(A19_074_2015_0740047_1053) Q. EN. TESS. (Q2065834): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in fr, and other parts: Adding French translations)
(‎Changed label, description and/or aliases in nl, and other parts: Adding Dutch translations)
label / nllabel / nl
 
(A19_074_2015_0740047_1053) Q. NL. IK BEN TESS.
Property / summary
 
DE WERKZAAMHEDEN IN HET KADER VAN HET PROJECT BETREFFEN DE INSTALLATIE VAN EEN NIEUWE WARMTEPOMP (CHILLER), TYPE LUCHT-/WATERINSTALLATIE IN HET BUITENDAK MET COP VAN 3,81, EER GELIJK AAN 3,27 EN DE VERVANGING VAN DAKRAMEN (KEUKENS), OOK VOOR HET GEBOUW VAN ZEER LAGE KWALITEIT? GEBOUW EN ENERGIE. DE VERVANGING VAN DAKBEDEKKINGSINRICHTINGEN (CUPOLINI) LEIDT TOT EEN AFNAME VAN DE THERMISCHE TRANSMISSIE VAN HET GEBOUW-INSTALLATIESYSTEEM EN DE VERBETERING VAN HET AIRCONDITIONINGSYSTEEM (WINTER EN ZOMER) LEIDT TOT EEN VERHOGING VAN DE EFFICIËNTIE VAN HET SYSTEEM. (Dutch)
Property / summary: DE WERKZAAMHEDEN IN HET KADER VAN HET PROJECT BETREFFEN DE INSTALLATIE VAN EEN NIEUWE WARMTEPOMP (CHILLER), TYPE LUCHT-/WATERINSTALLATIE IN HET BUITENDAK MET COP VAN 3,81, EER GELIJK AAN 3,27 EN DE VERVANGING VAN DAKRAMEN (KEUKENS), OOK VOOR HET GEBOUW VAN ZEER LAGE KWALITEIT? GEBOUW EN ENERGIE. DE VERVANGING VAN DAKBEDEKKINGSINRICHTINGEN (CUPOLINI) LEIDT TOT EEN AFNAME VAN DE THERMISCHE TRANSMISSIE VAN HET GEBOUW-INSTALLATIESYSTEEM EN DE VERBETERING VAN HET AIRCONDITIONINGSYSTEEM (WINTER EN ZOMER) LEIDT TOT EEN VERHOGING VAN DE EFFICIËNTIE VAN HET SYSTEEM. (Dutch) / rank
 
Normal rank
Property / summary: DE WERKZAAMHEDEN IN HET KADER VAN HET PROJECT BETREFFEN DE INSTALLATIE VAN EEN NIEUWE WARMTEPOMP (CHILLER), TYPE LUCHT-/WATERINSTALLATIE IN HET BUITENDAK MET COP VAN 3,81, EER GELIJK AAN 3,27 EN DE VERVANGING VAN DAKRAMEN (KEUKENS), OOK VOOR HET GEBOUW VAN ZEER LAGE KWALITEIT? GEBOUW EN ENERGIE. DE VERVANGING VAN DAKBEDEKKINGSINRICHTINGEN (CUPOLINI) LEIDT TOT EEN AFNAME VAN DE THERMISCHE TRANSMISSIE VAN HET GEBOUW-INSTALLATIESYSTEEM EN DE VERBETERING VAN HET AIRCONDITIONINGSYSTEEM (WINTER EN ZOMER) LEIDT TOT EEN VERHOGING VAN DE EFFICIËNTIE VAN HET SYSTEEM. (Dutch) / qualifier
 
point in time: 23 December 2021
Timestamp+2021-12-23T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 18:33, 23 December 2021

Project Q2065834 in Italy
Language Label Description Also known as
English
(A19_074_2015_0740047_1053) Q. EN. TESS.
Project Q2065834 in Italy

    Statements

    0 references
    12,295.2 Euro
    0 references
    24,590.4 Euro
    0 references
    50.0 percent
    0 references
    12 March 2015
    0 references
    20 March 2017
    0 references
    12 March 2017
    0 references
    TESSILRICAMI FIRENZE SRL
    0 references
    0 references
    0 references

    43°46'11.53"N, 11°15'20.09"E
    0 references
    I LAVORI IN OGGETTO AL PROGETTO RIGUARDANO L?INSTALLAZIONE DI UNA NUOVA POMPA DI CALORE (CHILLER), TIPO ARIA/ACQUA DI INSTALLAZIONE IN COPERTURA ESTERNA CON COP PARI A 3.81, EER UGUALE A 3.27 E LA SOSTITUZIONE DEI LUCERNARI (CUPOLINI), ANCH?ESSI IN COPERTURA ALL?IMMOBILE, ORMAI DIVENUTI DI SCARSISSIMA QUALIT? EDILIZIA ED ENERGETICA. LA SOSTITUZIONE DEGLI INFISSI IN COPERTURA (CUPOLINI) COMPORTA UNA DIMINUZIONE DELLA TRASMITTANZA TERMICA DEL SISTEMA EDIFICIO-IMPIANTO, E LA RIQUALIFICAZIONE DELL'IMPIANTO DI CLIMATIZZAZIONE (INVERNALE ED ESTIVO) COMPORTA UN AUMENTO DELL'EFFICIENZA DELL'IMPIANTO. (Italian)
    0 references
    DO THE WORKS IN QUESTION CONCERN THE INSTALLATION OF A NEW HEAT PUMP (HEAT PUMP), TYPE OF AIR/WATER INSTALLATION IN AN OUTDOOR AREA WITH A COP OF 3.81, EER 3.27, AND THE REPLACEMENT OF THE SKYLIGHTS (CUPOLINI), WHICH IS ALSO COVERED BY THE BUILDING, WHICH HAS NOW BECOME EXTREMELY SCARCE? CONSTRUCTION AND ENERGY. THE REPLACEMENT OF THE FIXTURES IN COVER (CUPOLINI) LEADS TO A REDUCTION IN THE THERMAL TRANSMITTANCE OF THE BUILDING SYSTEM, AND THE RENOVATION OF THE AIR CONDITIONING SYSTEM (WINTER AND SUMMER) RESULTS IN AN INCREASE IN THE EFFICIENCY OF THE PLANT. (English)
    0 references
    LES TRAVAUX EN QUESTION SUR LE PROJET CONCERNENT L’INSTALLATION D’UNE NOUVELLE POMPE À CHALEUR (CHILLER), TYPE D’INSTALLATION AIR/EAU DANS LE TOIT EXTÉRIEUR AVEC COP DE 3.81, EER ÉGAL À 3,27 ET LE REMPLACEMENT DES PUITS DE LUMIÈRE (CUISINES), COUVRANT ÉGALEMENT LE BÂTIMENT, MAINTENANT DE TRÈS FAIBLE QUALITÉ? LE BÂTIMENT ET L’ÉNERGIE. LE REMPLACEMENT DES INSTALLATIONS DE TOITURE (CUPOLINI) ENTRAÎNE UNE DIMINUTION DE LA TRANSMISSION THERMIQUE DU SYSTÈME DE CONSTRUCTION-USINE, ET LA MODERNISATION DU SYSTÈME DE CLIMATISATION (HIVER ET ÉTÉ) ENTRAÎNE UNE AUGMENTATION DE L’EFFICACITÉ DU SYSTÈME. (French)
    16 December 2021
    0 references
    DE WERKZAAMHEDEN IN HET KADER VAN HET PROJECT BETREFFEN DE INSTALLATIE VAN EEN NIEUWE WARMTEPOMP (CHILLER), TYPE LUCHT-/WATERINSTALLATIE IN HET BUITENDAK MET COP VAN 3,81, EER GELIJK AAN 3,27 EN DE VERVANGING VAN DAKRAMEN (KEUKENS), OOK VOOR HET GEBOUW VAN ZEER LAGE KWALITEIT? GEBOUW EN ENERGIE. DE VERVANGING VAN DAKBEDEKKINGSINRICHTINGEN (CUPOLINI) LEIDT TOT EEN AFNAME VAN DE THERMISCHE TRANSMISSIE VAN HET GEBOUW-INSTALLATIESYSTEEM EN DE VERBETERING VAN HET AIRCONDITIONINGSYSTEEM (WINTER EN ZOMER) LEIDT TOT EEN VERHOGING VAN DE EFFICIËNTIE VAN HET SYSTEEM. (Dutch)
    23 December 2021
    0 references

    Identifiers