REQUEST FOR FUNDING ROP ERDF 2014-2020 FOR THE ESTABLISHMENT OF CYCLOPEDESTRIAN CONNECTIONS IN VIALE LOMBARDIA/FIRST FUNCTIONAL BATCH NORTH/SOUTH CONNECTION — LINKS BETWEEN EXISTING PEDESTRIAN ROUTES WITH METRO STATIONS M2. IMPLEMENTATION OF PGTU AND PGT (Q2040961): Difference between revisions
Jump to navigation
Jump to search
(Changed label, description and/or aliases in nl, and other parts: Adding Dutch translations) |
(Changed label, description and/or aliases in de, and other parts: Adding German translations) |
||||||||||||||
label / de | label / de | ||||||||||||||
ANTRAG AUF FÖRDERUNG DES EFRE 2014-2020 FÜR DEN BAU VON RADWEGEN IN VIALE LOMBARDIA/ERSTE FUNKTIONALE LOTVERBINDUNG NORD/SÜD – VERBINDUNGEN ZWISCHEN DEN BESTEHENDEN RADWEGEN UND DEN STATIONEN DER U-BAHN-LINIE M2 UMSETZUNG VON PGTU- UND PGT-PROGNOSEN. | |||||||||||||||
Property / summary | |||||||||||||||
ANTRAG AUF FÖRDERUNG DES EFRE 2014-2020 FÜR DEN BAU VON RADWEGEN IN VIALE LOMBARDIA/ERSTE FUNKTIONALE LOTVERBINDUNG NORD/SÜD – VERBINDUNGEN ZWISCHEN DEN BESTEHENDEN RADWEGEN UND DEN STATIONEN DER U-BAHN-LINIE M2 UMSETZUNG VON PGTU- UND PGT-PROGNOSEN. (German) | |||||||||||||||
Property / summary: ANTRAG AUF FÖRDERUNG DES EFRE 2014-2020 FÜR DEN BAU VON RADWEGEN IN VIALE LOMBARDIA/ERSTE FUNKTIONALE LOTVERBINDUNG NORD/SÜD – VERBINDUNGEN ZWISCHEN DEN BESTEHENDEN RADWEGEN UND DEN STATIONEN DER U-BAHN-LINIE M2 UMSETZUNG VON PGTU- UND PGT-PROGNOSEN. (German) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: ANTRAG AUF FÖRDERUNG DES EFRE 2014-2020 FÜR DEN BAU VON RADWEGEN IN VIALE LOMBARDIA/ERSTE FUNKTIONALE LOTVERBINDUNG NORD/SÜD – VERBINDUNGEN ZWISCHEN DEN BESTEHENDEN RADWEGEN UND DEN STATIONEN DER U-BAHN-LINIE M2 UMSETZUNG VON PGTU- UND PGT-PROGNOSEN. (German) / qualifier | |||||||||||||||
point in time: 24 December 2021
|
Revision as of 11:21, 24 December 2021
Project Q2040961 in Italy
Language | Label | Description | Also known as |
---|---|---|---|
English | REQUEST FOR FUNDING ROP ERDF 2014-2020 FOR THE ESTABLISHMENT OF CYCLOPEDESTRIAN CONNECTIONS IN VIALE LOMBARDIA/FIRST FUNCTIONAL BATCH NORTH/SOUTH CONNECTION — LINKS BETWEEN EXISTING PEDESTRIAN ROUTES WITH METRO STATIONS M2. IMPLEMENTATION OF PGTU AND PGT |
Project Q2040961 in Italy |
Statements
402,626.0 Euro
0 references
805,252.0 Euro
0 references
50.0 percent
0 references
30 June 2016
0 references
30 December 2019
0 references
COLOGNO MONZESE
0 references
Q260062 (Deleted Item)
0 references
RICHIESTA FINANZIAMENTI POR FESR 2014-2020 PER LA REALIZZAZIONE DI COLLEGAMENTI CICLOPEDONALI IN VIALE LOMBARDIA / PRIMO LOTTO FUNZIONALE CONNESSIONE NORD/SUD - COLLEGAMENTI TRA GLI ESISTENTI PERCORSI CICLOPEDONALI CON LE STAZIONI DELLA LINEA METROPOLITANA M2. ATTUAZIONE PREVISIONI PGTU E PGT. (Italian)
0 references
REQUEST FOR FUNDING ROP ERDF 2014-2020 FOR THE ESTABLISHMENT OF CYCLOPEDESTRIAN CONNECTIONS IN VIALE LOMBARDIA/FIRST FUNCTIONAL BATCH NORTH/SOUTH CONNECTION — LINKS BETWEEN EXISTING PEDESTRIAN ROUTES WITH METRO STATIONS M2. IMPLEMENTATION OF PGTU AND PGT (English)
0 references
DEMANDE DE FINANCEMENT POUR LE FEDER 2014-2020 POUR LA CONSTRUCTION D’ITINÉRAIRES CYCLABLES DANS LA VIALE LOMBARDIA/PREMIER LOT FONCTIONNEL CONNEXION NORD/SUD — LIAISONS ENTRE LES ITINÉRAIRES CYCLABLES EXISTANTS ET LES STATIONS DE LA LIGNE DE MÉTRO M2. MISE EN ŒUVRE DES PRÉVISIONS PGTU ET PGT. (French)
16 December 2021
0 references
AANVRAAG VOOR FINANCIERING VOOR EFRO 2014-2020 VOOR DE AANLEG VAN FIETSROUTES IN VIALE LOMBARDIA/EERSTE FUNCTIONELE LOTVERBINDING NOORD/ZUID — VERBINDINGEN TUSSEN DE BESTAANDE FIETSROUTES EN DE STATIONS VAN DE METROLIJN M2. UITVOERING VAN PGTU- EN PGT-PROGNOSES. (Dutch)
23 December 2021
0 references
ANTRAG AUF FÖRDERUNG DES EFRE 2014-2020 FÜR DEN BAU VON RADWEGEN IN VIALE LOMBARDIA/ERSTE FUNKTIONALE LOTVERBINDUNG NORD/SÜD – VERBINDUNGEN ZWISCHEN DEN BESTEHENDEN RADWEGEN UND DEN STATIONEN DER U-BAHN-LINIE M2 UMSETZUNG VON PGTU- UND PGT-PROGNOSEN. (German)
24 December 2021
0 references
Identifiers
D29J17001810006
0 references