Implementation of energy efficiency improvement measures at Bulduru Secondary School of Gardening Building complex at Viestura iela 6, Jurmala (Q3057021): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Created claim: summary (P836): Limited Liability Company „Bulduru Secondary School of Gardening” (hierna — de vennootschap) is een structurele eenheid (hoofdmaatschappij) van de Letse Universiteit van Landbouw, ondergeschikt aan het ministerie van Landbouw, waarvan de belangrijkste doelstelling is het verstrekken van hoogwaardige, concurrerende en voldoen aan de eisen van de Europese arbeidsmarkt middelbaar beroepsonderwijs en voortgezet onderwijs op gebieden met betrekking t...)
(‎Changed label, description and/or aliases in it, and other parts: Adding Italian translations)
label / itlabel / it
 
Attuazione di misure di miglioramento dell'efficienza energetica presso la Scuola Secondaria Bulduri di Giardinaggio a 6 Viestura Street, Jurmala
Property / summary
 
Società a responsabilità limitata "Bulduru Secondary School of Gardening" (di seguito "la società") è un'unità strutturale (società di capitale) dell'Università lettone dell'agricoltura, subordinata al ministero dell'Agricoltura, il cui obiettivo principale è quello di fornire alta qualità, competitività e soddisfare le esigenze del mercato del lavoro europeo formazione professionale secondaria e di perfezionamento nei settori relativi al giardinaggio, architettura del paesaggio, servizi di ristorazione e ospitalità, nonché la preparazione alla formazione continua ad un livello superiore. L'azienda ha organizzato le sue attività economiche e amministrative sia storicamente che nel territorio complesso e adiacente di Viestura iela 6, Jurmala. L'obiettivo di questo progetto è quello di attuare misure di efficienza energetica in tre edifici della Scuola Secondaria di Orticoltura Bulduri, che sono legati al miglioramento degli involucri edilizi e dei sistemi ingegneristici, migliorando in modo significativo le condizioni tecniche degli edifici e allo stesso tempo riducendo significativamente il consumo energetico necessario per garantire la resistenza termica degli edifici. Le seguenti misure per promuovere l'efficienza energetica sono previste come costi ammissibili: isolamento degli involucri edilizi, isolamento supplementare di finestre e porte esistenti, sostituzione di finestre per nuove finestre di vetro, ristrutturazione dei nodi d'ingresso, ristrutturazione del sistema di fornitura di calore e delle unità di riscaldamento, ripristino del sistema di alimentazione elettrica e dei cablaggi di distribuzione, rinnovo del sistema di illuminazione, ripristino del sistema di ventilazione e riscaldamento, ristrutturazione dell'acqua fredda e calda e dei sistemi fognari, costruzione di protezione contro i fulmini e sistemi antincendio, nonché costi relativi all'attuazione efficace del progetto e costi relativi alle norme di costruzione lettoni — gestione del progetto, sviluppo di progetti di costruzione, supervisione della costruzione e supervisione degli autori. 33 mesi dalla conclusione del contratto per l'attuazione del progetto fino al 31 ottobre 2022.Il costo totale del progetto: 4 722 922,98 EUR, di cui costi ammissibili del progetto 3741331,34 costi non ammissibili 981 591,64 EUR.Progetto di costi ammissibili per fonti finanziarie — Cofinanziamento richiesto dal FESR: 3 180 131,64 EUR (con intensità di aiuto — 85 %), mentre il finanziamento del bilancio statale ammissibile — 561 199,70 EUR. Nel quadro del progetto, si prevede di conseguire una riduzione energetica per tutti e tre gli edifici per un totale di 1 820,39 MWh/anno dopo l'attuazione delle misure di miglioramento dell'efficienza energetica, mentre il consumo energetico dopo l'attuazione del progetto di riscaldamento dell'edificio secondario non supererà 86,74 kWh/m², per il servizio secondario 2 edificio alberghiero 67,06 kWh/m² e il servizio scolastico secondario 3 per l'edilizia alberghiera — 68,28 kWh/m². 461,35 tonnellate di CO2/anno (per l'edificio delle scuole medie — 302,82 tonnellate CO2/anno, per il servizio secondario 2 edificio alberghiero — 80,20 tonnellate CO2/anno e per il servizio della scuola secondaria 3 edificio alberghiero — 78,33 tonnellate CO2/anno). (Italian)
Property / summary: Società a responsabilità limitata "Bulduru Secondary School of Gardening" (di seguito "la società") è un'unità strutturale (società di capitale) dell'Università lettone dell'agricoltura, subordinata al ministero dell'Agricoltura, il cui obiettivo principale è quello di fornire alta qualità, competitività e soddisfare le esigenze del mercato del lavoro europeo formazione professionale secondaria e di perfezionamento nei settori relativi al giardinaggio, architettura del paesaggio, servizi di ristorazione e ospitalità, nonché la preparazione alla formazione continua ad un livello superiore. L'azienda ha organizzato le sue attività economiche e amministrative sia storicamente che nel territorio complesso e adiacente di Viestura iela 6, Jurmala. L'obiettivo di questo progetto è quello di attuare misure di efficienza energetica in tre edifici della Scuola Secondaria di Orticoltura Bulduri, che sono legati al miglioramento degli involucri edilizi e dei sistemi ingegneristici, migliorando in modo significativo le condizioni tecniche degli edifici e allo stesso tempo riducendo significativamente il consumo energetico necessario per garantire la resistenza termica degli edifici. Le seguenti misure per promuovere l'efficienza energetica sono previste come costi ammissibili: isolamento degli involucri edilizi, isolamento supplementare di finestre e porte esistenti, sostituzione di finestre per nuove finestre di vetro, ristrutturazione dei nodi d'ingresso, ristrutturazione del sistema di fornitura di calore e delle unità di riscaldamento, ripristino del sistema di alimentazione elettrica e dei cablaggi di distribuzione, rinnovo del sistema di illuminazione, ripristino del sistema di ventilazione e riscaldamento, ristrutturazione dell'acqua fredda e calda e dei sistemi fognari, costruzione di protezione contro i fulmini e sistemi antincendio, nonché costi relativi all'attuazione efficace del progetto e costi relativi alle norme di costruzione lettoni — gestione del progetto, sviluppo di progetti di costruzione, supervisione della costruzione e supervisione degli autori. 33 mesi dalla conclusione del contratto per l'attuazione del progetto fino al 31 ottobre 2022.Il costo totale del progetto: 4 722 922,98 EUR, di cui costi ammissibili del progetto 3741331,34 costi non ammissibili 981 591,64 EUR.Progetto di costi ammissibili per fonti finanziarie — Cofinanziamento richiesto dal FESR: 3 180 131,64 EUR (con intensità di aiuto — 85 %), mentre il finanziamento del bilancio statale ammissibile — 561 199,70 EUR. Nel quadro del progetto, si prevede di conseguire una riduzione energetica per tutti e tre gli edifici per un totale di 1 820,39 MWh/anno dopo l'attuazione delle misure di miglioramento dell'efficienza energetica, mentre il consumo energetico dopo l'attuazione del progetto di riscaldamento dell'edificio secondario non supererà 86,74 kWh/m², per il servizio secondario 2 edificio alberghiero 67,06 kWh/m² e il servizio scolastico secondario 3 per l'edilizia alberghiera — 68,28 kWh/m². 461,35 tonnellate di CO2/anno (per l'edificio delle scuole medie — 302,82 tonnellate CO2/anno, per il servizio secondario 2 edificio alberghiero — 80,20 tonnellate CO2/anno e per il servizio della scuola secondaria 3 edificio alberghiero — 78,33 tonnellate CO2/anno). (Italian) / rank
 
Normal rank
Property / summary: Società a responsabilità limitata "Bulduru Secondary School of Gardening" (di seguito "la società") è un'unità strutturale (società di capitale) dell'Università lettone dell'agricoltura, subordinata al ministero dell'Agricoltura, il cui obiettivo principale è quello di fornire alta qualità, competitività e soddisfare le esigenze del mercato del lavoro europeo formazione professionale secondaria e di perfezionamento nei settori relativi al giardinaggio, architettura del paesaggio, servizi di ristorazione e ospitalità, nonché la preparazione alla formazione continua ad un livello superiore. L'azienda ha organizzato le sue attività economiche e amministrative sia storicamente che nel territorio complesso e adiacente di Viestura iela 6, Jurmala. L'obiettivo di questo progetto è quello di attuare misure di efficienza energetica in tre edifici della Scuola Secondaria di Orticoltura Bulduri, che sono legati al miglioramento degli involucri edilizi e dei sistemi ingegneristici, migliorando in modo significativo le condizioni tecniche degli edifici e allo stesso tempo riducendo significativamente il consumo energetico necessario per garantire la resistenza termica degli edifici. Le seguenti misure per promuovere l'efficienza energetica sono previste come costi ammissibili: isolamento degli involucri edilizi, isolamento supplementare di finestre e porte esistenti, sostituzione di finestre per nuove finestre di vetro, ristrutturazione dei nodi d'ingresso, ristrutturazione del sistema di fornitura di calore e delle unità di riscaldamento, ripristino del sistema di alimentazione elettrica e dei cablaggi di distribuzione, rinnovo del sistema di illuminazione, ripristino del sistema di ventilazione e riscaldamento, ristrutturazione dell'acqua fredda e calda e dei sistemi fognari, costruzione di protezione contro i fulmini e sistemi antincendio, nonché costi relativi all'attuazione efficace del progetto e costi relativi alle norme di costruzione lettoni — gestione del progetto, sviluppo di progetti di costruzione, supervisione della costruzione e supervisione degli autori. 33 mesi dalla conclusione del contratto per l'attuazione del progetto fino al 31 ottobre 2022.Il costo totale del progetto: 4 722 922,98 EUR, di cui costi ammissibili del progetto 3741331,34 costi non ammissibili 981 591,64 EUR.Progetto di costi ammissibili per fonti finanziarie — Cofinanziamento richiesto dal FESR: 3 180 131,64 EUR (con intensità di aiuto — 85 %), mentre il finanziamento del bilancio statale ammissibile — 561 199,70 EUR. Nel quadro del progetto, si prevede di conseguire una riduzione energetica per tutti e tre gli edifici per un totale di 1 820,39 MWh/anno dopo l'attuazione delle misure di miglioramento dell'efficienza energetica, mentre il consumo energetico dopo l'attuazione del progetto di riscaldamento dell'edificio secondario non supererà 86,74 kWh/m², per il servizio secondario 2 edificio alberghiero 67,06 kWh/m² e il servizio scolastico secondario 3 per l'edilizia alberghiera — 68,28 kWh/m². 461,35 tonnellate di CO2/anno (per l'edificio delle scuole medie — 302,82 tonnellate CO2/anno, per il servizio secondario 2 edificio alberghiero — 80,20 tonnellate CO2/anno e per il servizio della scuola secondaria 3 edificio alberghiero — 78,33 tonnellate CO2/anno). (Italian) / qualifier
 
point in time: 11 January 2022
Timestamp+2022-01-11T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 10:08, 11 January 2022

Project Q3057021 in Latvia
Language Label Description Also known as
English
Implementation of energy efficiency improvement measures at Bulduru Secondary School of Gardening Building complex at Viestura iela 6, Jurmala
Project Q3057021 in Latvia

    Statements

    0 references
    3,180,131.64 Euro
    0 references
    3,741,331.34 Euro
    0 references
    85.0 percent
    0 references
    14 February 2020
    0 references
    31 October 2022
    0 references
    Sabiedrība ar ierobežotu atbildību Bulduru Dārzkopības vidusskola
    0 references
    0 references

    56°58'50.56"N, 23°52'5.41"E
    0 references
    Sabiedrība ar ierobežotu atbildību “Bulduru Dārzkopības vidusskola” (turpmāk – Sabiedrība) ir Zemkopības ministrijas pakļautībā esošās Latvijas Lauksaimniecības universitātes struktūrvienība (kapitālsabiedrība), kuras pamatmērķis ir sniegt kvalitatīvu, konkurētspējīgu un Eiropas darba tirgus prasībām atbilstošu vidējo profesionālo izglītību un tālākizglītību ar dārzkopību, ainavu arhitektūru, ēdināšanas un viesmīlības pakalpojumiem saistītās specialitātēs, kā arī sagatavošanu izglītības turpināšanai augstākā izglītības pakāpē.Sabiedrība savu saimniecisko un administratīvo darbību gan vēsturiski, gan šobrīd ir organizējusi ēku kompleksā un pieguļošajā teritorijā Viestura ielā 6, Jūrmalā. Šī projekta mērķis ir veikt energoefektivitātes veicinošus pasākumus trijās Bulduru Dārzkopības vidusskolas kompleksa ēkās, kas saistīti ar ēku norobežojošo konstrukciju un inženiersistēmu uzlabošanu, tādejādi ievērojami uzlabojot ēku tehnisko stāvokli un vienlaikus būtiski samazinot nepieciešamo enerģijas patēriņu ēku siltumnoturības nodrošināšanai. Projektā kā attiecināmās izmaksas plānoti šādi energoefektivitāti veicinoši pasākumi – ēku norobežojošo konstrukciju siltināšana, esošo logu un durvju aiļu papildus siltināšana, kā arī logu nomaiņa pret jauniem stikla pakešu logiem, ieejas mezglu atjaunošana, siltumapgādes sistēmas un siltummezgla atjaunošana, elektroapgādes sistēmas un sadales elektroinstalācijas atjaunošana, apgaismojuma sistēmas atjaunošana, ventilācijas un apkures sistēmas atjaunošana, aukstā un karstā ūdens un kanalizācijas sistēmas atjaunošana, zibensaizsardzības un ugunsdzēsības sistēmas izbūve, kā arī ar projekta sekmīgu īstenošanu un LR būvnormatīviem saistītās izmaksas - projekta vadības, būvprojektu izstrādes, būvuzraudzības un autoruzraudzības izmaksas.Projekta īstenošanas laiks: 33 mēneši no līguma par projekta īstenošanu noslēgšanas, līdz 2022.gada 31.oktobrim.Projekta kopējās izmaksas: 4 722 922,98 EUR, no tām projekta attiecināmās izmaksas 3 741 331,34 EUR, neattiecināmās izmaksas - 981 591,64 EUR.Projekta attiecināmo izmaksas dalījumā pa finanšu avotiem - pieprasītais ERAF līdzfinansējums: 3 180 131,64 EUR (ar atbalsta intensitāti – 85%), savukārt attiecināmais valsts budžeta finansējums – 561 199,70 EUR. Projekta ietvaros pēc energoefektivitātes paaugstināšanas pasākumu īstenošanas plānots sasniegt enerģijas samazinājumu visām trīs ēkām kopā par 1820,39 MWh / gadā, savukārt enerģijas patēriņš pēc projekta īstenošanas vidusskolas ēkas apkurei nepārsniegs 86,74 kWh/m2 gadā, vidusskolas 2.dienesta viesnīcas ēkai – 67,06 kWh/m2 un vidusskolas 3.dienesta viesnīcas ēkai – 68,28 kWh/m2.Aprēķinātais siltumnīcefekta gāzu samazinājums: 461,35 tonnas CO2/gadā (vidusskola ēkai – 302,82 tonnas CO2/gadā, vidusskolas 2.dienesta viesnīcas ēkai – 80,20 tonnas CO2/gadā un vidusskolas 3.dienesta viesnīcas ēkai – 78,33 tonnas CO2/gadā). (Latvian)
    0 references
    Limited liability company “Bulduru Secondary School of Gardening” (hereinafter – Company) is a structural unit of the Latvian University of Agriculture (capital company) under the Ministry of Agriculture, the main aim of which is to provide quality, competitive and European labour market vocational education and further education in gardening, landscape architecture, catering and hospitality services, as well as preparation for continuing education at a higher education level.The Society has organised its economic and administrative activities both historically and currently in the complex and adjacent territory of Viestura iela 6. The aim of this project is to implement energy efficiency-enhancing measures in the three buildings of the Bulduri Secondary School of Gardening, which are related to the improvement of building envelopes and engineering systems, thus significantly improving the technical condition of the buildings and at the same time substantially reducing the necessary energy consumption to ensure the thermal stability of buildings. Project eligible costs are planned to promote energy efficiency – insulation of building envelope structures, additional insulation of existing windows and door sections, as well as replacement of windows with new glass package windows, renovation of entrance nodes, renovation of heating system and heating unit, renewal of electrical supply system and distribution wiring, renovation of lighting system, ventilation and heating system renovation, cold and hot water and sewerage system renovation, lightning protection and heating system renovation, project supervision project implementation project implementation time as well as related construction costs. 33 months from the conclusion of the contract on project implementation, until October 31, 2022.Project total costs: EUR 4722922,98, of which project eligible costs EUR 3741331,34, ineligible costs – EUR 981591,64.The eligible costs of the project by financial sources – requested ERDF co-financing: Within the project, after the implementation of energy efficiency improvement measures, it is planned to achieve energy reduction for all three buildings totalling 1820.39 MWh/year, while energy consumption for heating the secondary school building will not exceed 86.74 kWh/m² per year after the implementation of the project, it is planned to achieve energy reduction for all three buildings in total for 1820.39 MWh/m², and energy consumption for the 3rd day building of the secondary school building will not exceed 86.74 kWh/m² per year, for the 2nd day hotel building in secondary school – 67.06 kWh/m² and for the 3rd day high school hotel building – 68.28 kWh/m². 461.35 tons CO2/year (for secondary school building – 302.82 tons CO2/year, secondary school for 2nd service hotel building – 80.20 tons CO2/year and secondary school 3rd service hotel building – 78.33 tonnes CO2/year). (English)
    15 July 2021
    0 references
    Société à responsabilité limitée «Bulduru Secondary School of Gardening» (ci-après dénommée «la société») est une unité structurelle (société de capitaux) de l’Université lettone de l’agriculture, subordonnée au ministère de l’agriculture, dont l’objectif principal est de fournir des services de haute qualité, compétitifs et répondant aux exigences de l’enseignement secondaire professionnel et complémentaire du marché du travail européen dans des domaines liés au jardinage, à l’architecture paysagère, à la restauration et à l’hôtellerie, ainsi qu’à la préparation à la formation continue à un niveau d’enseignement supérieur. L’objectif de ce projet est de mettre en œuvre des mesures d’efficacité énergétique dans trois bâtiments de l’école secondaire d’horticulture Bulduri, qui sont liées à l’amélioration des enveloppes des bâtiments et des systèmes d’ingénierie, améliorant ainsi considérablement l’état technique des bâtiments tout en réduisant de manière significative la consommation d’énergie nécessaire pour assurer la résistance thermique des bâtiments. Les mesures suivantes visant à promouvoir l’efficacité énergétique sont prévues en tant que coûts éligibles: isolation des enveloppes des bâtiments, isolation supplémentaire des fenêtres et des portes existantes, ainsi que remplacement des fenêtres pour les nouvelles fenêtres en verre, rénovation des nœuds d’entrée, rénovation du système d’approvisionnement en chaleur et de l’unité de chauffage, restauration du système d’alimentation en électricité et de distribution, rénovation du système d’éclairage, restauration du système de ventilation et de chauffage, rénovation du système d’alimentation en eau froide et chaude et d’assainissement, construction de la protection contre la foudre et du système de lutte contre l’incendie, ainsi que coûts liés à la bonne mise en œuvre du projet et coûts liés aux normes lettones de construction — gestion du projet, développement de projets de construction, supervision de la construction et supervision de l’auteur. 33 mois à compter de la conclusion du contrat de mise en œuvre du projet jusqu’au 31 octobre 2022.Le coût total du projet: 4 722 922,98 EUR, dont coûts éligibles du projet 3 741 331,34 EUR, coûts non éligibles 981 591,64 EUR.Coûts éligibles du projet par sources financières — cofinancement demandé par le FEDER: 3 180 131,64 EUR (avec une intensité d’aide — 85 %), tandis que le financement éligible du budget de l’État — 561 199,70 EUR. Dans le cadre du projet, il est prévu de réaliser une réduction énergétique pour les trois bâtiments au total 1 820,39 MWh/an après la mise en œuvre des mesures d’amélioration de l’efficacité énergétique, tandis que la consommation d’énergie après la mise en œuvre du projet de chauffage du bâtiment secondaire ne dépassera pas 86,74 kWh/m², pour le service secondaire 2 bâtiment hôtelier 67,06 kWh/m² et le service secondaire 3 pour le bâtiment hôtelier — 68,28 kWh/m². 461,35 tonnes CO2/an (pour le bâtiment de l’école secondaire — 302,82 tonnes CO2/année, pour le service secondaire 2 bâtiment hôtelier — 80,20 tonnes CO2/année et pour le service secondaire 3 bâtiment hôtelier — 78,33 tonnes CO2/an). (French)
    25 November 2021
    0 references
    Limited Liability Company „Bulduru Secondary School of Gardening“ (im Folgenden „Unternehmen“) ist eine Struktureinheit (Kapitalgesellschaft) der lettischen Landwirtschaftsuniversität, die dem Landwirtschaftsministerium untersteht, deren Hauptziel darin besteht, qualitativ hochwertige, wettbewerbsfähige und die Anforderungen des europäischen Arbeitsmarktes erfüllende berufliche Bildung und Weiterbildung in den Bereichen Gartenbau, Landschaftsarchitektur, Gastronomie und Gastgewerbe sowie die Vorbereitung auf Weiterbildung auf einem höheren Bildungsniveau zu gewährleisten. Das Unternehmen hat seine wirtschaftlichen und administrativen Aktivitäten sowohl historisch als auch derzeit im komplexen und angrenzenden Gebiet von Viestura iela 6, Jurmala, organisiert. Ziel dieses Projekts ist die Umsetzung von Energieeffizienzmaßnahmen in drei Gebäuden der Bulduri Secondary School of Horticulture, die mit der Verbesserung von Gebäudehüllen und Engineering-Systemen zusammenhängen, wodurch der technische Zustand der Gebäude erheblich verbessert und gleichzeitig der notwendige Energieverbrauch erheblich reduziert wird, um den thermischen Widerstand von Gebäuden zu gewährleisten. Folgende Maßnahmen zur Förderung der Energieeffizienz sind als förderfähige Kosten geplant: Isolierung von Gebäudehüllen, zusätzliche Isolierung vorhandener Fenster und Türen, Erneuerung von Fenstern für neue Glasfenster, Renovierung von Eingangsknoten, Renovierung von Wärmeversorgungsanlagen und Heizeinheit, Wiederherstellung der Stromversorgung und Verteilungsverkabelung, Renovierung der Beleuchtungsanlage, Wiederherstellung der Lüftungs- und Heizungsanlage, Renovierung von Kalt- und Warmwasser- und Kanalisation, Bau von Blitzschutz und Brandbekämpfungssystem, Kosten im Zusammenhang mit der erfolgreichen Durchführung des Projekts und Kosten im Zusammenhang mit den lettischen Baustandards – Projektmanagement, Bauprojektentwicklung, Bauüberwachung und Autorenüberwachung. 33 Monate nach Abschluss des Vertrags über die Durchführung des Projekts bis zum 31. Oktober 2022.Die Gesamtkosten des Projekts: 4 722 922,98 EUR, davon förderfähige Projektkosten 3 741 331,34 EUR, nicht förderfähige Kosten 981 591,64 EUR.Projekt förderfähige Kosten aus Finanzierungsquellen – beantragte EFRE-Kofinanzierung: 3 180 131,64 EUR (mit Beihilfeintensität – 85 %), während die förderfähige staatliche Finanzierung – 561 199,70 EUR. Im Rahmen des Projekts soll für alle drei Gebäude in Höhe von 1 820,39 MWh/Jahr nach Durchführung der Energieeffizienzverbesserungsmaßnahmen Energiereduzierung erreicht werden, während der Energieverbrauch nach Durchführung des Projekts zur Beheizung des Nebengebäudes 86,74 kWh/m² für den Sekundardienst 2 Hotelgebäude 67,06 kWh/m² und Sekundarschuldienst 3 für Hotelgebäude – 68,28 kWh/m² nicht übersteigen wird. 461.35 Tonnen CO2/Jahr (für das Mittelschulgebäude – 302,82 Tonnen CO2/Jahr, für den Nebendienst 2 Hotelgebäude – 80,20 Tonnen CO2/Jahr und für den Sekundarschuldienst 3 Hotelgebäude – 78,33 Tonnen CO2/Jahr). (German)
    28 November 2021
    0 references
    Limited Liability Company „Bulduru Secondary School of Gardening” (hierna — de vennootschap) is een structurele eenheid (hoofdmaatschappij) van de Letse Universiteit van Landbouw, ondergeschikt aan het ministerie van Landbouw, waarvan de belangrijkste doelstelling is het verstrekken van hoogwaardige, concurrerende en voldoen aan de eisen van de Europese arbeidsmarkt middelbaar beroepsonderwijs en voortgezet onderwijs op gebieden met betrekking tot tuinieren, landschapsarchitectuur, catering en gastvrijheid, evenals de voorbereiding op voortgezet onderwijs op een hoger onderwijsniveau. Het bedrijf heeft haar economische en administratieve activiteiten georganiseerd, zowel historisch als momenteel in het complexe en aangrenzende grondgebied van Viestura iela 6, Jurmala. Het doel van dit project is energie-efficiëntiemaatregelen in te voeren in drie gebouwen van Bulduri Secondary School of Horticulture, die verband houden met de verbetering van bouwschils en engineeringsystemen, waardoor de technische staat van de gebouwen aanzienlijk wordt verbeterd en tegelijkertijd het noodzakelijke energieverbruik aanzienlijk wordt verminderd om de thermische weerstand van gebouwen te waarborgen. De volgende maatregelen ter bevordering van energie-efficiëntie zijn gepland als subsidiabele kosten: isolatie van bouwschils, extra isolatie van bestaande ramen en deuren, vervanging van ramen voor nieuwe glasramen, renovatie van toegangsknooppunten, renovatie van het warmtevoorzieningssysteem en verwarmingseenheid, herstel van het elektriciteitsvoorzieningssysteem en distributiebedrading, renovatie van het verlichtingssysteem, herstel van ventilatie- en verwarmingssystemen, renovatie van koud- en warmwater- en rioleringssysteem, bouw van bliksembeveiliging en brandbestrijdingssysteem, alsmede kosten in verband met de succesvolle uitvoering van het project en kosten in verband met de Letse bouwnormen — projectbeheer, bouwprojectontwikkeling, bouwtoezicht en toezicht op auteurs. 33 maanden vanaf de sluiting van het contract voor de uitvoering van het project tot en met 31 oktober 2022.De totale kosten van het project: 4 722 922,98 EUR, waarvan de subsidiabele kosten van het project 3 741 331,34 EUR, niet-subsidiabele kosten 981 591,64 EUR.Project subsidiabele kosten uit financiële bronnen — gevraagde medefinanciering uit het EFRO: 3 180 131,64 EUR (met steunintensiteit — 85 %), terwijl de in aanmerking komende financiering uit de overheidsbegroting — 561 199,70 EUR. In het kader van het project is het de bedoeling om voor alle drie de gebouwen een energievermindering te realiseren van in totaal 1 820,39 MWh/jaar na de uitvoering van de maatregelen ter verbetering van de energie-efficiëntie, terwijl het energieverbruik na de uitvoering van het project voor de verwarming van het secundaire gebouw niet hoger zal zijn dan 86,74 kWh/m², voor secundaire dienst 2 hotelgebouw 67,06 kWh/m² en secundaire schooldienst 3 voor hotelgebouwen — 68,28 kWh/m². Geschatte broeikasgasreductie: 461,35 ton CO2/jaar (voor de middelbare school — 302,82 ton CO2/jaar, voor secundaire dienst 2 hotelgebouw — 80,20 ton CO2/jaar en voor middelbare school 3 hotelgebouwen — 78,33 ton CO2/jaar). (Dutch)
    28 November 2021
    0 references
    Società a responsabilità limitata "Bulduru Secondary School of Gardening" (di seguito "la società") è un'unità strutturale (società di capitale) dell'Università lettone dell'agricoltura, subordinata al ministero dell'Agricoltura, il cui obiettivo principale è quello di fornire alta qualità, competitività e soddisfare le esigenze del mercato del lavoro europeo formazione professionale secondaria e di perfezionamento nei settori relativi al giardinaggio, architettura del paesaggio, servizi di ristorazione e ospitalità, nonché la preparazione alla formazione continua ad un livello superiore. L'azienda ha organizzato le sue attività economiche e amministrative sia storicamente che nel territorio complesso e adiacente di Viestura iela 6, Jurmala. L'obiettivo di questo progetto è quello di attuare misure di efficienza energetica in tre edifici della Scuola Secondaria di Orticoltura Bulduri, che sono legati al miglioramento degli involucri edilizi e dei sistemi ingegneristici, migliorando in modo significativo le condizioni tecniche degli edifici e allo stesso tempo riducendo significativamente il consumo energetico necessario per garantire la resistenza termica degli edifici. Le seguenti misure per promuovere l'efficienza energetica sono previste come costi ammissibili: isolamento degli involucri edilizi, isolamento supplementare di finestre e porte esistenti, sostituzione di finestre per nuove finestre di vetro, ristrutturazione dei nodi d'ingresso, ristrutturazione del sistema di fornitura di calore e delle unità di riscaldamento, ripristino del sistema di alimentazione elettrica e dei cablaggi di distribuzione, rinnovo del sistema di illuminazione, ripristino del sistema di ventilazione e riscaldamento, ristrutturazione dell'acqua fredda e calda e dei sistemi fognari, costruzione di protezione contro i fulmini e sistemi antincendio, nonché costi relativi all'attuazione efficace del progetto e costi relativi alle norme di costruzione lettoni — gestione del progetto, sviluppo di progetti di costruzione, supervisione della costruzione e supervisione degli autori. 33 mesi dalla conclusione del contratto per l'attuazione del progetto fino al 31 ottobre 2022.Il costo totale del progetto: 4 722 922,98 EUR, di cui costi ammissibili del progetto 3741331,34 costi non ammissibili 981 591,64 EUR.Progetto di costi ammissibili per fonti finanziarie — Cofinanziamento richiesto dal FESR: 3 180 131,64 EUR (con intensità di aiuto — 85 %), mentre il finanziamento del bilancio statale ammissibile — 561 199,70 EUR. Nel quadro del progetto, si prevede di conseguire una riduzione energetica per tutti e tre gli edifici per un totale di 1 820,39 MWh/anno dopo l'attuazione delle misure di miglioramento dell'efficienza energetica, mentre il consumo energetico dopo l'attuazione del progetto di riscaldamento dell'edificio secondario non supererà 86,74 kWh/m², per il servizio secondario 2 edificio alberghiero 67,06 kWh/m² e il servizio scolastico secondario 3 per l'edilizia alberghiera — 68,28 kWh/m². 461,35 tonnellate di CO2/anno (per l'edificio delle scuole medie — 302,82 tonnellate CO2/anno, per il servizio secondario 2 edificio alberghiero — 80,20 tonnellate CO2/anno e per il servizio della scuola secondaria 3 edificio alberghiero — 78,33 tonnellate CO2/anno). (Italian)
    11 January 2022
    0 references
    Viestura iela 6, Jūrmala, LV-2010
    0 references

    Identifiers

    4.2.1.2/19/I/003
    0 references