LINKING OF PROVINCIAL SCHOOL BUILDINGS TO THE OPTICAL FIBRE NETWORK WITHIN THE LOCAL NETWORK OF THE ADIGE — SOUTH TRENTO ACCESS NODE — WORK S804/3 (Q2176989): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement) |
(Changed label, description and/or aliases in fr, and other parts: Adding French translations) |
||||||||||||||
label / fr | label / fr | ||||||||||||||
RACCORDEMENT DES BÂTIMENTS SCOLAIRES PROVINCIAUX AU RÉSEAU DE FIBRE OPTIQUE AU SEIN DE LA COMMUNAUTÉ VALLE DELL’ADIGE — NŒUD D’ACCÈS DE TRENTO SUD — TRAVAUX S804/3 | |||||||||||||||
Property / summary | |||||||||||||||
RACCORDEMENT DES BÂTIMENTS SCOLAIRES PROVINCIAUX AU RÉSEAU À FIBRE OPTIQUE AU SEIN DE LA COMMUNAUTÉ VALLE DELL’ADIGE — NŒUD D’ACCÈS DE TRENTO SUD — TRAVAUX S804/3 (11 BÂTIMENTS SCOLAIRES — VOIR LA DÉCISION APOP NO 242 DD. 17.12.2015) (French) | |||||||||||||||
Property / summary: RACCORDEMENT DES BÂTIMENTS SCOLAIRES PROVINCIAUX AU RÉSEAU À FIBRE OPTIQUE AU SEIN DE LA COMMUNAUTÉ VALLE DELL’ADIGE — NŒUD D’ACCÈS DE TRENTO SUD — TRAVAUX S804/3 (11 BÂTIMENTS SCOLAIRES — VOIR LA DÉCISION APOP NO 242 DD. 17.12.2015) (French) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: RACCORDEMENT DES BÂTIMENTS SCOLAIRES PROVINCIAUX AU RÉSEAU À FIBRE OPTIQUE AU SEIN DE LA COMMUNAUTÉ VALLE DELL’ADIGE — NŒUD D’ACCÈS DE TRENTO SUD — TRAVAUX S804/3 (11 BÂTIMENTS SCOLAIRES — VOIR LA DÉCISION APOP NO 242 DD. 17.12.2015) (French) / qualifier | |||||||||||||||
point in time: 23 December 2021
|
Revision as of 10:01, 23 December 2021
Project Q2176989 in Italy
Language | Label | Description | Also known as |
---|---|---|---|
English | LINKING OF PROVINCIAL SCHOOL BUILDINGS TO THE OPTICAL FIBRE NETWORK WITHIN THE LOCAL NETWORK OF THE ADIGE — SOUTH TRENTO ACCESS NODE — WORK S804/3 |
Project Q2176989 in Italy |
Statements
342,343.11 Euro
0 references
684,686.21 Euro
0 references
50.0 percent
0 references
18 September 2015
0 references
31 December 2019
0 references
PROVINCIA AUTONOMA DI TRENTO
0 references
COLLEGAMENTO DEGLI EDIFICI SCOLASTICI PROVINCIALI ALLA RETE IN FIBRA OTTICA NELL'AMBITO DELLA COMUNITÃ VALLE DELL'ADIGE - NODO DI ACCESSO DI TRENTO SUD - OPERA S804/3 (11 EDIFICI SCOLASTICI - VEDI DETERMINAZIONE APOP N. 242 DD. 17.12.2015) (Italian)
0 references
LINKING THE PROVINCIAL SCHOOL BUILDINGS TO THE OPTICAL FIBRE NETWORK WITHIN THE LOCAL NETWORK OF THE ADIGE REGION — SOUTH TRENTO ACCESS NODE — WORKS S804/3 (11 SCHOOL BUILDINGS — SEE APOPRC DETERMINATION NO 242 DD. 17.12.2015 PLAYERS) (English)
0 references
RACCORDEMENT DES BÂTIMENTS SCOLAIRES PROVINCIAUX AU RÉSEAU À FIBRE OPTIQUE AU SEIN DE LA COMMUNAUTÉ VALLE DELL’ADIGE — NŒUD D’ACCÈS DE TRENTO SUD — TRAVAUX S804/3 (11 BÂTIMENTS SCOLAIRES — VOIR LA DÉCISION APOP NO 242 DD. 17.12.2015) (French)
23 December 2021
0 references
Identifiers
C64H15001630003
0 references