Enhancement of energy efficiency in Daugavpils Stropu Primary School – Development Centre building – Mihoelsa iela 4, Daugavpils (Q3057127): Difference between revisions
Jump to navigation
Jump to search
(Created claim: summary (P836): Het doel van het project is het verminderen van het primaire energieverbruik door het bevorderen van energie-efficiëntie voor de bouw van Daugavpils Stropu Primary School — ontwikkelingscentrum — Mihoelsa Street 4, Daugavpils. Om het doel van het project te bereiken, zullen de volgende hoofdactiviteiten worden uitgevoerd in het ontwikkelingscentrum van Daugavpils Stropu Primary School — Mihoelsa Street 4, Daugavpils: 1) Isolatie van de gevel van...) |
(Changed label, description and/or aliases in it, and other parts: Adding Italian translations) |
||||||||||||||
label / it | label / it | ||||||||||||||
Miglioramento dell'efficienza energetica nella scuola elementare Daugavpils Stropu — edificio del centro di sviluppo — Mihoelsa Street 4, Daugavpils | |||||||||||||||
Property / summary | |||||||||||||||
L'obiettivo del progetto è quello di ridurre il consumo di energia primaria promuovendo l'efficienza energetica per la costruzione della scuola primaria Daugavpils Stropu — centro di sviluppo — Mihoelsa Street 4, Daugavpils. Al fine di raggiungere l'obiettivo del progetto, saranno svolte le seguenti attività principali nel centro di sviluppo della scuola primaria Daugavpils Stropu — Mihoelsa Street 4, Daugavpils: 1) Isolamento della facciata dell'edificio, compreso l'isolamento delle pareti esterne, sostituzione di finestre e porte, isolamento delle fondazioni di zoccoli, isolamento dei rivestimenti dei tetti esistenti, isolamento della copertura cava; 2) la ristrutturazione dell'impianto di ventilazione mediante l'installazione di un'unità di recupero; 3) la ricostruzione dell'impianto di riscaldamento; 4) l'installazione di apparecchi a LED a risparmio energetico;5) l'installazione di sistemi automatici di rivelazione e allarme antincendio, nonché l'illuminazione di evacuazione di emergenza;6) la garanzia dei requisiti di accessibilità ambientale;7) la supervisione dell'autore e la supervisione della costruzione;8) la pubblicità del progetto. In conseguenza dell'attuazione del progetto, il consumo di energia primaria sarà ridotto, contribuendo al miglioramento a lungo termine dell'efficienza energetica e alla riduzione delle spese di riscaldamento delle amministrazioni locali, i requisiti di efficienza energetica saranno raggiunti conformemente allo standard di costruzione lettone LBN 002-015 "Ingegneria termica degli involucri edilizi", così come l'oggetto sarà adattato alle persone con esigenze particolari, garantendo in tal modo l'accessibilità dell'ambiente. EUR 1.045.667,74 di cui fruibili: 396 650,21 di cui — 337 152,68 EUR — risorse del FESR (85 %);- 17 849,26 EUR — sovvenzione di bilancio dello Stato (4,50 %);- 41 648,27 EUR — fondi comunali (10,50 %).· non ammissibili: EUR 649017,53 costi, che non sono legati a misure per aumentare l'efficienza energetica. Si prevede che la durata del progetto sarà di 30 mesi dalla data di firma del contratto per la realizzazione del progetto. L'attuazione delle attività che saranno sostenute dal progetto è stato avviato il 17 agosto 2016, quando il contratto della Società n. D-2016/521 è stato firmato tra Daugavpils Comune e SIA "Kas siltēja" sullo sviluppo di un progetto di costruzione per l'oggetto di costruzione "Incremento dell'efficienza energetica dell'edificio del 2º istituto speciale di istruzione prescolare, garantendo requisiti di accessibilità ambientale — Mihoelsa iela 4, Davugapils". (Italian) | |||||||||||||||
Property / summary: L'obiettivo del progetto è quello di ridurre il consumo di energia primaria promuovendo l'efficienza energetica per la costruzione della scuola primaria Daugavpils Stropu — centro di sviluppo — Mihoelsa Street 4, Daugavpils. Al fine di raggiungere l'obiettivo del progetto, saranno svolte le seguenti attività principali nel centro di sviluppo della scuola primaria Daugavpils Stropu — Mihoelsa Street 4, Daugavpils: 1) Isolamento della facciata dell'edificio, compreso l'isolamento delle pareti esterne, sostituzione di finestre e porte, isolamento delle fondazioni di zoccoli, isolamento dei rivestimenti dei tetti esistenti, isolamento della copertura cava; 2) la ristrutturazione dell'impianto di ventilazione mediante l'installazione di un'unità di recupero; 3) la ricostruzione dell'impianto di riscaldamento; 4) l'installazione di apparecchi a LED a risparmio energetico;5) l'installazione di sistemi automatici di rivelazione e allarme antincendio, nonché l'illuminazione di evacuazione di emergenza;6) la garanzia dei requisiti di accessibilità ambientale;7) la supervisione dell'autore e la supervisione della costruzione;8) la pubblicità del progetto. In conseguenza dell'attuazione del progetto, il consumo di energia primaria sarà ridotto, contribuendo al miglioramento a lungo termine dell'efficienza energetica e alla riduzione delle spese di riscaldamento delle amministrazioni locali, i requisiti di efficienza energetica saranno raggiunti conformemente allo standard di costruzione lettone LBN 002-015 "Ingegneria termica degli involucri edilizi", così come l'oggetto sarà adattato alle persone con esigenze particolari, garantendo in tal modo l'accessibilità dell'ambiente. EUR 1.045.667,74 di cui fruibili: 396 650,21 di cui — 337 152,68 EUR — risorse del FESR (85 %);- 17 849,26 EUR — sovvenzione di bilancio dello Stato (4,50 %);- 41 648,27 EUR — fondi comunali (10,50 %).· non ammissibili: EUR 649017,53 costi, che non sono legati a misure per aumentare l'efficienza energetica. Si prevede che la durata del progetto sarà di 30 mesi dalla data di firma del contratto per la realizzazione del progetto. L'attuazione delle attività che saranno sostenute dal progetto è stato avviato il 17 agosto 2016, quando il contratto della Società n. D-2016/521 è stato firmato tra Daugavpils Comune e SIA "Kas siltēja" sullo sviluppo di un progetto di costruzione per l'oggetto di costruzione "Incremento dell'efficienza energetica dell'edificio del 2º istituto speciale di istruzione prescolare, garantendo requisiti di accessibilità ambientale — Mihoelsa iela 4, Davugapils". (Italian) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: L'obiettivo del progetto è quello di ridurre il consumo di energia primaria promuovendo l'efficienza energetica per la costruzione della scuola primaria Daugavpils Stropu — centro di sviluppo — Mihoelsa Street 4, Daugavpils. Al fine di raggiungere l'obiettivo del progetto, saranno svolte le seguenti attività principali nel centro di sviluppo della scuola primaria Daugavpils Stropu — Mihoelsa Street 4, Daugavpils: 1) Isolamento della facciata dell'edificio, compreso l'isolamento delle pareti esterne, sostituzione di finestre e porte, isolamento delle fondazioni di zoccoli, isolamento dei rivestimenti dei tetti esistenti, isolamento della copertura cava; 2) la ristrutturazione dell'impianto di ventilazione mediante l'installazione di un'unità di recupero; 3) la ricostruzione dell'impianto di riscaldamento; 4) l'installazione di apparecchi a LED a risparmio energetico;5) l'installazione di sistemi automatici di rivelazione e allarme antincendio, nonché l'illuminazione di evacuazione di emergenza;6) la garanzia dei requisiti di accessibilità ambientale;7) la supervisione dell'autore e la supervisione della costruzione;8) la pubblicità del progetto. In conseguenza dell'attuazione del progetto, il consumo di energia primaria sarà ridotto, contribuendo al miglioramento a lungo termine dell'efficienza energetica e alla riduzione delle spese di riscaldamento delle amministrazioni locali, i requisiti di efficienza energetica saranno raggiunti conformemente allo standard di costruzione lettone LBN 002-015 "Ingegneria termica degli involucri edilizi", così come l'oggetto sarà adattato alle persone con esigenze particolari, garantendo in tal modo l'accessibilità dell'ambiente. EUR 1.045.667,74 di cui fruibili: 396 650,21 di cui — 337 152,68 EUR — risorse del FESR (85 %);- 17 849,26 EUR — sovvenzione di bilancio dello Stato (4,50 %);- 41 648,27 EUR — fondi comunali (10,50 %).· non ammissibili: EUR 649017,53 costi, che non sono legati a misure per aumentare l'efficienza energetica. Si prevede che la durata del progetto sarà di 30 mesi dalla data di firma del contratto per la realizzazione del progetto. L'attuazione delle attività che saranno sostenute dal progetto è stato avviato il 17 agosto 2016, quando il contratto della Società n. D-2016/521 è stato firmato tra Daugavpils Comune e SIA "Kas siltēja" sullo sviluppo di un progetto di costruzione per l'oggetto di costruzione "Incremento dell'efficienza energetica dell'edificio del 2º istituto speciale di istruzione prescolare, garantendo requisiti di accessibilità ambientale — Mihoelsa iela 4, Davugapils". (Italian) / qualifier | |||||||||||||||
point in time: 11 January 2022
|
Revision as of 10:05, 11 January 2022
Project Q3057127 in Latvia
Language | Label | Description | Also known as |
---|---|---|---|
English | Enhancement of energy efficiency in Daugavpils Stropu Primary School – Development Centre building – Mihoelsa iela 4, Daugavpils |
Project Q3057127 in Latvia |
Statements
334,150.32 Euro
0 references
393,118.02 Euro
0 references
85.0 percent
0 references
18 July 2018
0 references
17 January 2021
0 references
DAUGAVPILS PILSĒTAS DOME
0 references
Projekta mērķis – samazināt primārās enerģijas patēriņu, sekmējot energoefektivitātes paaugstināšanu Daugavpils Stropu pamatskolas - attīstības centra ēkai - Mihoelsa ielā 4, Daugavpilī. Lai sasniegtu projekta mērķi, Daugavpils Stropu pamatskolas - attīstības centrā – Mihoelsa ielā 4, Daugavpilī, tiks veiktas sekojošas galvenās aktivitātes:1) ēkas fasādes siltināšana t.sk. ārsienu siltināšana, logu un durvju nomaiņa, cokola pamatu siltināšana, esoša jumta pārseguma siltināšana, pagrāba pārseguma siltināšana;2) ventilācijas sistēmas atjaunošana uzstādot rekuperācijas iekārtu;3) siltumapgādes sistēmas rekonstrukcija;4) enerģiju taupošu LED gaismekļu uzstādīšana;5) automātiskās ugunsgrēka atklāšanas un trauksmes signalizācijas sistēmas, kā arī evakuācijas avārijas apgaismes ierīkošana;6) vides pieejamības prasību nodrošināšana;7) autoruzraudzība un būvuzraudzība;8) projekta publicitāte.Projekta realizācijas rezultātā tiks samazināts primārās enerģijas patēriņš, sekmējot ilgtermiņā energoefektivitātes paaugstināšanu un pašvaldības izdevumu samazināšanos par siltumapgādi, tiks sasniegtas energoefektivitātes prasības atbilstoši Latvijas būvnormatīvā LBN 002-015 “Ēku norobežojošo konstrukciju siltumtehnika”, kā arī objekts tiks pielāgots personām ar īpašām vajadzībām, tādējādi nodrošinot vides pieejamību.Projekta kopējās izmaksas: 1 045 667.74 EURtai skaitā · attiecināmās: 396 650.21 no tām- 337152.68 EUR – ERAF līdzekļi (85%);- 17849.26 EUR – valsts budžeta dotācija (4.50%);- 41648.27 EUR– pašvaldības līdzekļi (10.50%).· neattiecināmās: 649 017.53 EUR izmaksas, kas nav saistītas ar energoefektivitāti paaugstinošiem pasākumiem.Paredzēts, ka projekta ilgums būs 30 mēneši no līguma par projekta īstenošanu parakstīšanas dienas.Projekta atbalstāmo darbību īstenošana ir uzsākta 2016.gada 17.augustā, kad tika parakstīts Uzņēmuma līgums Nr. D-2016/521 starp Daugavpils pilsētas domi un SIA “Ēkas siltināšana” par būvprojekta izstrādi būvobjektam „2.speciālās pirmsskolas izglītības iestādes ēkas energoefektivitātes paaugstināšana, vides pieejamības prasību nodrošināšana – Mihoelsa iela 4, Daugavpilī”. (Latvian)
0 references
The aim of the project is to reduce primary energy consumption by promoting energy efficiency improvement of Daugavpils Stropu Primary School – Development Centre building – Mihoelsa iela 4, Daugavpils. In order to achieve the project goal, Daugavpils Stropu Elementary School – development centre – Mihoelsa street 4, Daugavpils main activities will be carried out: 1) insulation of the facade of the building including insulation of exterior walls, replacement of windows and doors, insulation of the base of the cap, existing roof cover insulation, the energy efficiency of the existing roof protection in the long term will be achieved, thus making the building cover insulation;2) restoration of ventilation system installing the recuperation unit;3) the installation of electric efficiency of the heating system; 5) the energy efficiency reduction of the building in the long term will be reduced) the energy requirements of the building will be reduced in the long term.Unsuperficiary requirements of the building with heat cover insulation;2) restoration of ventilation system installing recuperation unit;3) heating system reconstruction, and the energy efficiency reduction of the electric energy system will be applied in the long term; 4) the installation of the electric energy system in accordance with the requirements of the building.2) Restoration of the ventilation system by installing recuperation equipment; 3) Eat the energy efficiency reduction of the building in the long term will be reduced by the energy efficiency reduction of the building.4) The restoration of ventilation system by installing the recuperation equipment;3) the reconstruction of the heating system in accordance with the installation of the electric energy efficiency of the building system will be reduced in the long term; 4) the installation of the electric power supply system will be applied in accordance with the requirements of the building.2) Restoration of ventilation system by installing recuperation equipment; 3) Installation of the heating system in accordance with the requirements of the building will be made in order to achieve the goal of the project: 1) Insulation of the facade of the building, including insulation of exterior walls, replacement of windows and doors, insulation of the bases of the coat, insulation of the existing roof cover in the long term, the energy efficiency of the existing roof, in the long-term use of the building, in order to provide heat cover insulation; 2) The restoration of ventilation system by installing a recuperation unit; 3) the heating of the heating system in accordance with the requirements of the building will be reduced as well as energy efficiency reduction of the energy system in the long term will be applied to ensure the thermal insulation of the facade of the building including insulation of external walls, replacement of windows and doors, insulation of the bases of the basement of the base of the basement, insulation of existing roof covering, etc.; Insulating of external walls, replacement of windows and doors, the insulation of the base of the base of the cape, the existing roof cover insulation, in a way the overall requirements of the building will be reduced in the long term, the energy efficiency requirements of the building with the heat insulation of the buildings; 2) Restoration of ventilation system by installing the recuperation equipment;3) the heating of the heating system as the object of the heating system; 5) the energy efficiency reduction of the building will be reduced as well as the energy efficiency reduction of the building.Under the requirements of the building will be reduced by the installation of thermal insulation of external walls, the replacement of windows and doors, the insulation of the base of the base of the base of the base, as well as the energy efficiency reduction of the existing roof covering, in the long term, with the 1 045 667.74 of which: 396 650.21 of them – EUR 337152.68 – ERDF funds (85 %);- EUR 17849.26 – state budget grant (4.50 %);- EUR 41648.27 – municipal funds (10.50 %).· Ineligible: It is planned that the project will last 30 months from the date of signing of the contract for project implementation.The implementation of the project’s supported activities has been started on August 17, 2016, when the Company Agreement No. D-2016/521 between Daugavpils City Council and SIA “Building Insulation” for the construction object “Enhancing energy efficiency of 2 special pre-school educational establishment building, ensuring environmental accessibility requirements – Mihoelsa iela 4, Daugavpils” was signed. (English)
15 July 2021
0 references
L’objectif du projet est de réduire la consommation d’énergie primaire en promouvant l’efficacité énergétique pour la construction de l’école primaire Daugavpils Stropu — centre de développement — Mihoelsa Street 4, Daugavpils. Afin d’atteindre l’objectif du projet, les principales activités suivantes seront menées dans le centre de développement de l’école primaire Daugavpils Stropu — rue Mihoelsa 4, Daugavpils: 1) l’isolation de la façade du bâtiment, y compris l’isolation des murs extérieurs, le remplacement des fenêtres et des portes, l’isolation des fondations de socles, l’isolation des revêtements de toiture existants, l’isolation du couvercle creux; 2) la rénovation du système de ventilation par l’installation d’une unité de récupération; 3) la reconstruction du système de chauffage; 4) l’installation de luminaires LED économes en énergie; 5) l’installation de systèmes automatiques de détection d’incendie et d’alarme, ainsi que l’éclairage d’évacuation d’urgence;6) la garantie des exigences en matière d’accessibilité environnementale; 7) la supervision de l’auteur et la supervision de la construction;8) la publicité du projet. 1 045 667,74 EUR dont· éligibles: 396 650,21 EUR — 337 152,68 EUR — ressources du FEDER (85 %);- 17 849,26 EUR — Subvention du budget de l’État (4,50 %);- 41 648,27 EUR — Fonds municipaux (10,50 %).· inéligibles: 649 017,53 EUR, qui ne sont pas liés à des mesures d’amélioration de l’efficacité énergétique. Il est prévu que la durée du projet sera de 30 mois à compter de la date de signature du contrat de mise en œuvre du projet. La mise en œuvre des activités à soutenir par le projet a débuté le 17 août 2016, lorsque le contrat de la Société no D-2016/521 a été signé entre le conseil municipal de Daugavpils et SIA «'kas siltēja» sur le développement d’un projet de construction pour l’objet de construction «Amélioration de l’efficacité énergétique de la construction de la 2e institution spéciale d’éducation préscolaire, assurant les exigences en matière d’accessibilité environnementale — Mihoelsa iela 4, Daugavils». (French)
25 November 2021
0 references
Ziel des Projekts ist es, den Primärenergieverbrauch durch Förderung der Energieeffizienz für den Bau der Grundschule Daugavpils Stropu – Entwicklungszentrum – Mihoelsa Street 4, Daugavpils, zu senken. Um das Ziel des Projekts zu erreichen, werden die folgenden Hauptaktivitäten im Entwicklungszentrum von Daugavpils Stropu Primary School – Mihoelsa Street 4, Daugavpils durchgeführt: 1) Isolierung der Fassade des Gebäudes, einschließlich Isolierung von Außenwänden, Austausch von Fenstern und Türen, Isolierung von Sockelfundamenten, Isolierung bestehender Dachbeläge, Isolierung der Hohldecke; 2) Renovierung des Lüftungssystems durch Installation einer Rückgewinnungseinheit; 3) Rekonstruktion des Heizsystems; 4) Installation energiesparender LED-Leuchten;5) Installation von automatischen Brandmelde- und Alarmanlagen sowie Notevakuierungsbeleuchtung;6) Gewährleistung der Anforderungen an die Zugänglichkeit der Umwelt;7) Überwachung und Bauüberwachung;8) Öffentlichkeitsarbeit des Projekts. Als Ergebnis der Projektdurchführung wird der Primärenergieverbrauch reduziert, was zur langfristigen Verbesserung der Energieeffizienz und zur Verringerung der kommunalen Ausgaben für die Wärmeversorgung beiträgt, die Energieeffizienzanforderungen werden in Übereinstimmung mit dem lettischen Baustandard LBN 002-015 „Thermal Engineering of Building envelopes“ erreicht, und das Objekt wird an Personen mit besonderen Bedürfnissen angepasst und somit die Zugänglichkeit der Umwelt gewährleistet. 1 045 667,74 EUR davon förderfähig: 396 650,21 davon – 337 152,68 EUR – EFRE-Mittel (85 %);- 17 849,26 EUR – staatliche Zuschüsse (4,50 %);- 41 648,27 EUR – kommunale Mittel (10,50 %).· nicht förderfähig: 649 017,53 EUR Kosten, die nicht mit Maßnahmen zur Steigerung der Energieeffizienz zusammenhängen. Es ist vorgesehen, dass die Laufzeit des Projekts 30 Monate ab dem Tag der Unterzeichnung des Vertrags über die Durchführung des Projekts beträgt. Die Durchführung der durch das Projekt zu unterstützenden Aktivitäten wurde am 17. August 2016 begonnen, als der Vertrag Nr. D-2016/521 zwischen Daugavpils Stadtrat und SIA „kas siltēja“ über die Entwicklung eines Bauvorhabens für das Bauobjekt „Erhöhung der Energieeffizienz des Gebäudes der 2. Sonderschule für Vorschulbildung, Sicherstellung der Umweltanforderungen – Mihoelsa iela 4, Dahoelsa iela 4, Dahoelsa iela 4, Dahoelsa iela 4, Dahoelsa iela 4, Daavpils“ unterzeichnet wurde. (German)
28 November 2021
0 references
Het doel van het project is het verminderen van het primaire energieverbruik door het bevorderen van energie-efficiëntie voor de bouw van Daugavpils Stropu Primary School — ontwikkelingscentrum — Mihoelsa Street 4, Daugavpils. Om het doel van het project te bereiken, zullen de volgende hoofdactiviteiten worden uitgevoerd in het ontwikkelingscentrum van Daugavpils Stropu Primary School — Mihoelsa Street 4, Daugavpils: 1) Isolatie van de gevel van het gebouw, met inbegrip van isolatie van buitenmuren, vervanging van ramen en deuren, isolatie van plint funderingen, isolatie van bestaande dakbedekkingen, isolatie van de holle afdekking; 2) renovatie van het ventilatiesysteem door installatie van een recuperatie-eenheid; 3) reconstructie van het verwarmingssysteem; 4) installatie van energiebesparende LED-armaturen;5) installatie van automatische branddetectie- en alarmalarmsystemen, evenals noodevacuatieverlichting; 6) het waarborgen van milieutoegankelijkheidseisen;7) auteurstoezicht en toezicht op de bouw;8) publiciteit van het project. Als gevolg van de uitvoering van het project zal het primaire energieverbruik worden verminderd, wat bijdraagt tot de langetermijnverbetering van de energie-efficiëntie en de vermindering van de uitgaven van lokale overheden voor de verwarmingsvoorziening; de energie-efficiëntie-eisen zullen worden bereikt in overeenstemming met de Letse bouwnorm LBN 002-015 „Thermal engineering of building envelopes”, en het object zal worden aangepast aan personen met bijzondere behoeften, zodat de toegankelijkheid van het milieu wordt gewaarborgd. EUR 1.045.667,74 waarvan subsidiabel: 396 650,21 waarvan — 337 152,68 EUR — EFRO-middelen (85 %);- 17 849,26 EUR — subsidie uit de overheidsbegroting (4,50 %);- 41 648,27 EUR- gemeentelijke middelen (10,50 %).· niet-subsidiabel: 649 017,53 EUR kosten, die geen verband houden met maatregelen om de energie-efficiëntie te verhogen. Het is de bedoeling dat de duur van het project 30 maanden zal zijn vanaf de datum van ondertekening van het contract voor de uitvoering van het project. De uitvoering van de door het project te ondersteunen activiteiten is gestart op 17 augustus 2016, toen het bedrijfscontract nr. D-2016/521 werd ondertekend tussen de gemeenteraad van Daugavpils en SIA „-kas siltēja” over de ontwikkeling van een bouwproject voor het bouwobject „Verhoging van de energie-efficiëntie van het gebouw van de 2e speciale onderwijsinstelling voor kleuteronderwijs, waarbij de milieutoegankelijkheidseisen worden gewaarborgd — Mihoelsa iela 4, Daugavpils”. (Dutch)
28 November 2021
0 references
L'obiettivo del progetto è quello di ridurre il consumo di energia primaria promuovendo l'efficienza energetica per la costruzione della scuola primaria Daugavpils Stropu — centro di sviluppo — Mihoelsa Street 4, Daugavpils. Al fine di raggiungere l'obiettivo del progetto, saranno svolte le seguenti attività principali nel centro di sviluppo della scuola primaria Daugavpils Stropu — Mihoelsa Street 4, Daugavpils: 1) Isolamento della facciata dell'edificio, compreso l'isolamento delle pareti esterne, sostituzione di finestre e porte, isolamento delle fondazioni di zoccoli, isolamento dei rivestimenti dei tetti esistenti, isolamento della copertura cava; 2) la ristrutturazione dell'impianto di ventilazione mediante l'installazione di un'unità di recupero; 3) la ricostruzione dell'impianto di riscaldamento; 4) l'installazione di apparecchi a LED a risparmio energetico;5) l'installazione di sistemi automatici di rivelazione e allarme antincendio, nonché l'illuminazione di evacuazione di emergenza;6) la garanzia dei requisiti di accessibilità ambientale;7) la supervisione dell'autore e la supervisione della costruzione;8) la pubblicità del progetto. In conseguenza dell'attuazione del progetto, il consumo di energia primaria sarà ridotto, contribuendo al miglioramento a lungo termine dell'efficienza energetica e alla riduzione delle spese di riscaldamento delle amministrazioni locali, i requisiti di efficienza energetica saranno raggiunti conformemente allo standard di costruzione lettone LBN 002-015 "Ingegneria termica degli involucri edilizi", così come l'oggetto sarà adattato alle persone con esigenze particolari, garantendo in tal modo l'accessibilità dell'ambiente. EUR 1.045.667,74 di cui fruibili: 396 650,21 di cui — 337 152,68 EUR — risorse del FESR (85 %);- 17 849,26 EUR — sovvenzione di bilancio dello Stato (4,50 %);- 41 648,27 EUR — fondi comunali (10,50 %).· non ammissibili: EUR 649017,53 costi, che non sono legati a misure per aumentare l'efficienza energetica. Si prevede che la durata del progetto sarà di 30 mesi dalla data di firma del contratto per la realizzazione del progetto. L'attuazione delle attività che saranno sostenute dal progetto è stato avviato il 17 agosto 2016, quando il contratto della Società n. D-2016/521 è stato firmato tra Daugavpils Comune e SIA "Kas siltēja" sullo sviluppo di un progetto di costruzione per l'oggetto di costruzione "Incremento dell'efficienza energetica dell'edificio del 2º istituto speciale di istruzione prescolare, garantendo requisiti di accessibilità ambientale — Mihoelsa iela 4, Davugapils". (Italian)
11 January 2022
0 references
Mihoelsa iela 4, Daugavpils, LV-5401
0 references
Identifiers
4.2.2.0/17/I/062
0 references