IMERESE HARBOUR COMPLETION WORKS (SECOND EXCERPT OF COMPLETION). (Q2017477): Difference between revisions
Jump to navigation
Jump to search
(Changed label, description and/or aliases in fr, and other parts: Adding French translations) |
(Changed label, description and/or aliases in nl, and other parts: Adding Dutch translations) |
||||||||||||||
label / nl | label / nl | ||||||||||||||
HAVEN VAN TERMEN IMERESE — WERK VAN VOLTOOIING VAN DE PIER OVERFLOW (TWEEDE UITTREKSEL VAN VOLTOOIING). | |||||||||||||||
Property / summary | |||||||||||||||
HET TWEEDE UITTREKSEL VAN DE ACTIE OM DE PIER VAN OVERLOOP TE VOLTOOIEN IS GERICHT OP DE BLOEI VAN DE GEPERFOREERDE KAAP OM DE WERKING EN VEILIGHEID VAN DE HAVEN VAN IMERESE TERMEN TE VERBETEREN. (Dutch) | |||||||||||||||
Property / summary: HET TWEEDE UITTREKSEL VAN DE ACTIE OM DE PIER VAN OVERLOOP TE VOLTOOIEN IS GERICHT OP DE BLOEI VAN DE GEPERFOREERDE KAAP OM DE WERKING EN VEILIGHEID VAN DE HAVEN VAN IMERESE TERMEN TE VERBETEREN. (Dutch) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: HET TWEEDE UITTREKSEL VAN DE ACTIE OM DE PIER VAN OVERLOOP TE VOLTOOIEN IS GERICHT OP DE BLOEI VAN DE GEPERFOREERDE KAAP OM DE WERKING EN VEILIGHEID VAN DE HAVEN VAN IMERESE TERMEN TE VERBETEREN. (Dutch) / qualifier | |||||||||||||||
point in time: 22 December 2021
|
Revision as of 20:57, 22 December 2021
Project Q2017477 in Italy
Language | Label | Description | Also known as |
---|---|---|---|
English | IMERESE HARBOUR COMPLETION WORKS (SECOND EXCERPT OF COMPLETION). |
Project Q2017477 in Italy |
Statements
15,000,000.0 Euro
0 references
20,000,000.0 Euro
0 references
75.0 percent
0 references
6 March 2019
0 references
30 June 2021
0 references
ADSP DEL MARE DI SICILIA OCCIDENTALE
0 references
IL SECONDO STRALCIO DELL'INTERVENTO DI COMPLETAMENTO DEL MOLO DI SOPRAFLUTTO Ê FINALIZZATO AL RIFIORIMENTO DELLA MANTELLATA FORANEA AL FINE DI MIGLIORARE L'OPERATIVITà E LA SICUREZZA DEL PORTO DI TERMINI IMERESE. (Italian)
0 references
THE SECOND PART OF THE WORK TO COMPLETE THE RUNAWAY JETTY IS CARRIED OUT WITH A VIEW TO IMPROVING THE OPERATION AND SAFETY OF THE HARBOUR OF IMERESE. (English)
0 references
LE DEUXIÈME EXTRAIT DE L’ACTION POUR COMPLÉTER LA JETÉE DE DÉBORDEMENT VISE À LA FLORAISON DU CAP PERFORÉ AFIN D’AMÉLIORER LE FONCTIONNEMENT ET LA SÉCURITÉ DU PORT D’IMERESE. (French)
14 December 2021
0 references
HET TWEEDE UITTREKSEL VAN DE ACTIE OM DE PIER VAN OVERLOOP TE VOLTOOIEN IS GERICHT OP DE BLOEI VAN DE GEPERFOREERDE KAAP OM DE WERKING EN VEILIGHEID VAN DE HAVEN VAN IMERESE TERMEN TE VERBETEREN. (Dutch)
22 December 2021
0 references
Identifiers
I64F19000040005
0 references