Solar collector system installation to improve energy efficiency of Krāslava swimming pool (Q3057187): Difference between revisions
Jump to navigation
Jump to search
(Created claim: summary (P836): Het directe doel van het project „Installatie van zonnecollectoren ter verbetering van de energie-efficiëntie van het zwembad van Krāslava” is het installeren van een zonnecollectorsysteem voor het zwembadgebouw van Kraslava, het verminderen van het thermische energieverbruik en het bijdragen aan de verbetering van de energie-efficiëntie van het gebouw. In het kader van het project worden de volgende activiteiten gepland: — het installeren van e...) |
(Changed label, description and/or aliases in it, and other parts: Adding Italian translations) |
||||||||||||||
label / it | label / it | ||||||||||||||
"Installazione del sistema di collettori solari per migliorare l'efficienza energetica nella piscina di Kraslava" | |||||||||||||||
Property / summary | |||||||||||||||
L'obiettivo diretto del progetto "Installazione del sistema di collettori solari per il miglioramento dell'efficienza energetica della piscina Krāslava" è quello di installare un sistema di collettori solari per l'edificio piscina Kraslava, riducendo il consumo di energia termica e contribuendo al miglioramento dell'efficienza energetica dell'edificio. Nell'ambito del progetto sono previste le seguenti attività: — installare un sistema di collettore solare con una capacità totale di 100,856 kW per la preparazione dell'acqua per la piscina;- installare un sistema solare modulare con una capacità totale di 52 kW per la produzione di energia elettrica da fonti rinnovabili;- l'installazione di un sistema di controllo automatico. Il progetto comporterà una riduzione del consumo di energia primaria di 266 230 kWh all'anno, mentre la riduzione delle emissioni di anidride carbonica è prevista per 45.012 tCo2 all'anno. Il progetto è previsto per il primo orizzonte del 2021. Il progetto dovrebbe essere attuato entro 9 mesi. I costi totali previsti per il progetto ammontano a 198 407,10 EUR, i costi ammissibili del progetto sono stimati a 161 807,54 EUR. Il Fondo europeo di sviluppo regionale finanzia 137 536,41 EUR (85,00 %), i costi non ammissibili del progetto ammontano a 365 599,56 EUR (Italian) | |||||||||||||||
Property / summary: L'obiettivo diretto del progetto "Installazione del sistema di collettori solari per il miglioramento dell'efficienza energetica della piscina Krāslava" è quello di installare un sistema di collettori solari per l'edificio piscina Kraslava, riducendo il consumo di energia termica e contribuendo al miglioramento dell'efficienza energetica dell'edificio. Nell'ambito del progetto sono previste le seguenti attività: — installare un sistema di collettore solare con una capacità totale di 100,856 kW per la preparazione dell'acqua per la piscina;- installare un sistema solare modulare con una capacità totale di 52 kW per la produzione di energia elettrica da fonti rinnovabili;- l'installazione di un sistema di controllo automatico. Il progetto comporterà una riduzione del consumo di energia primaria di 266 230 kWh all'anno, mentre la riduzione delle emissioni di anidride carbonica è prevista per 45.012 tCo2 all'anno. Il progetto è previsto per il primo orizzonte del 2021. Il progetto dovrebbe essere attuato entro 9 mesi. I costi totali previsti per il progetto ammontano a 198 407,10 EUR, i costi ammissibili del progetto sono stimati a 161 807,54 EUR. Il Fondo europeo di sviluppo regionale finanzia 137 536,41 EUR (85,00 %), i costi non ammissibili del progetto ammontano a 365 599,56 EUR (Italian) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: L'obiettivo diretto del progetto "Installazione del sistema di collettori solari per il miglioramento dell'efficienza energetica della piscina Krāslava" è quello di installare un sistema di collettori solari per l'edificio piscina Kraslava, riducendo il consumo di energia termica e contribuendo al miglioramento dell'efficienza energetica dell'edificio. Nell'ambito del progetto sono previste le seguenti attività: — installare un sistema di collettore solare con una capacità totale di 100,856 kW per la preparazione dell'acqua per la piscina;- installare un sistema solare modulare con una capacità totale di 52 kW per la produzione di energia elettrica da fonti rinnovabili;- l'installazione di un sistema di controllo automatico. Il progetto comporterà una riduzione del consumo di energia primaria di 266 230 kWh all'anno, mentre la riduzione delle emissioni di anidride carbonica è prevista per 45.012 tCo2 all'anno. Il progetto è previsto per il primo orizzonte del 2021. Il progetto dovrebbe essere attuato entro 9 mesi. I costi totali previsti per il progetto ammontano a 198 407,10 EUR, i costi ammissibili del progetto sono stimati a 161 807,54 EUR. Il Fondo europeo di sviluppo regionale finanzia 137 536,41 EUR (85,00 %), i costi non ammissibili del progetto ammontano a 365 599,56 EUR (Italian) / qualifier | |||||||||||||||
point in time: 11 January 2022
|
Revision as of 10:06, 11 January 2022
Project Q3057187 in Latvia
Language | Label | Description | Also known as |
---|---|---|---|
English | Solar collector system installation to improve energy efficiency of Krāslava swimming pool |
Project Q3057187 in Latvia |
Statements
137,536.41 Euro
0 references
161,807.54 Euro
0 references
85.0 percent
0 references
10 February 2021
0 references
9 November 2021
0 references
Krāslavas novada pašvaldība
0 references
Projekta "Saules kolektoru sistēmas uzstādīšana Krāslavas peldbaseina energoefektivitātes uzlabošanai" tiešais mērķis ir uzstādīt saules kolektoru sistēmu Krāslavas peldbaseina ēkai, samazinot siltumenerģijas patēriņu un veicinot ēkas energoefektivitātes paaugstināšanu. Projektā ietvaros ir plānotas šādas darbības: - ierīkot saules kolektoru sistēmu ar kopējo jaudu 100,856 kW kārstā ūdens sagatavošanai baseina vajadzībām;- ierīkot saules moduļu sistēmu ar kopējo jaudu 52 kW elektrības ražošanai no atjaujamiem energoresursiem;- automātiskās vadības sistēmas ierīkošana.Projekta rezultātā tiks samazināts primārās enerģijas patēriņš par 266 230 kWh gadā, bet oglekļa dioksīda emisijas samazinājums ir plānots 45,012 tCo2 gadā.Projekta uzsākšana ir plānota 2021.gada 1.ceruksnī. Projektu plānots īstenot 9 mēnešu laikā.Projekta plānotās kopējās izmaksas sastāda EUR 198 407.10, projekta attiecināmās izmaksas plānotās EUR 161 807.54 apmērā t.sk. Eiropas Reģionālās attīstības fonda finansējums EUR 137 536.41 (85.00%), projekta neattiecināmās izmaksas sastāda EUR 36 599.56 (Latvian)
0 references
The direct aim of the project “Installation of the solar collector system for improving the energy efficiency of the Krāslava swimming pool” is to install a solar collector system for the Krāslava swimming pool building, reducing thermal energy consumption and promoting the energy efficiency of the building. Within the framework of the project, the following activities are planned: To install a solar collector system with a total capacity of 100.856 kW to prepare the hot water for the needs of the pool; – to install a solar modular system with a total capacity of 52 kW for electricity production from removable energy resources;- installation of an automatic control system.The project will result in a reduction of primary energy consumption by 266230 kWh per year, while the reduction of carbon dioxide emissions is planned at 45.012 tCo2 per year. The project is planned to be implemented within 9 months.The planned total cost of the project is EUR 198 407.10, the eligible costs of the project are estimated at EUR 161 807.54 incl. European Regional Development Fund funding EUR 137 536.41 (85.00 %), project ineligible costs amount to EUR 36 599.56 (English)
15 July 2021
0 references
L’objectif direct du projet «Installation d’un système de collecteur solaire pour améliorer l’efficacité énergétique de la piscine Krāslava» est d’installer un système de collecteur solaire pour le bâtiment de la piscine Kraslava, réduisant la consommation d’énergie thermique et contribuant à l’amélioration de l’efficacité énergétique du bâtiment. Dans le cadre du projet, les activités suivantes sont prévues: — l’installation d’un système de collecteur solaire d’une capacité totale de 100,856 kW pour la préparation de l’eau pour la piscine;- l’installation d’un système modulaire solaire d’une capacité totale de 52 kW pour la production d’électricité à partir de sources d’énergie renouvelables;- l’installation d’un système de contrôle automatique. Le projet aboutira à une réduction de la consommation d’énergie primaire de 266 230 kWh par an, tandis que la réduction des émissions de dioxyde de carbone est prévue pour 45,012 tCo2 par an. Le projet devrait être mis en œuvre dans un délai de 9 mois. Le total des coûts prévus pour le projet s’élève à 198 407,10 EUR, les coûts éligibles du projet étant estimés à 161 807,54 EUR. Le Fonds européen de développement régional finance 137 536,41 EUR (85,00 %), les coûts inéligibles des projets s’élèvent à 36 599,56 EUR. (French)
25 November 2021
0 references
Das direkte Ziel des Projekts „Installation von Solarkollektoren zur Verbesserung der Energieeffizienz des Krāslava-Schwimmbades“ ist die Installation eines Sonnenkollektorsystems für das Kraslava-Schwimmbad, die Reduzierung des thermischen Energieverbrauchs und die Verbesserung der Energieeffizienz des Gebäudes. Im Rahmen des Projekts sind folgende Aktivitäten geplant: — zur Installation eines Solarkollektorsystems mit einer Gesamtleistung von 100,856 kW zur Wasseraufbereitung für den Pool;- zur Installation eines Solarmodulsystems mit einer Gesamtleistung von 52 kW für die Erzeugung von Strom aus erneuerbaren Energiequellen;- die Installation einer automatischen Steuerung. Das Projekt wird zu einer Reduzierung des Primärenergieverbrauchs um 266 230 kWh pro Jahr führen, während die Reduzierung der Kohlendioxidemissionen für 45,12 tCo2 pro Jahr geplant ist. Das Projekt soll im 1. Horizont 2021 beginnen. Das Projekt soll innerhalb von neun Monaten durchgeführt werden.Die für das Projekt veranschlagten Gesamtkosten belaufen sich auf 198 407,10 EUR, die förderfähigen Kosten des Projekts werden auf 161 807,54 EUR veranschlagt. Aus dem Europäischen Fonds für regionale Entwicklung finanzierte Mittel in Höhe von 1 375 536,41 EUR (85,00 %), die nicht förderfähigen Projektkosten belaufen sich auf 365 599,56 EUR. (German)
28 November 2021
0 references
Het directe doel van het project „Installatie van zonnecollectoren ter verbetering van de energie-efficiëntie van het zwembad van Krāslava” is het installeren van een zonnecollectorsysteem voor het zwembadgebouw van Kraslava, het verminderen van het thermische energieverbruik en het bijdragen aan de verbetering van de energie-efficiëntie van het gebouw. In het kader van het project worden de volgende activiteiten gepland: — het installeren van een zonnecollectorsysteem met een totale capaciteit van 100,856 kW voor de voorbereiding van water voor de pool;- het installeren van een modulair zonnesysteem met een totale capaciteit van 52 kW voor de productie van elektriciteit uit hernieuwbare energiebronnen;- de installatie van een automatisch controlesysteem. Het project zal resulteren in een vermindering van het primaire energieverbruik met 266 230 kWh per jaar, terwijl de vermindering van de kooldioxide-emissies gepland is voor 45,0212 tCo2 per jaar. Het project zal naar verwachting van start gaan in de 1e horizon van 2021. Het project zal naar verwachting binnen 9 maanden worden uitgevoerd. De totale kosten voor het project bedragen 1 984 007,10 EUR, waarvan de subsidiabele kosten van het project op 161 807,54 EUR worden geraamd. Het Europees Fonds voor Regionale Ontwikkeling financiert 1 375 536,41 EUR (85,00 %), niet-subsidiabele projectkosten ten bedrage van 36 599,56 EUR (Dutch)
28 November 2021
0 references
L'obiettivo diretto del progetto "Installazione del sistema di collettori solari per il miglioramento dell'efficienza energetica della piscina Krāslava" è quello di installare un sistema di collettori solari per l'edificio piscina Kraslava, riducendo il consumo di energia termica e contribuendo al miglioramento dell'efficienza energetica dell'edificio. Nell'ambito del progetto sono previste le seguenti attività: — installare un sistema di collettore solare con una capacità totale di 100,856 kW per la preparazione dell'acqua per la piscina;- installare un sistema solare modulare con una capacità totale di 52 kW per la produzione di energia elettrica da fonti rinnovabili;- l'installazione di un sistema di controllo automatico. Il progetto comporterà una riduzione del consumo di energia primaria di 266 230 kWh all'anno, mentre la riduzione delle emissioni di anidride carbonica è prevista per 45.012 tCo2 all'anno. Il progetto è previsto per il primo orizzonte del 2021. Il progetto dovrebbe essere attuato entro 9 mesi. I costi totali previsti per il progetto ammontano a 198 407,10 EUR, i costi ammissibili del progetto sono stimati a 161 807,54 EUR. Il Fondo europeo di sviluppo regionale finanzia 137 536,41 EUR (85,00 %), i costi non ammissibili del progetto ammontano a 365 599,56 EUR (Italian)
11 January 2022
0 references
Raiņa iela 25, Krāslava, Krāslavas nov., LV-5601
0 references
Identifiers
4.2.2.0/20/I/008
0 references