Property / summary | |||||||||||||||
DER VORLIEGENDE PROJEKTVORSCHLAG BETRIFFT DEN BAU DER NEUEN 150-KV-STROMLEITUNG MATERA – SALANDRA UND BESTEHT AUS DER GESAMTHEIT DER EINZELNEN GROTTE-STROMLEITUNGEN – MATERA CP, GROTTOLE – SALANDRA UND SALANDRA – SAN MAURO FORTE, DIE ZUR REGION BASILICATA GEHÖREN, UND IST STRENG KOMPLEMENTÄR ZU DEN INTERVENTIONEN IN DEN VERTEILERNETZEN IM BEREICH DES INTERESSES, MIT DENEN DIE NUTZUNG DER DEZENTRALEN ERZEUGUNG AUS ERNEUERBAREN QUELLEN, DIE MIT DIESEN NETZEN VERBUNDEN SIND, GEFÖRDERT WERDEN SOLL, DA DADURCH EIN TEIL DER WINDERZEUGUNG (MPE) VERMIEDEN WIRD, DER IM BEREICH DER VERTEILUNG IM BEREICH DES INTERESSES VORHERSEHBAR IST, UM DIE NUTZUNG DER DEZENTRALEN ERZEUGUNG AUS ERNEUERBAREN QUELLEN, DIE MIT DIESEN NETZEN VERBUNDEN SIND, ZU VERSTÄRKEN, DA DADURCH EIN TEIL DES WINDBEDARFS VERMIEDEN WIRD. (German) | |||||||||||||||
Property / summary: DER VORLIEGENDE PROJEKTVORSCHLAG BETRIFFT DEN BAU DER NEUEN 150-KV-STROMLEITUNG MATERA – SALANDRA UND BESTEHT AUS DER GESAMTHEIT DER EINZELNEN GROTTE-STROMLEITUNGEN – MATERA CP, GROTTOLE – SALANDRA UND SALANDRA – SAN MAURO FORTE, DIE ZUR REGION BASILICATA GEHÖREN, UND IST STRENG KOMPLEMENTÄR ZU DEN INTERVENTIONEN IN DEN VERTEILERNETZEN IM BEREICH DES INTERESSES, MIT DENEN DIE NUTZUNG DER DEZENTRALEN ERZEUGUNG AUS ERNEUERBAREN QUELLEN, DIE MIT DIESEN NETZEN VERBUNDEN SIND, GEFÖRDERT WERDEN SOLL, DA DADURCH EIN TEIL DER WINDERZEUGUNG (MPE) VERMIEDEN WIRD, DER IM BEREICH DER VERTEILUNG IM BEREICH DES INTERESSES VORHERSEHBAR IST, UM DIE NUTZUNG DER DEZENTRALEN ERZEUGUNG AUS ERNEUERBAREN QUELLEN, DIE MIT DIESEN NETZEN VERBUNDEN SIND, ZU VERSTÄRKEN, DA DADURCH EIN TEIL DES WINDBEDARFS VERMIEDEN WIRD. (German) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: DER VORLIEGENDE PROJEKTVORSCHLAG BETRIFFT DEN BAU DER NEUEN 150-KV-STROMLEITUNG MATERA – SALANDRA UND BESTEHT AUS DER GESAMTHEIT DER EINZELNEN GROTTE-STROMLEITUNGEN – MATERA CP, GROTTOLE – SALANDRA UND SALANDRA – SAN MAURO FORTE, DIE ZUR REGION BASILICATA GEHÖREN, UND IST STRENG KOMPLEMENTÄR ZU DEN INTERVENTIONEN IN DEN VERTEILERNETZEN IM BEREICH DES INTERESSES, MIT DENEN DIE NUTZUNG DER DEZENTRALEN ERZEUGUNG AUS ERNEUERBAREN QUELLEN, DIE MIT DIESEN NETZEN VERBUNDEN SIND, GEFÖRDERT WERDEN SOLL, DA DADURCH EIN TEIL DER WINDERZEUGUNG (MPE) VERMIEDEN WIRD, DER IM BEREICH DER VERTEILUNG IM BEREICH DES INTERESSES VORHERSEHBAR IST, UM DIE NUTZUNG DER DEZENTRALEN ERZEUGUNG AUS ERNEUERBAREN QUELLEN, DIE MIT DIESEN NETZEN VERBUNDEN SIND, ZU VERSTÄRKEN, DA DADURCH EIN TEIL DES WINDBEDARFS VERMIEDEN WIRD. (German) / qualifier | |||||||||||||||
point in time: 24 December 2021
|
Revision as of 00:15, 24 December 2021
Project Q2021712 in Italy
Language | Label | Description | Also known as |
---|---|---|---|
English | MRS. MATERAN-SALANRA |
Project Q2021712 in Italy |
Statements
11,728,969.24 Euro
0 references
15,876,572.91 Euro
0 references
73.88 percent
0 references
6 December 2017
0 references
31 July 2019
0 references
TERNA - RETE ELETTRICA NAZIONALE
0 references
LA PROPOSTA PROGETTUALE IN ESAME RIGUARDA LA REALIZZAZIONE DEL NUOVO ELETTRODOTTO A 150 KV MATERA - SALANDRA E SI COMPONE DELL'INSIEME DEI SINGOLI ELETTRODOTTI GROTTOLE - MATERA CP, GROTTOLE - SALANDRA E SALANDRA - SAN MAURO FORTE AFFERENTI ALLA REGIONE BASILICATA E RISULTA STRETTAMENTE COMPLEMENTARE AGLI INTERVENTI SULLE RETI DI DISTRIBUZIONE NELL'AREA DI INTERESSE VOLTI AD INCREMENTARE LO SFRUTTAMENTO DI GENERAZIONE DISTRIBUITA DA FONTI RINNOVABILI CONNESSA A TALI RETI NELLA MISURA IN CUI CONSENTIRÃ DI EVITARE QUOTA PARTE DELLA MANCATA PRODUZIONE EOLICA (MPE) PREVEDIBILE NELL'AREA.LA PROPOSTA PROGETTUALE IN ESAME INERISCE LA REALIZZAZIONE DI CIRCA 32 KM DI LINEA 150 KV SEMPLICE TERNA AEREA IL CUI TRACCIATO RIPERCORRERÃ PER CIRCA 21 KM LA LINEA ESISTENTE E, PER LA PARTE RIMANENTE, CONSENTIRÃ UNA VARIANTE ALL'ATTUALE LINEA CONSENTENDO DI LIBERARE UNA BUONA PORZIONE DEL TERRITORIO DALL'INFRASTRUTTURA ELETTRICA.LE SUE MOTIVAZIONI RISIEDONO PRINCIPALMENTE NELLA NECESSITÃ DI AUMENTARE (Italian)
0 references
THIS PROJECT PROPOSAL CONCERNS THE CONSTRUCTION OF THE NEW 150 KV “MATERA — SALANDRA” ELECTRICAL POWER LINE — MATERA CP, GROWLE — SALANDRA AND SALANDRA — SAN MAURO IN RELATION TO THE REGION OF BASILICATA AND IS CLOSELY COMPLEMENTARY TO THE INTERVENTIONS ON DISTRIBUTION NETWORKS IN THE AREA OF INTEREST TO INCREASE THE EXPLOITATION OF DISTRIBUTED GENERATION FROM RENEWABLE SOURCES CONNECTED TO SUCH NETWORKS IN SO FAR AS THE PROPOSED PROJECT UNDER CONSIDERATION IS THAT OF APPROXIMATELY 32 KM OF LINE 150 KV WHICH WILL BE ACHIEVED BY APPROXIMATELY 21 KM OF THE EXISTING LINE AND, FOR THE REMAINING PART, THE CURRENT LINE WILL BE ABLE TO FREE UP A LARGE PORTION OF THE TERRITORY FROM THE ELECTRICAL INFRASTRUCTURE, THE REASONS FOR WHICH ARE MAINLY IN THE NEED TO INCREASE (English)
0 references
LA PROPOSITION DE PROJET À L’EXAMEN CONCERNE LA CONSTRUCTION DE LA NOUVELLE LIGNE ÉLECTRIQUE DE 150 KV MATERA — SALANDRA ET SE COMPOSE DE L’ENSEMBLE DES LIGNES ÉLECTRIQUES UNIQUES DE GROTTOLE — MATERA CP, GROTTOLE — SALANDRA ET SALANDRA — SAN MAURO FORTE APPARTENANT À LA RÉGION DE BASILICATE ET EST STRICTEMENT COMPLÉMENTAIRE DES INTERVENTIONS SUR LES RÉSEAUX DE DISTRIBUTION DANS LA ZONE D’INTÉRÊT VISANT À ACCROÎTRE L’EXPLOITATION DE LA PRODUCTION DISTRIBUÉE À PARTIR DE SOURCES RENOUVELABLES RACCORDÉES À CES RÉSEAUX, DANS LA MESURE OÙ ELLE ÉVITERA UNE PARTIE DU MANQUE DE PRODUCTION ÉOLIENNE (MPE) PRÉVISIBLE DANS LA ZONE DE DISTRIBUTION DANS LA ZONE D’INTÉRÊT VISANT À ACCROÎTRE L’EXPLOITATION DE LA PRODUCTION DISTRIBUÉE À PARTIR DE SOURCES RENOUVELABLES RACCORDÉES À CES RÉSEAUX DANS LA MESURE OÙ ELLE ÉVITERA UNE PARTIE DE LA PRODUCTION ÉOLIENNE PRÉVISIBLE DANS LA ZONE DE DISTRIBUTION DANS LA ZONE D’INTÉRÊT VISANT À ACCROÎTRE L’EXPLOITATION DE LA PRODUCTION DISTRIBUÉE À PARTIR DE SOURCES RENOUVELABLES RELIÉES À CES RÉSEAUX DANS LA MESURE OÙ ELLE ÉVITERA UNE PARTIE DE LA PRODUCTION ÉOLIENNE PRÉVISIBLE DANS LA ZONE DE DISTRIBUTION DANS LA ZONE D’INTÉRÊT VISANT À ACCROÎTRE L’EXPLOITATION DE LA PRODUCTION DISTRIBUÉE À PARTIR DE SOURCES RENOUVELABLES RELIÉES À CES RÉSEAUX, DANS LA MESURE OÙ ELLE ÉVITERA UNE PARTIE DE LA PRODUCTION ÉOLIENNE PRÉVISIBLE DANS LA ZONE D’INTÉRÊT VISANT À ACCROÎTRE L’EXPLOITATION DE LA PRODUCTION DISTRIBUÉE À PARTIR DE SOURCES RENOUVELABLES RELIÉES À CES RÉSEAUX, DANS LA MESURE OÙ ELLE ÉVITERA UNE PARTIE DU MANQUE DE PRODUCTION ÉOLIENNE (MPE) DANS LA ZONE DE DISTRIBUTION DANS LA ZONE D’INTÉRÊT VISANT À ACCROÎTRE L’EXPLOITATION DE LA PRODUCTION DISTRIBUÉE À PARTIR DE SOURCES RENOUVELABLES RELIÉES À CES RÉSEAUX DANS LA MESURE OÙ ELLE PERMETTRA D’ÉVITER UNE PARTIE DE LA PRODUCTION ÉOLIENNE PRÉVISIBLE DANS LA ZONE D’INTÉRÊT (MPE). (French)
14 December 2021
0 references
HET ONDERHAVIGE PROJECTVOORSTEL HEEFT BETREKKING OP DE BOUW VAN DE NIEUWE STROOMLIJN VAN 150 KV MATERA — SALANDRA EN BESTAAT UIT HET GEHEEL VAN DE ENKELE GROTTOLE ELEKTRICITEITSLIJNEN — MATERA CP, GROTTOLE — SALANDRA EN SALANDRA — SAN MAURO FORTE, DIE BEHOREN TOT DE REGIO BASILICATA EN IS STRIKT COMPLEMENTAIR MET DE INTERVENTIES OP HET GEBIED VAN DISTRIBUTIENETWERKEN OP HET GEBIED VAN BELANG OM DE EXPLOITATIE VAN GEDISTRIBUEERDE OPWEKKING UIT HERNIEUWBARE BRONNEN DIE OP DEZE NETWERKEN ZIJN AANGESLOTEN, TE VERGROTEN, VOOR ZOVER DIT EEN DEEL VAN HET GEBREK AAN WINDENERGIE (MPE) ZAL VOORKOMEN DAT OP HET GEBIED VAN DISTRIBUTIE OP HET GEBIED VAN BELANG IS VOORZIEN OM DE EXPLOITATIE VAN GEDISTRIBUEERDE OPWEKKING UIT HERNIEUWBARE BRONNEN DIE MET DEZE NETWERKEN ZIJN VERBONDEN, TE VERGROTEN, VOOR ZOVER DIT EEN DEEL VAN HET GEBREK AAN WINDENERGIE (MPE) ZAL VOORKOMEN. (Dutch)
23 December 2021
0 references
DER VORLIEGENDE PROJEKTVORSCHLAG BETRIFFT DEN BAU DER NEUEN 150-KV-STROMLEITUNG MATERA – SALANDRA UND BESTEHT AUS DER GESAMTHEIT DER EINZELNEN GROTTE-STROMLEITUNGEN – MATERA CP, GROTTOLE – SALANDRA UND SALANDRA – SAN MAURO FORTE, DIE ZUR REGION BASILICATA GEHÖREN, UND IST STRENG KOMPLEMENTÄR ZU DEN INTERVENTIONEN IN DEN VERTEILERNETZEN IM BEREICH DES INTERESSES, MIT DENEN DIE NUTZUNG DER DEZENTRALEN ERZEUGUNG AUS ERNEUERBAREN QUELLEN, DIE MIT DIESEN NETZEN VERBUNDEN SIND, GEFÖRDERT WERDEN SOLL, DA DADURCH EIN TEIL DER WINDERZEUGUNG (MPE) VERMIEDEN WIRD, DER IM BEREICH DER VERTEILUNG IM BEREICH DES INTERESSES VORHERSEHBAR IST, UM DIE NUTZUNG DER DEZENTRALEN ERZEUGUNG AUS ERNEUERBAREN QUELLEN, DIE MIT DIESEN NETZEN VERBUNDEN SIND, ZU VERSTÄRKEN, DA DADURCH EIN TEIL DES WINDBEDARFS VERMIEDEN WIRD. (German)
24 December 2021
0 references
Identifiers
G23G17001530007
0 references