Improvement of energy efficiency for municipal cultural institution – Apes folk house and library – Skolas iela 4, Apē, Apes Municipality (Q3057181): Difference between revisions
Jump to navigation
Jump to search
(Created claim: summary (P836): Het doel van het project is het verminderen van het primaire energieverbruik door bij te dragen tot de verbetering van de energie-efficiëntie en de vermindering van de uitgaven van de lokale overheid voor verwarming door investeringen in de bouw van het Volkshuis en de bibliotheek van Apes overeenkomstig de prioriteiten van het ontwikkelingsprogramma van de lokale overheid. ontwikkeling van documentatie van bouwvoornemens; tijdelijke ontwikk...) |
(Changed label, description and/or aliases in it, and other parts: Adding Italian translations) |
||||||||||||||
label / it | label / it | ||||||||||||||
Miglioramento dell'efficienza energetica per l'istituzione culturale comunale — Ape Folk House and Library — Skolas iela 4, Ape, contea di Ape | |||||||||||||||
Property / summary | |||||||||||||||
L'obiettivo del progetto è ridurre il consumo di energia primaria contribuendo al miglioramento dell'efficienza energetica e alla riduzione della spesa delle amministrazioni locali per il riscaldamento effettuando investimenti nella costruzione della Casa del popolo e della biblioteca delle scimmie conformemente alle priorità stabilite nel programma di sviluppo delle amministrazioni locali. sviluppo della documentazione delle intenzioni costruttive; sviluppo temporaneo del rendimento energetico;3.Lavori di costruzione attribuibili all'efficienza energetica paaugstināšanu:3.1. isolamento della facciata;3.2.Cola isolamento della parete;3.3. isolamento supplementare della divisione sottotetto;3.4. sostituzione di finestre esistenti per l'infiammazione del calore; 3.5. sostituzione delle porte esterne.4. Lavori di costruzione attribuibili all'impianto tecnico dell'edificio uzlabošanu:4.1.divcauruļu impianto di riscaldamento;4.2. installazione di una nuova caldaia per il riscaldamento centrale;4.3. costruzione di un locale caldaia e di un magazzino combustibile;4.4. costruzione dell'alimentazione di calore;4.5. costruzione dell'alimentazione elettrica del locale caldaia, dell'approvvigionamento idrico e delle tubazioni fognarie.5. Lavori di riparazione cosmetica dell'edificio e dei lavori di miglioramento del territorio (compresi come costi non ammissibili)5.1. riparazione estetica della sala;5.2. lavori di miglioramento del territorio;5.3 lavori di illuminazione per facciate.6. Supervisione della costruzione;7. Vigilanza di raccolta;8.Misure di pubblica utilità;9. Effettuazione del monitoraggio dopo l'attuazione del progetto.Per essere estetici e funzionali dopo il completamento dei lavori di efficienza energetica, l'interno e l'ambiente dell'edificio sarebbero estetici e funzionali, anche la riparazione cosmetica interna e il miglioramento del territorio adiacente all'edificio, che dovrebbero essere inclusi come ulteriori lavori da svolgere nel progetto. Inoltre, è necessario costruire una caldaia indipendente con reti di stoccaggio e approvvigionamento di combustibile. In conseguenza del progetto, il consumo di energia primaria sarà ridotto del 60,46 %, nonché la quantità totale di emissioni di anidride carbonica del progetto del 67,48 %. I principali beneficiari e beneficiari sono, in primo luogo, il comune, che ridurrà i costi operativi dell'edificio pubblico di Skolas iela 4, Ape nei prossimi anni, l'economia dell'energia termica e secondaria, gli abitanti del comune, che sperimenteranno i risultati del progetto nel modo più diretto: la quantità di inquinamento da gas di scarico causato dal riscaldamento in città sarà ridotta, il livello di temperatura dell'edificio migliorerà significativamente, che creerà un soggiorno piacevole e confortevole in esso, così come la migliore forma estetica ambientale e interna creerà soddisfazione e orgoglio per la sua appartenenza alla contea. Il costo totale del progetto è di 507 222,01 EUR, di cui 330 470,21 EUR ammissibili, costi non ammissibili 176 851,80 EUR. I costi ammissibili sono condivisi — finanziamento FESR 159 318,00 EUR, la sovvenzione di bilancio dello Stato ai comuni 8 434,53 EUR, finanziamenti degli enti locali ammontano a 162 717,68 EUR. L'aumento dei finanziamenti comunali è dovuto al fatto che non è stato possibile collocare una caldaia e lo stoccaggio del combustibile in un edificio esistente, è stato necessario costruire un edificio separato e attrezzature di ingegneria. I costi non ammissibili comprendono lavori di riparazione estetica per i locali principali, opere di illuminazione delle facciate e lavori di miglioramento del territorio, che saranno finanziati interamente dal governo locale con i fondi di prestito. La durata prevista del progetto — 13 mesi. (Italian) | |||||||||||||||
Property / summary: L'obiettivo del progetto è ridurre il consumo di energia primaria contribuendo al miglioramento dell'efficienza energetica e alla riduzione della spesa delle amministrazioni locali per il riscaldamento effettuando investimenti nella costruzione della Casa del popolo e della biblioteca delle scimmie conformemente alle priorità stabilite nel programma di sviluppo delle amministrazioni locali. sviluppo della documentazione delle intenzioni costruttive; sviluppo temporaneo del rendimento energetico;3.Lavori di costruzione attribuibili all'efficienza energetica paaugstināšanu:3.1. isolamento della facciata;3.2.Cola isolamento della parete;3.3. isolamento supplementare della divisione sottotetto;3.4. sostituzione di finestre esistenti per l'infiammazione del calore; 3.5. sostituzione delle porte esterne.4. Lavori di costruzione attribuibili all'impianto tecnico dell'edificio uzlabošanu:4.1.divcauruļu impianto di riscaldamento;4.2. installazione di una nuova caldaia per il riscaldamento centrale;4.3. costruzione di un locale caldaia e di un magazzino combustibile;4.4. costruzione dell'alimentazione di calore;4.5. costruzione dell'alimentazione elettrica del locale caldaia, dell'approvvigionamento idrico e delle tubazioni fognarie.5. Lavori di riparazione cosmetica dell'edificio e dei lavori di miglioramento del territorio (compresi come costi non ammissibili)5.1. riparazione estetica della sala;5.2. lavori di miglioramento del territorio;5.3 lavori di illuminazione per facciate.6. Supervisione della costruzione;7. Vigilanza di raccolta;8.Misure di pubblica utilità;9. Effettuazione del monitoraggio dopo l'attuazione del progetto.Per essere estetici e funzionali dopo il completamento dei lavori di efficienza energetica, l'interno e l'ambiente dell'edificio sarebbero estetici e funzionali, anche la riparazione cosmetica interna e il miglioramento del territorio adiacente all'edificio, che dovrebbero essere inclusi come ulteriori lavori da svolgere nel progetto. Inoltre, è necessario costruire una caldaia indipendente con reti di stoccaggio e approvvigionamento di combustibile. In conseguenza del progetto, il consumo di energia primaria sarà ridotto del 60,46 %, nonché la quantità totale di emissioni di anidride carbonica del progetto del 67,48 %. I principali beneficiari e beneficiari sono, in primo luogo, il comune, che ridurrà i costi operativi dell'edificio pubblico di Skolas iela 4, Ape nei prossimi anni, l'economia dell'energia termica e secondaria, gli abitanti del comune, che sperimenteranno i risultati del progetto nel modo più diretto: la quantità di inquinamento da gas di scarico causato dal riscaldamento in città sarà ridotta, il livello di temperatura dell'edificio migliorerà significativamente, che creerà un soggiorno piacevole e confortevole in esso, così come la migliore forma estetica ambientale e interna creerà soddisfazione e orgoglio per la sua appartenenza alla contea. Il costo totale del progetto è di 507 222,01 EUR, di cui 330 470,21 EUR ammissibili, costi non ammissibili 176 851,80 EUR. I costi ammissibili sono condivisi — finanziamento FESR 159 318,00 EUR, la sovvenzione di bilancio dello Stato ai comuni 8 434,53 EUR, finanziamenti degli enti locali ammontano a 162 717,68 EUR. L'aumento dei finanziamenti comunali è dovuto al fatto che non è stato possibile collocare una caldaia e lo stoccaggio del combustibile in un edificio esistente, è stato necessario costruire un edificio separato e attrezzature di ingegneria. I costi non ammissibili comprendono lavori di riparazione estetica per i locali principali, opere di illuminazione delle facciate e lavori di miglioramento del territorio, che saranno finanziati interamente dal governo locale con i fondi di prestito. La durata prevista del progetto — 13 mesi. (Italian) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: L'obiettivo del progetto è ridurre il consumo di energia primaria contribuendo al miglioramento dell'efficienza energetica e alla riduzione della spesa delle amministrazioni locali per il riscaldamento effettuando investimenti nella costruzione della Casa del popolo e della biblioteca delle scimmie conformemente alle priorità stabilite nel programma di sviluppo delle amministrazioni locali. sviluppo della documentazione delle intenzioni costruttive; sviluppo temporaneo del rendimento energetico;3.Lavori di costruzione attribuibili all'efficienza energetica paaugstināšanu:3.1. isolamento della facciata;3.2.Cola isolamento della parete;3.3. isolamento supplementare della divisione sottotetto;3.4. sostituzione di finestre esistenti per l'infiammazione del calore; 3.5. sostituzione delle porte esterne.4. Lavori di costruzione attribuibili all'impianto tecnico dell'edificio uzlabošanu:4.1.divcauruļu impianto di riscaldamento;4.2. installazione di una nuova caldaia per il riscaldamento centrale;4.3. costruzione di un locale caldaia e di un magazzino combustibile;4.4. costruzione dell'alimentazione di calore;4.5. costruzione dell'alimentazione elettrica del locale caldaia, dell'approvvigionamento idrico e delle tubazioni fognarie.5. Lavori di riparazione cosmetica dell'edificio e dei lavori di miglioramento del territorio (compresi come costi non ammissibili)5.1. riparazione estetica della sala;5.2. lavori di miglioramento del territorio;5.3 lavori di illuminazione per facciate.6. Supervisione della costruzione;7. Vigilanza di raccolta;8.Misure di pubblica utilità;9. Effettuazione del monitoraggio dopo l'attuazione del progetto.Per essere estetici e funzionali dopo il completamento dei lavori di efficienza energetica, l'interno e l'ambiente dell'edificio sarebbero estetici e funzionali, anche la riparazione cosmetica interna e il miglioramento del territorio adiacente all'edificio, che dovrebbero essere inclusi come ulteriori lavori da svolgere nel progetto. Inoltre, è necessario costruire una caldaia indipendente con reti di stoccaggio e approvvigionamento di combustibile. In conseguenza del progetto, il consumo di energia primaria sarà ridotto del 60,46 %, nonché la quantità totale di emissioni di anidride carbonica del progetto del 67,48 %. I principali beneficiari e beneficiari sono, in primo luogo, il comune, che ridurrà i costi operativi dell'edificio pubblico di Skolas iela 4, Ape nei prossimi anni, l'economia dell'energia termica e secondaria, gli abitanti del comune, che sperimenteranno i risultati del progetto nel modo più diretto: la quantità di inquinamento da gas di scarico causato dal riscaldamento in città sarà ridotta, il livello di temperatura dell'edificio migliorerà significativamente, che creerà un soggiorno piacevole e confortevole in esso, così come la migliore forma estetica ambientale e interna creerà soddisfazione e orgoglio per la sua appartenenza alla contea. Il costo totale del progetto è di 507 222,01 EUR, di cui 330 470,21 EUR ammissibili, costi non ammissibili 176 851,80 EUR. I costi ammissibili sono condivisi — finanziamento FESR 159 318,00 EUR, la sovvenzione di bilancio dello Stato ai comuni 8 434,53 EUR, finanziamenti degli enti locali ammontano a 162 717,68 EUR. L'aumento dei finanziamenti comunali è dovuto al fatto che non è stato possibile collocare una caldaia e lo stoccaggio del combustibile in un edificio esistente, è stato necessario costruire un edificio separato e attrezzature di ingegneria. I costi non ammissibili comprendono lavori di riparazione estetica per i locali principali, opere di illuminazione delle facciate e lavori di miglioramento del territorio, che saranno finanziati interamente dal governo locale con i fondi di prestito. La durata prevista del progetto — 13 mesi. (Italian) / qualifier | |||||||||||||||
point in time: 11 January 2022
|
Revision as of 10:06, 11 January 2022
Project Q3057181 in Latvia
Language | Label | Description | Also known as |
---|---|---|---|
English | Improvement of energy efficiency for municipal cultural institution – Apes folk house and library – Skolas iela 4, Apē, Apes Municipality |
Project Q3057181 in Latvia |
Statements
157,346.56 Euro
0 references
326,377.44 Euro
0 references
48.21 percent
0 references
4 September 2018
0 references
3 October 2019
0 references
Apes novada dome
0 references
Projekta mērķis ir samazināt primārās enerģijas patēriņu, sekmējot energoefektivitātes paaugstināšanu un pašvaldības izdevumu samazināšanos par siltumapgādi, veicot ieguldījumus Apes tautas nama un bibliotēkas ēkā, atbilstoši pašvaldības attīstības programmā noteiktajām prioritātēm.Projekta ietvaros plānots īstenot šādas atbalstāmās aktivitātes:1.ēkas energosertikāta izstrāde2. būvniecības ieceres dokumentācijas izstrāde; pagaidu energosertikāta izstrāde;3.Būvdarbi, kas attiecināmi uz energoefektivitātes paaugstināšanu:3.1. fasādes siltināšana;3.2.cokola sienu siltināšana;3.3. bēniņu pārseguma papildus siltināšana;3.4. esošo logu nomaiņa pret siltumnorīgākiem;3.5. ārdurvju nomaiņa.4. Būvdarbi, kas attiecināmi uz ēkas tehnisko sistēmu uzlabošanu:4.1.divcauruļu apkures sistēmas izveide;4.2. jauna centrālapkures katla uzstādīšana;4.3. katlu telpas un kurināmā noliktavas izbūve;4.4. siltumapgādes pievada izbūve;4.5. katlu telpas elektroapgādes, ūdensapgādes un un kanalizācijas pievadu izbūve.5. Ēkas kosmētiskā remonta darbi un teritorijas labiekārtošanas darbi (iekļaujami, kā neattiecināmās izmaksas)5.1. zāles kosmētiskais remonts;5.2. teritorijas labiekārtošanas darbi;5.3. fasādes apgaismojuma izbūves darbi.6. Būvuzraudzība;7.Autoruzraudzība;8.Publicitātes pasākumi;9.Monitoringa veikšana pēc projekta realizācijas.Lai pēc energoefektivitātes darbu pabeigšanas, ēkas iekšpuse un apkārtne atbilstu sabiedriskās ēkas statusam, būtu estētika un funkcionāla, tiks veikti arī iekštelpu kosmētiskā remonta un ēkai piegulošās teritorijas labiekārtošanas darbi, kas projektā iekļaujamas kā papildus veicamie darbi. Kā arī papildus nepieciešams izbūvēt atsevišķi stāvošu katlu māju ar kurināmā noliktavu un pievedtīklus.Projekta rezultātā tiks samazināts primārās enerģijas patēriņš par 60.46%, kā arī kopējais projekta oglekļa dioksīda emisijas apjoms par 67.48%. Galvenie ieguvēji un labuma guvēji, primāri, ir pašvaldība, kurai tiks samazinātas sabiedriskās ēkas Skolas ielā 4, Apē ekspluatācijas izmaksas turpmākos gados, radīta siltumenerģijas ekonomija un sekundāri, tie ir pašvaldības iedzīvotāji, kas projekta rezultātus izjutīs vistiešākajā veidā: samazināsies apkures radīto dūmgāzes piesārņojuma apjoms pilsētā, ievērojami uzlabosies temperatūras līmenis ēkā, kas radīs patīkamu un komfortablu uzturēšanos tajā, kā arī uzlabotais apkārtējais vides un iekštelpu estētiskais veidols veidos gandarījumu un lepnumu par savu piederību novadam. Projekta kopējās izmaksas ir EUR 507 322,01, no tā attiecināmās 330 470,21 EUR, neattiecināmās izmaksas 176 851,80 EUR”.Attiecināmas izmaksas sadalās - ERAF finansējums 159 318.00 EUR, valsts budžeta dotācija pašvaldībām 8 434.53 EUR, pašvaldības finansējums sastāda 162 717.68 EUR. Pašvaldības finansējuma pieaugums saistīts ar apstākli, ka apkures katlu un kurināmā noliktavu nebija iespējams izvietot esošā ēkā, bija nepieciešams būvēt atsevišķu ēku un inženierpievadus.Neattiecināmās izmaksās iekļauti galveno telpu kosmētiskā remonta darbi, ēkas fasādes apgaismojuma darbi un teritorijas labiekārtošanas darbi, kurus pilnā apjomā finansēs pašvaldība no aizņēmuma līdzekļiem.Plānotais projekta ilgums – 13 mēneši. (Latvian)
0 references
The aim of the project is to reduce primary energy consumption by promoting energy efficiency and reduction of municipal expenditure on heating by investing in the building of the Ape People’s House and library, in accordance with the priorities set out in the local government development programme. Development of documentation of the construction plan; Development of a temporary energy supply system;3.Constructions related to energy efficiency improvement:3.1. Facade insulation; 3.2. school wall insulation;3.3. Additional insulation of attic cover;3.4. Replacement of existing windows with thermaler;3.5. Replacement of external doors.4. Construction works related to improvement of the technical systems of the building: 4.1. development of double-pipe heating system;4.2. Installation of a new central heating boiler;4.3. Construction of boiler room and fuel warehouse;4.4. Construction of a heat supply;4.5. Construction of power supply, water supply and sewers in the boiler room.5. Cosmetic repair works of the building and territory improvement works (included, as ineligible costs)5.1 cosmetic repair of the hall;5.2. territory improvement works; 5.3. facade lighting construction works.6. Construction supervision;7.Authority supervision;8.Publicity measures;9.Monitoring after the completion of the project.In order to conform to the status of public building, after completion of the energy efficiency works, the interior and surroundings of the building would be aesthetic and functional, as well as cosmetic renovation of the indoor premises and improvement of the territory adjacent to the building, which should be included as additional works to be carried out in the project. It is also necessary to build a separate boiler house with fuel storage and feeder networks.As a result of the project, primary energy consumption will be reduced by 60.46 %, as well as total carbon dioxide emissions of the project by 67.48 %. The main beneficiaries and beneficiaries are, primarily, the municipality, which will reduce the operating costs of the public buildings at 4 Skolas Street, Ape in the coming years, create thermal energy savings and secondary, they are residents of the municipality, who will experience the project results in the most direct way: The amount of flue gas pollution caused by heating will be reduced in the city, the temperature level of the building will improve significantly, which will result in a pleasant and comfortable stay, as well as the improved surrounding and indoor aesthetic appearance will create satisfaction and pride in its belonging to the county. The total cost of the project is EUR 507 322.01, of which eligible EUR 330470,21, ineligible costs EUR 176851,80.The eligible costs are divided – ERDF financing EUR 159318.00, state budget grant to municipalities EUR 8434.53, municipal funding is EUR 162717.68. Increase of municipal funding is due to the fact that the boiler and fuel storage could not be located in the existing building, it was necessary to build separate building and engineering cables.Ineligible costs include the cost of the main premises, the cost of the building, the total amount of the building and fuel storage. (English)
15 July 2021
0 references
L’objectif du projet est de réduire la consommation d’énergie primaire en contribuant à l’amélioration de l’efficacité énergétique et à la réduction des dépenses des collectivités locales pour le chauffage en investissant dans la construction de la Maison populaire et de la Bibliothèque des Singes, conformément aux priorités définies dans le programme de développement des collectivités locales. élaboration d’une documentation sur les intentions de construction; développement temporaire de la performance énergétique;3.Travaux de construction imputables à l’efficacité énergétique paaugstināšanu:3.1. isolation de façade;3.2.isolation murale de laola;3.3. isolation supplémentaire de la division des greniers;3.4. remplacement des fenêtres existantes pour l’inflammation thermique;3.5. remplacement des portes extérieures.4. Travaux de construction imputables au système technique du bâtiment uzlabošanu:4.1.divcauruļu système de chauffage;4.2. installation d’une nouvelle chaudière de chauffage central;4.3. construction d’une chaufferie et d’un entrepôt de combustible4.4. construction de l’alimentation en chaleur;4.5. construction de l’alimentation électrique de la chaufferie, de l’approvisionnement en eau et des conduites d’assainissement.5. Travaux de réparation cosmétique des travaux de construction et d’amélioration du territoire (inclus dans les coûts non admissibles)5.1. Réparation esthétique du hall;5.2. travaux d’amélioration du territoire;5.3 travaux de construction d’éclairage de façade.6. Supervision de la construction;7.Suivi de la collecte;8.Mesures de publicité;9. Exécution du suivi après la mise en œuvre du projet.Afin d’être esthétique et fonctionnel après l’achèvement des travaux d’efficacité énergétique, l’intérieur et l’environnement du bâtiment seraient esthétiques et fonctionnels, la réparation et l’amélioration esthétiques intérieures du territoire adjacent au bâtiment, qui devraient être incluses dans les travaux supplémentaires à réaliser dans le projet. En outre, il est nécessaire de construire une chaufferie autonome avec des réseaux de stockage et d’approvisionnement en combustible. Grâce au projet, la consommation d’énergie primaire sera réduite de 60,46 %, ainsi que la quantité totale d’émissions de dioxyde de carbone du projet de 67,48 %. Les principaux bénéficiaires et bénéficiaires sont, en premier lieu, la municipalité, qui réduira les coûts d’exploitation du bâtiment public à Skolas iela 4, Ape dans les années à venir, l’économie de l’énergie thermique et secondaire, les habitants de la commune, qui connaîtront les résultats du projet de la manière la plus directe: la pollution par les gaz résiduaires causée par le chauffage dans la ville sera réduite, le niveau de température du bâtiment s’améliorera considérablement, ce qui créera un séjour agréable et confortable, ainsi que l’amélioration de la forme esthétique de l’environnement et de l’intérieur créera la satisfaction et la fierté de son appartenance au comté. Le coût total du projet s’élève à 507 322,01 EUR, dont 330 470,21 EUR éligibles, 176 851,80 EUR. Les coûts éligibles sont partagés: 159 318,00 EUR de financement du FEDER, 8 434,53 EUR pour le budget de l’État aux municipalités, 162 717,68 EUR pour les collectivités locales. L’augmentation du financement municipal est due au fait qu’il n’a pas été possible de placer une chaudière et un stockage de combustible dans un bâtiment existant, les coûts inéligibles comprennent les travaux de réparation cosmétique des locaux principaux, les travaux d’éclairage de façade et les travaux d’amélioration du territoire, qui seront intégralement financés par l’administration locale sur les fonds empruntés. La durée prévue du projet est de 13 mois. (French)
25 November 2021
0 references
Ziel des Projekts ist es, den Primärenergieverbrauch zu senken, indem zur Verbesserung der Energieeffizienz und zur Verringerung der Heizkosten der lokalen Regierung beigetragen wird, indem Investitionen in den Bau des Volkshauses und der Affenbibliothek entsprechend den im Entwicklungsprogramm der lokalen Gebietskörperschaften festgelegten Prioritäten getätigt werden. Entwicklung der Dokumentation der Bauabsichten; vorübergehende Entwicklung der Gesamtenergieeffizienz;3.Bauarbeiten aufgrund der Energieeffizienz paaugstināšanu:3.1. Fassadendämmung;3.2.Cola Wanddämmung;3.3. zusätzliche Isolierung des Dachbodens;3.4. Austausch vorhandener Fenster zur Wärmeentzündung;3.5. Austausch von Außentüren.4. Bauarbeiten, die dem technischen System des Gebäudes uzlabošanu:4.1.divcauruļu zuzurechnen sind;4.2. Einbau eines neuen Zentralheizungskessels;4.3. Bau eines Kesselraums und eines Brennstofflagers;4.4. Bau der Wärmeversorgung;4.5. Bau des Kesselraums Stromversorgung, Wasserversorgung und Kanalisation Rohre.5. Kosmetische Reparaturarbeiten des Gebäudes und Gebietsverbesserungsarbeiten (inklusive nicht förderfähiger Kosten)5.1. kosmetische Reparatur der Halle;5.2. Geländeverbesserungsarbeiten;5.3 Fassadenbeleuchtungsarbeiten.6. Bauaufsicht;7. Sammlungsüberwachung;8.Publikationsmaßnahmen;9. Durchführung der Überwachung nach der Durchführung des Projekts.Um ästhetisch und funktional nach Abschluss der Energieeffizienzarbeiten zu sein, wäre das Innere und die Umgebung des Gebäudes ästhetisch und funktional, die Innen- und Umgebung des Gebäudes wäre auch die kosmetische Innenreparatur und Verbesserung des an das Gebäude angrenzenden Gebiets, die als zusätzliche Arbeiten in das Projekt einbezogen werden sollten. Darüber hinaus ist es notwendig, ein eigenständiges Kesselhaus mit Brennstoffspeicher- und -versorgungsnetzen zu bauen. Durch das Projekt wird der Primärenergieverbrauch um 60,46 % sowie die Gesamtmenge der Kohlendioxidemissionen des Projekts um 67,48 % gesenkt. Die wichtigsten Begünstigten und Begünstigten sind in erster Linie die Gemeinde, die die Betriebskosten des öffentlichen Gebäudes in Skolas iela 4, Ape in den kommenden Jahren, die Wirtschaft der thermischen Energie und sekundäre, die Einwohner der Gemeinde, die die Ergebnisse des Projekts auf die direkteste Weise erleben wird, verringern wird: die Menge der Abgasverschmutzung durch Heizung in der Stadt wird reduziert werden, das Temperaturniveau des Gebäudes wird deutlich verbessern, was einen angenehmen und komfortablen Aufenthalt in ihm schaffen wird, sowie die verbesserte ökologische und innere ästhetische Form wird Zufriedenheit und Stolz in seiner Zugehörigkeit zu der Grafschaft schaffen. Die Gesamtkosten des Projekts belaufen sich auf 507 732,01 EUR, wovon die förderfähigen 330 470,21 EUR, nicht förderfähige Kosten 176 851,80 EUR. Zuschussfähige Kosten werden geteilt – EFRE-Mittel 159 318,00 EUR, der staatliche Zuschuss an Gemeinden 8 434,53 EUR, die Finanzierung der lokalen Gebietskörperschaften beläuft sich auf 162 717,68 EUR. Die Erhöhung der kommunalen Finanzierung ist darauf zurückzuführen, dass es nicht möglich war, einen Kessel und eine Brennstoffspeicherung in einem bestehenden Gebäude zu platzieren. zu den nicht zuschussfähigen Kosten gehören kosmetische Reparaturarbeiten für die Hauptgebäude, Fassadenbeleuchtungsarbeiten und Gebietsverbesserungsarbeiten, die von der lokalen Regierung vollständig aus den Anleihemitteln finanziert werden. Die geplante Laufzeit des Projekts – 13 Monate. (German)
28 November 2021
0 references
Het doel van het project is het verminderen van het primaire energieverbruik door bij te dragen tot de verbetering van de energie-efficiëntie en de vermindering van de uitgaven van de lokale overheid voor verwarming door investeringen in de bouw van het Volkshuis en de bibliotheek van Apes overeenkomstig de prioriteiten van het ontwikkelingsprogramma van de lokale overheid. ontwikkeling van documentatie van bouwvoornemens; tijdelijke ontwikkeling van de energieprestatie;3.Bouwwerkzaamheden toe te schrijven aan energie-efficiëntie paaugstināšanu:3.1. gevelisolatie;3.2.Cola wandisolatie;3.3. extra isolatie van zolderdeling;3.4. vervanging van bestaande ramen voor hitteontsteking;3.5. vervanging van buitendeuren.4. Bouwwerkzaamheden toe te schrijven aan het technische systeem van het gebouw uzlabošanu:4.1.divcauruļu verwarmingssysteem;4.2. installatie van een nieuwe centrale verwarmingsketel;4.3. bouw van een ketelruimte en brandstofopslagplaats;4.4. bouw van de warmtevoorziening;4.5. bouw van de ketelruimte voeding, watervoorziening en riolering buizen.5. Cosmetische reparatie van de bouw- en gebiedsverbeteringswerkzaamheden (inbegrepen als niet-subsidiabele kosten)5.1. kosmetische reparatie van hal;5.2. gebiedsverbeteringswerkzaamheden;5.3 bouwwerkzaamheden voor gevelverlichting.6. Toezicht op de bouw;7.Collection supervisie;8. Publiciteitsmaatregelen;9. Prestaties van monitoring na de uitvoering van het project.Om esthetisch en functioneel te zijn na voltooiing van de energie-efficiëntiewerken, zou het interieur en de omgeving van het gebouw esthetisch en functioneel zijn, de binnenshuis cosmetische reparatie en verbetering van het gebied grenzend aan het gebouw zal ook worden uitgevoerd, die moeten worden opgenomen als extra werkzaamheden die in het project moeten worden uitgevoerd. Daarnaast is het noodzakelijk om een stand-alone ketelhuis te bouwen met brandstofopslag- en leveringsnetwerken. Als gevolg van het project zal het primaire energieverbruik met 60,46 % worden verminderd, evenals de totale hoeveelheid kooldioxide-emissies van het project met 67,48 %. De belangrijkste begunstigden en begunstigden zijn, in de eerste plaats, de gemeente, die de exploitatiekosten van het openbare gebouw aan Skolas iela 4, Ape in de komende jaren zal verminderen, de economie van thermische en secundaire energie, de inwoners van de gemeente, die de resultaten van het project op de meest directe manier zullen ervaren: de hoeveelheid afvalgasvervuiling veroorzaakt door verwarming in de stad zal worden verminderd, het temperatuurniveau van het gebouw zal aanzienlijk verbeteren, wat een aangenaam en comfortabel verblijf in het zal creëren, evenals de verbeterde milieu- en indoor esthetische vorm zal zorgen voor tevredenheid en trots op het behoren tot de provincie. De totale kosten van het project bedragen 507 322,01 EUR, waarvan de subsidiabele 330 470,21 EUR, niet-subsidiabele kosten 176 851,80 EUR". In aanmerking komende kosten worden gedeeld — EFRO-financiering 159 318,00 EUR, de overheidssubsidie aan gemeenten 8 434,53 EUR, lokale overheidsfinanciering bedraagt 162 717,68 EUR. De verhoging van de gemeentelijke financiering is te wijten aan het feit dat het niet mogelijk was een ketel en brandstofopslag in een bestaand gebouw te plaatsen, het was noodzakelijk om een afzonderlijk gebouw en technische apparatuur te bouwen. De niet-subsidiabele kosten omvatten cosmetische reparatiewerkzaamheden voor de hoofdgebouwen, gevelverlichtingswerken en territoriumverbeteringswerken, die volledig door de lokale overheid zullen worden gefinancierd uit de leningen. De geplande duur van het project — 13 maanden. (Dutch)
28 November 2021
0 references
L'obiettivo del progetto è ridurre il consumo di energia primaria contribuendo al miglioramento dell'efficienza energetica e alla riduzione della spesa delle amministrazioni locali per il riscaldamento effettuando investimenti nella costruzione della Casa del popolo e della biblioteca delle scimmie conformemente alle priorità stabilite nel programma di sviluppo delle amministrazioni locali. sviluppo della documentazione delle intenzioni costruttive; sviluppo temporaneo del rendimento energetico;3.Lavori di costruzione attribuibili all'efficienza energetica paaugstināšanu:3.1. isolamento della facciata;3.2.Cola isolamento della parete;3.3. isolamento supplementare della divisione sottotetto;3.4. sostituzione di finestre esistenti per l'infiammazione del calore; 3.5. sostituzione delle porte esterne.4. Lavori di costruzione attribuibili all'impianto tecnico dell'edificio uzlabošanu:4.1.divcauruļu impianto di riscaldamento;4.2. installazione di una nuova caldaia per il riscaldamento centrale;4.3. costruzione di un locale caldaia e di un magazzino combustibile;4.4. costruzione dell'alimentazione di calore;4.5. costruzione dell'alimentazione elettrica del locale caldaia, dell'approvvigionamento idrico e delle tubazioni fognarie.5. Lavori di riparazione cosmetica dell'edificio e dei lavori di miglioramento del territorio (compresi come costi non ammissibili)5.1. riparazione estetica della sala;5.2. lavori di miglioramento del territorio;5.3 lavori di illuminazione per facciate.6. Supervisione della costruzione;7. Vigilanza di raccolta;8.Misure di pubblica utilità;9. Effettuazione del monitoraggio dopo l'attuazione del progetto.Per essere estetici e funzionali dopo il completamento dei lavori di efficienza energetica, l'interno e l'ambiente dell'edificio sarebbero estetici e funzionali, anche la riparazione cosmetica interna e il miglioramento del territorio adiacente all'edificio, che dovrebbero essere inclusi come ulteriori lavori da svolgere nel progetto. Inoltre, è necessario costruire una caldaia indipendente con reti di stoccaggio e approvvigionamento di combustibile. In conseguenza del progetto, il consumo di energia primaria sarà ridotto del 60,46 %, nonché la quantità totale di emissioni di anidride carbonica del progetto del 67,48 %. I principali beneficiari e beneficiari sono, in primo luogo, il comune, che ridurrà i costi operativi dell'edificio pubblico di Skolas iela 4, Ape nei prossimi anni, l'economia dell'energia termica e secondaria, gli abitanti del comune, che sperimenteranno i risultati del progetto nel modo più diretto: la quantità di inquinamento da gas di scarico causato dal riscaldamento in città sarà ridotta, il livello di temperatura dell'edificio migliorerà significativamente, che creerà un soggiorno piacevole e confortevole in esso, così come la migliore forma estetica ambientale e interna creerà soddisfazione e orgoglio per la sua appartenenza alla contea. Il costo totale del progetto è di 507 222,01 EUR, di cui 330 470,21 EUR ammissibili, costi non ammissibili 176 851,80 EUR. I costi ammissibili sono condivisi — finanziamento FESR 159 318,00 EUR, la sovvenzione di bilancio dello Stato ai comuni 8 434,53 EUR, finanziamenti degli enti locali ammontano a 162 717,68 EUR. L'aumento dei finanziamenti comunali è dovuto al fatto che non è stato possibile collocare una caldaia e lo stoccaggio del combustibile in un edificio esistente, è stato necessario costruire un edificio separato e attrezzature di ingegneria. I costi non ammissibili comprendono lavori di riparazione estetica per i locali principali, opere di illuminazione delle facciate e lavori di miglioramento del territorio, che saranno finanziati interamente dal governo locale con i fondi di prestito. La durata prevista del progetto — 13 mesi. (Italian)
11 January 2022
0 references
Skolas iela 4, Ape, Smiltenes nov., LV-4337
0 references
Identifiers
4.2.2.0/17/I/083
0 references