ēkas energosertifikātā aprēķinātā siltumenerģijas patēriņa pirms projekta īstenošanas;- siltumenerģijas patēriņš apkurei pēc projekta īstenošanas, pamatojoties uz ēkas energosertifikātā veiktajiem aprēķiniem un projekta tehniskajā dokumentācijā paredzētajiem būvdarbiem nepārsniegs 49,58 kWh/m2 gadā; - primārās enerģijas gada patēriņa samazinājums - 428,14 MWh/gadā;- aprēķinātais siltumnīcefekta gāzu samazinājums - 90,75 CO2 ekvivalenta tonnas gadā. (Latvian)
    0 references
    The aim of the project shall be: Improvement of energy efficiency of the building "Culture and sports centre "Daugavas Stadium" in Augshiel 1, Riga, ensuring insulation of exterior walls and divisions of the building, replacement of existing windows, installation of a new climate control system and creation of a heating system, thus improving the improvement of thermal performance and reducing heat losses of the building. Replacing existing indoor lighting with energy-efficient lighting, thereby reducing energy consumption. In order to ensure the achievement of specific objective of 4.2.1 of the specific support objective “To promote energy efficiency in public and residential buildings” of the Regulations of the Cabinet of Ministers of 4 January 2018 No.13 “To promote energy efficiency in public buildings” 4.2.1.2 “Promotion of energy efficiency improvement in public buildings” implementing rules of the second project application set out in the second project programme “To promote energy efficiency in public buildings” to achieve the specific objective of VISA “Cultural and Sports Centre”Daugava Stadium“” is planned to perform the following construction works:- building external wall insulation and implementation of the building-design-provision-existence-existence; changing of the existing heating system in the framework of the new building. Upchilles 1, Riga. Duration of the project: Three months from the conclusion of the project contract. The project’s total eligible costs are EUR 1047200,00, incl. – European Regional Development Fund funding – EUR 890120,00; – eligible state budget funding – EUR 157080,00.Project’s total eligible costs are EUR 1047200,00, incl. – European Regional Development Fund funding – EUR 890120,00; – eligible state budget funding – EUR 157080,00. — the heat savings after project implementation will not be less than 44.24 % of the annual heat consumption calculated in the energy certificate of the building before the project implementation;- heat consumption for heating after project implementation, based on the calculations in the energy certificate of the building and construction works foreseen in the technical design documentation, will not exceed 49,58 kWh/m² per year; A reduction in annual primary energy consumption of 428,14 MWh/year;- the estimated greenhouse gas reduction of 90.75 CO2 equivalent tons per year. (English)
    15 July 2021
    0 references
    Objectif du projet: Amélioration de l’efficacité énergétique du bâtiment dans la rue supérieure 1, Riga en assurant l’isolation des murs extérieurs et des divisions du bâtiment, le remplacement des fenêtres existantes, l’installation d’un nouveau système de contrôle du climat et la création d’un système de chauffage, améliorant ainsi l’amélioration des performances techniques thermiques, réduisant la perte de chaleur du bâtiment. Remplacer l’éclairage existant dans les locaux par un éclairage économe en énergie, réduisant ainsi la consommation d’énergie. Afin d’assurer la réalisation de l’objectif spécifique énoncé dans le règlement no 13 du Conseil des ministres du 4 janvier 2018 «Promouvoir la mise en œuvre de la deuxième série d’applications de projets du programme opérationnel»Croissance et emploi«objectif d’appui spécifique 4.2.1»Promouvoir l’amélioration de l’efficacité énergétique dans les bâtiments d’État et les bâtiments résidentiels«, VISA»Centre Culture et Sport «Daugavas Stadium» prévoit d’effectuer les travaux de construction suivants:- isolation des murs extérieurs du bâtiment;- isolation des divisions;- remplacement des fenêtres existantes;- remplacement des anciens nœuds d’entrée;- installation d’un nouveau système de climatisation;- remplacement de l’éclairage existant;- isolation des planchers;- création d’un nouveau système de chauffage dans le bâtiment.Les activités prévues dans le projet visent directement à atteindre l’objectif, augmentant ainsi la longévité du bâtiment et la durée de vie du bâtiment.Le site de mise en œuvre du projet: Upper Street 1, Riga.Durée du projet: trois mois à compter de la conclusion du contrat de projet. Les activités liées à la préparation de la demande de projet ont été lancées au deuxième trimestre 2017, lorsque l’avis de l’inspection technique du bâtiment et de l’audit énergétique a été réalisé.Le total des coûts éligibles du projet s’élève à 1 047 200,00 EUR, y compris le financement du Fonds européen de développement régional — 890 120,00 EUR;- le financement éligible du budget de l’État — 157 080,00 EUR.Résultats prévus: — les économies d’énergie thermique après la mise en œuvre du projet ne seront pas inférieures à 44,24 % par an de la consommation de chaleur calculée dans le certificat énergétique du bâtiment avant la réalisation du projet;- la consommation d’énergie thermique pour le chauffage après la mise en œuvre du projet, sur la base des calculs effectués dans le certificat énergétique du bâtiment et des travaux de construction prévus dans la documentation technique du projet, ne dépassera pas 49,58 kWh/m² par an; — réduction de la consommation annuelle d’énergie primaire — 428,14 MWh/an;- réduction calculée des gaz à effet de serre de 90,75 tonnes d’équivalent CO2 par an. (French)
    25 November 2021
    0 references
    Ziel des Projekts: Verbesserung der Energieeffizienz des Gebäudes in der oberen Straße 1, Riga durch die Isolierung der Außenwände und Trennwände des Gebäudes, den Austausch bestehender Fenster, die Installation eines neuen Klimaleitsystems und die Schaffung eines Heizsystems, wodurch die Verbesserung der thermischen technischen Leistung verbessert wird, wodurch der Wärmeverlust des Gebäudes verringert wird. Bestehende Beleuchtung in Räumen durch energieeffiziente Beleuchtung zu ersetzen und so den Energieverbrauch zu senken. Um die Verwirklichung des spezifischen Ziels zu gewährleisten, das in der Kabinettsverordnung Nr. 13 vom 4. Januar 2018 „Förderung der Durchführung der zweiten Runde von Projektanträgen des operationellen Programms“Wachstum und Beschäftigung„spezifisches Unterstützungsziel 4.2.1“Förderung der Verbesserung der Energieeffizienz in Staats- und Wohngebäuden„festgelegt ist, plant VISA“Kultur- und Sportzentrum „Daugavas-Stadion“ folgende Bauarbeiten durchzuführen:- Isolierung der Außenwände des Gebäudes;- Isolierung von Abteilungen;- Ersatz vorhandener Fenster;- Ersatz alter Eingangsknoten;- Installation eines neuen Klimaleitsystems;- Ersatz vorhandener Beleuchtung;- Bodenisolierung;- Schaffung einer neuen Heizanlage im Gebäude.Die im Rahmen des Projekts geplanten Aktivitäten zielen direkt darauf ab, das Ziel zu erreichen, wodurch die Langlebigkeit des Gebäudes und die Lebensdauer des Gebäudes erhöht werden.Die Projektdurchführungsstätte: Upper Street 1, Riga.Projektdauer: drei Monate nach Abschluss des Projektvertrags. Die Tätigkeiten im Zusammenhang mit der Vorbereitung des Projektantrags wurden im zweiten Quartal 2017 aufgenommen, als die Stellungnahme der technischen Kontrolle des Gebäudes und des Energieaudits durchgeführt wurde.Die gesamten förderfähigen Kosten des Projekts betragen 1 047 200,00 EUR, einschließlich der Finanzierung des Europäischen Fonds für regionale Entwicklung – 890 120,00 EUR;- die förderfähige Finanzierung des Staatshaushalts – 157 080,00 EUR.Ergebnisse: — die thermischen Energieeinsparungen nach Durchführung des Projekts betragen nicht weniger als 44,24 % des im Energieausweis des Gebäudes vor der Projektdurchführung berechneten Wärmeverbrauchs;- der Wärmeenergieverbrauch für Heizung nach Projektdurchführung auf der Grundlage der Berechnungen im Energieausweis des Gebäudes und der in der technischen Dokumentation des Projekts vorgesehenen Bauarbeiten darf 49,58 kWh/m² pro Jahr nicht überschreiten; — Verringerung des jährlichen Primärenergieverbrauchs – 428,14 MWh/Jahr;- berechnete Verringerung der Treibhausgasemissionen um 90,75 Tonnen CO2-Äquivalent pro Jahr. (German)
    28 November 2021
    0 references
    Doel van het project: Verbetering van de energie-efficiëntie van het gebouw in Upper Street 1, Riga door isolatie van de buitenmuren en afdelingen van het gebouw, vervanging van bestaande ramen, installatie van een nieuw klimaatbeheersingssysteem en de oprichting van een verwarmingssysteem, waardoor de verbetering van de thermische technische prestaties wordt verbeterd, waardoor het warmteverlies van het gebouw wordt verminderd. Bestaande verlichting in kamers vervangen door energiezuinige verlichting, waardoor het energieverbruik wordt verminderd. Met het oog op de verwezenlijking van de specifieke doelstelling van kabinetsverordening nr. 13 van 4 januari 2018 „Bevordering van de uitvoering van de tweede ronde van projectaanvragen van het operationele programma”Groei en werkgelegenheid„, specifieke steundoelstelling 4.2.1”Bevordering van de verbetering van de energie-efficiëntie in staats- en woongebouwen„, is VISA”Cultuur- en sportcentrum „Daugavas Stadium” van plan de volgende bouwwerkzaamheden uit te voeren:- isolatie van buitenmuren van het gebouw;- isolatie van divisies;- vervanging van bestaande ramen;- vervanging van oude entreeknooppunten;- installatie van een nieuw klimaatbeheersingssysteem;- vervanging van bestaande verlichting;- vloerisolatie;- creatie van een nieuw verwarmingssysteem in het gebouw.De geplande activiteiten binnen het project zijn direct gericht op het bereiken van het doel, waardoor de levensduur van het gebouw en de levensduur van het gebouw worden vergroot.De projectuitvoeringslocatie: Bovenstraat 1, Riga.Projectduur: drie maanden na de sluiting van het projectcontract. De activiteiten in verband met de voorbereiding van de projectaanvraag werden gestart in het tweede kwartaal van 2017, toen het advies van de technische inspectie van het gebouw en de energieaudit werden uitgevoerd.De totale subsidiabele kosten van het project bedragen 1 047 200,00 EUR, inclusief financiering uit het Europees Fonds voor Regionale Ontwikkeling — 890120,00; EUR — de subsidiabele financiering uit de overheidsbegroting — 157 080,00 EUR.Geplande resultaten: — de thermische energiebesparingen na de uitvoering van het project zullen niet minder bedragen dan 44,24 % per jaar van het warmteverbruik berekend in het energiecertificaat van het gebouw voorafgaand aan de uitvoering van het project;- het thermische energieverbruik voor verwarming na de uitvoering van het project, op basis van de berekeningen in het energiecertificaat van het gebouw en de bouwwerkzaamheden waarin de technische documentatie van het project voorziet, mag niet meer bedragen dan 49,58 kWh/m² per jaar; — vermindering van het jaarlijkse primaire energieverbruik — 428,14 MWh/jaar;- berekende broeikasgasreductie van 90,75 ton CO2-equivalent per jaar. (Dutch)
    28 November 2021
    0 references
    Obiettivo del progetto: Miglioramento dell'efficienza energetica dell'edificio in Upper Street 1, Riga mediante l'isolamento delle pareti esterne e delle divisioni dell'edificio, la sostituzione delle finestre esistenti, l'installazione di un nuovo sistema di controllo del clima e la creazione di un sistema di riscaldamento, migliorando così il miglioramento delle prestazioni tecniche termiche, riducendo la dispersione di calore dell'edificio. Sostituire l'illuminazione esistente nei locali con un'illuminazione efficiente sotto il profilo energetico, riducendo così il consumo energetico. Al fine di garantire il conseguimento dell'obiettivo specifico di cui al regolamento n. 13 del Consiglio del 4 gennaio 2018 "Promuovere l'attuazione del secondo ciclo di applicazioni progettuali del programma operativo"Crescita e occupazione"Obiettivo di sostegno specifico 4.2.1"Promuovere il miglioramento dell'efficienza energetica negli edifici statali e residenziali", VISA"Cultura e Sport "Stadio Daugavas" prevede di realizzare i seguenti lavori di costruzione:- isolamento delle pareti esterne dell'edificio;- isolamento delle divisioni;- sostituzione di finestre esistenti;- sostituzione di vecchi nodi d'ingresso;- installazione di un nuovo impianto di climatizzazione;- sostituzione dell'illuminazione esistente;- isolamento del pavimento;- creazione di un nuovo impianto di riscaldamento nell'edificio.Le attività previste nell'ambito del progetto sono direttamente finalizzate al raggiungimento dell'obiettivo, aumentando così la longevità dell'edificio e la vita dell'edificio.Il sito di realizzazione del progetto: High Street 1, Riga.Durata del progetto: tre mesi dalla conclusione del contratto di progetto. Le attività relative alla preparazione della domanda di progetto sono state avviate nel secondo trimestre del 2017, quando sono stati effettuati il parere dell'ispezione tecnica dell'edificio e l'audit energetico.I costi totali ammissibili del progetto ammontano a 1 047 200,00 EUR, compreso il finanziamento del Fondo europeo di sviluppo regionale — 890 120,00 EUR;- il finanziamento del bilancio statale ammissibile — 157 080,00 EUR.Risultati programmati: — il risparmio di energia termica dopo l'attuazione del progetto non sarà inferiore al 44,24 % all'anno del consumo di calore calcolato nel certificato energetico dell'edificio prima della realizzazione del progetto;- il consumo di energia termica per il riscaldamento dopo l'attuazione del progetto, basato sui calcoli effettuati nel certificato energetico dell'edificio e sui lavori di costruzione previsti nella documentazione tecnica del progetto, non supererà 49,58 kWh/m² all'anno; — riduzione del consumo annuo di energia primaria — 428,14 MWh/anno;- riduzione calcolata dei gas a effetto serra di 90,75 tonnellate di CO2 equivalente all'anno. (Italian)
    11 January 2022
    0 references
    Augšiela 1, Rīga, LV-1009
    0 references

    Identifiers

    4.2.1.2/19/I/030
    0 references