Construction of Siltumavota in the village of Vestienas (Q3057282): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Created claim: summary (P836): Om de kosten van thermische energie voor inwoners van de parochie Vestiena te verlagen of op het huidige niveau te handhaven, wordt een project uitgevoerd om de energie-efficiëntie van het bestaande warmteproductiesysteem te verbeteren, waarin verschillende alternatieven worden onderzocht om de huidige situatie te verbeteren. Analyse van de huidige situatie wordt geconcludeerd dat om de warmteproductie in het dorp Vestiena efficiënt te laten wer...)
(‎Changed label, description and/or aliases in it, and other parts: Adding Italian translations)
label / itlabel / it
 
Costruzione di fonti di calore nel villaggio di Vestiena
Property / summary
 
Al fine di ridurre il costo dell'energia termica per i residenti della parrocchia di Vestiena o mantenerla al livello attuale, è in corso di realizzazione un progetto per migliorare l'efficienza energetica del sistema di produzione di calore esistente, che esamina varie alternative per migliorare la situazione attuale. Analizzando la situazione attuale, si conclude che affinché la produzione di calore nel villaggio di Vestiena funzioni in modo efficiente, è necessario costruire una casa caldaia tipo pellet. Costruzione di una nuova fonte di calore nel villaggio di Vestiena — una casa caldaia comporterà l'ammodernamento della capacità di produzione di calore rinnovabile e l'aumento dell'approvvigionamento centralizzato di calore di 0,6 MW. La supervisione dell'autore e la supervisione della costruzione saranno assicurate per la supervisione delle attività di costruzione. Le principali attività del progetto: 1) lavori di costruzione; 2) supervisione delle costruzioni; 3) supervisione dell'autore; 4) acquisto di attrezzature e materiali. Si prevede che il progetto sarà attuato entro circa 34 mesi, dal momento della conclusione del contratto con la CFCA sul coinvolgimento del cofinanziamento KF, ma non oltre il 31 dicembre 2021. Costo totale del progetto 446 783,69 EUR, di cui 110 440,00 EUR del FC. (Italian)
Property / summary: Al fine di ridurre il costo dell'energia termica per i residenti della parrocchia di Vestiena o mantenerla al livello attuale, è in corso di realizzazione un progetto per migliorare l'efficienza energetica del sistema di produzione di calore esistente, che esamina varie alternative per migliorare la situazione attuale. Analizzando la situazione attuale, si conclude che affinché la produzione di calore nel villaggio di Vestiena funzioni in modo efficiente, è necessario costruire una casa caldaia tipo pellet. Costruzione di una nuova fonte di calore nel villaggio di Vestiena — una casa caldaia comporterà l'ammodernamento della capacità di produzione di calore rinnovabile e l'aumento dell'approvvigionamento centralizzato di calore di 0,6 MW. La supervisione dell'autore e la supervisione della costruzione saranno assicurate per la supervisione delle attività di costruzione. Le principali attività del progetto: 1) lavori di costruzione; 2) supervisione delle costruzioni; 3) supervisione dell'autore; 4) acquisto di attrezzature e materiali. Si prevede che il progetto sarà attuato entro circa 34 mesi, dal momento della conclusione del contratto con la CFCA sul coinvolgimento del cofinanziamento KF, ma non oltre il 31 dicembre 2021. Costo totale del progetto 446 783,69 EUR, di cui 110 440,00 EUR del FC. (Italian) / rank
 
Normal rank
Property / summary: Al fine di ridurre il costo dell'energia termica per i residenti della parrocchia di Vestiena o mantenerla al livello attuale, è in corso di realizzazione un progetto per migliorare l'efficienza energetica del sistema di produzione di calore esistente, che esamina varie alternative per migliorare la situazione attuale. Analizzando la situazione attuale, si conclude che affinché la produzione di calore nel villaggio di Vestiena funzioni in modo efficiente, è necessario costruire una casa caldaia tipo pellet. Costruzione di una nuova fonte di calore nel villaggio di Vestiena — una casa caldaia comporterà l'ammodernamento della capacità di produzione di calore rinnovabile e l'aumento dell'approvvigionamento centralizzato di calore di 0,6 MW. La supervisione dell'autore e la supervisione della costruzione saranno assicurate per la supervisione delle attività di costruzione. Le principali attività del progetto: 1) lavori di costruzione; 2) supervisione delle costruzioni; 3) supervisione dell'autore; 4) acquisto di attrezzature e materiali. Si prevede che il progetto sarà attuato entro circa 34 mesi, dal momento della conclusione del contratto con la CFCA sul coinvolgimento del cofinanziamento KF, ma non oltre il 31 dicembre 2021. Costo totale del progetto 446 783,69 EUR, di cui 110 440,00 EUR del FC. (Italian) / qualifier
 
point in time: 11 January 2022
Timestamp+2022-01-11T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 10:07, 11 January 2022

Project Q3057282 in Latvia
Language Label Description Also known as
English
Construction of Siltumavota in the village of Vestienas
Project Q3057282 in Latvia

    Statements

    0 references
    0 references
    110,440.0 Euro
    0 references
    276,100.0 Euro
    0 references
    40.0 percent
    0 references
    4 March 2019
    0 references
    31 December 2021
    0 references
    SIA "Bērzaunes komunālais uzņēmums"
    0 references
    0 references
    0 references

    56°52'1.20"N, 25°52'28.63"E
    0 references
    Lai samazinātu Vestienas pagasta iedzīvotāju izmaksas par siltumenerģiju vai noturētu tās pašreizējā līmenī, tiek īstenots projekts esošās siltuma ražošanas sistēmas energoefektivitātes uzlabošana, kurā ir apskatītas dažādas alternatīvas, kā uzlabot esošo situāciju. Analizējot esošo situāciju, secināms, lai siltuma ražošana Vestienas ciemā darbotos efektīvi, nepieciešams izbūvēt granulu tipa apkures katlu māju. Izbūvējot Vestienas ciemā jaunu siltumavotu - apkures katlu māju, tiks panākta atjaunojamo energoresursu izmantojošu siltumražošanas jaudu modernizācija un pieaugums centralizētajā siltumapgādē par 0,6 MW.Būvdarbu veikšanas pasākumu uzraudzībai tiks nodrošināta autoruzraudzība un būvuzraudzība.Projekta galvenās veicamās aktivitātes:1)Būvdarbi;2)Būvuzraudzība;3)Autoruzraudzība;4) Aprīkojuma un materiālu iegāde.Paredzams, ka projekts tiks īstenots apmēram 34 mēnešu laikā, no līguma ar CFLA noslēgšanas brīža par KF līdzfinansējuma piesaisti, bet ne vēlāk kā līdz 2021. gada 31.decembrim. Projekta kopējās izmaksas EUR 446783,69 no kurām KF finansējums EUR 110 440,00. (Latvian)
    0 references
    In order to reduce the cost of heat energy for inhabitants of Vestiena parish or to keep it at the current level, a project is being implemented to improve the energy efficiency of the existing heat production system, which looks at various alternatives to improve the current situation. Analysing the current situation, it is concluded that in order for the production of heat in the village of Vestienas to work effectively, it is necessary to build a pellet-type boiler house. When constructing a new heat source – boiler house in Vestiena village, modernisation of thermal production capacity using renewable energy resources and increase in district heating will be achieved by 0.6 MW. Author supervision and construction supervision will be provided for monitoring of construction activities.The main activities of the project will be carried out:1) Construction works;2) Construction supervision;3) Author’s supervision;4) Purchase of equipment and materials.It is expected that the project will be implemented by the end of the project for approximately 34 months, but at the end of 31st the moment the CLAF. Total cost of the project EUR 446783,69 of which CF funding EUR 110 440,00. (English)
    15 July 2021
    0 references
    Afin de réduire le coût de l’énergie thermique pour les habitants de la paroisse de Vestiena ou de la maintenir au niveau actuel, un projet est en cours d’exécution pour améliorer l’efficacité énergétique du système de production de chaleur existant, qui examine différentes alternatives pour améliorer la situation actuelle. En analysant la situation actuelle, il est conclu que pour que la production de chaleur dans le village de Vestiena fonctionne efficacement, il est nécessaire de construire une chaudière de type granulés. La construction d’une nouvelle source de chaleur dans le village de Vestiena — une chaufferie entraînera la modernisation de la capacité de production de chaleur renouvelable et l’augmentation de l’approvisionnement en chaleur centralisé de 0,6 MW. La supervision de l’auteur et la supervision de la construction seront assurées pour la supervision des activités de construction. Les principales activités du projet: 1) les travaux de construction; 2) la supervision de la construction; 3) la supervision de l’auteur; 4) l’achat d’équipements et de matériaux. Il est prévu que le projet sera mis en œuvre dans un délai d’environ 34 mois, à compter de la conclusion du contrat avec la CFCA sur l’implication du cofinancement de KF, mais au plus tard le 31 décembre 2021. Le coût total du projet est de 446 783,69 EUR, dont 110 440,00 EUR pour le FC. (French)
    25 November 2021
    0 references
    Um die Kosten der thermischen Energie für Bewohner der Gemeinde Vestiena zu senken oder auf dem aktuellen Niveau zu halten, wird ein Projekt zur Verbesserung der Energieeffizienz des bestehenden Wärmeerzeugungssystems durchgeführt, das verschiedene Alternativen zur Verbesserung der aktuellen Situation untersucht. Bei der Analyse der aktuellen Situation wird der Schluss gezogen, dass es notwendig ist, um die Wärmeerzeugung im Dorf Vestiena effizient zu arbeiten, ein Pellet-Kesselhaus zu bauen. Der Bau einer neuen Wärmequelle im Dorf Vestiena – ein Kesselhaus wird zur Modernisierung der erneuerbaren Wärmeerzeugungskapazität und zur Erhöhung der zentralen Wärmeversorgung um 0,6 MW führen. Für die Überwachung der Bauarbeiten wird die Bauaufsicht gewährleistet. Die Hauptaktivitäten des Projekts: 1) Bauarbeiten; 2) Bauaufsicht; 3) Genehmigungsaufsicht; 4) Anschaffung von Ausrüstung und Materialien. Es wird erwartet, dass das Projekt innerhalb von etwa 34 Monaten, ab dem Zeitpunkt des Vertragsabschlusses mit der CFCA über die Beteiligung der KF-Kofinanzierung, spätestens jedoch bis zum 31. Dezember 2021 umgesetzt wird. Insgesamt kostet das Projekt 446 783,69 EUR, davon finanziert CF 110 440,00 EUR. (German)
    28 November 2021
    0 references
    Om de kosten van thermische energie voor inwoners van de parochie Vestiena te verlagen of op het huidige niveau te handhaven, wordt een project uitgevoerd om de energie-efficiëntie van het bestaande warmteproductiesysteem te verbeteren, waarin verschillende alternatieven worden onderzocht om de huidige situatie te verbeteren. Analyse van de huidige situatie wordt geconcludeerd dat om de warmteproductie in het dorp Vestiena efficiënt te laten werken, het noodzakelijk is om een pellettype ketelhuis te bouwen. Bouw van een nieuwe warmtebron in het dorp Vestiena — een ketelhuis zal resulteren in modernisering van de productiecapaciteit van hernieuwbare warmte en een toename van de centrale warmtevoorziening met 0,6 MW. Auteurstoezicht en bouwtoezicht zal worden gewaarborgd voor het toezicht op bouwactiviteiten. De belangrijkste activiteiten van het project: 1) Bouwwerkzaamheden; 2) Bouwtoezicht; 3) Auteurstoezicht; 4) Aankoop van apparatuur en materialen. Naar verwachting zal het project binnen ongeveer 34 maanden worden uitgevoerd, vanaf het moment van sluiting van het contract met het CFCA over de betrokkenheid van KF-medefinanciering, maar uiterlijk op 31 december 2021. Het totale project kostte 446 783,69 EUR, waarvan 110 440,00 EUR door het CF werd gefinancierd. (Dutch)
    28 November 2021
    0 references
    Al fine di ridurre il costo dell'energia termica per i residenti della parrocchia di Vestiena o mantenerla al livello attuale, è in corso di realizzazione un progetto per migliorare l'efficienza energetica del sistema di produzione di calore esistente, che esamina varie alternative per migliorare la situazione attuale. Analizzando la situazione attuale, si conclude che affinché la produzione di calore nel villaggio di Vestiena funzioni in modo efficiente, è necessario costruire una casa caldaia tipo pellet. Costruzione di una nuova fonte di calore nel villaggio di Vestiena — una casa caldaia comporterà l'ammodernamento della capacità di produzione di calore rinnovabile e l'aumento dell'approvvigionamento centralizzato di calore di 0,6 MW. La supervisione dell'autore e la supervisione della costruzione saranno assicurate per la supervisione delle attività di costruzione. Le principali attività del progetto: 1) lavori di costruzione; 2) supervisione delle costruzioni; 3) supervisione dell'autore; 4) acquisto di attrezzature e materiali. Si prevede che il progetto sarà attuato entro circa 34 mesi, dal momento della conclusione del contratto con la CFCA sul coinvolgimento del cofinanziamento KF, ma non oltre il 31 dicembre 2021. Costo totale del progetto 446 783,69 EUR, di cui 110 440,00 EUR del FC. (Italian)
    11 January 2022
    0 references
    Vestienas muiža, Vestiena, Vestienas pag., Madonas nov., LV-4855
    0 references

    Identifiers

    4.3.1.0/18/A/029
    0 references