IMERESE HARBOUR COMPLETION WORKS (SECOND EXCERPT OF COMPLETION). (Q2017477): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in fr, and other parts: Adding French translations)
(‎Changed label, description and/or aliases in nl, and other parts: Adding Dutch translations)
label / nllabel / nl
 
HAVEN VAN TERMEN IMERESE — WERK VAN VOLTOOIING VAN DE PIER OVERFLOW (TWEEDE UITTREKSEL VAN VOLTOOIING).
Property / summary
 
HET TWEEDE UITTREKSEL VAN DE ACTIE OM DE PIER VAN OVERLOOP TE VOLTOOIEN IS GERICHT OP DE BLOEI VAN DE GEPERFOREERDE KAAP OM DE WERKING EN VEILIGHEID VAN DE HAVEN VAN IMERESE TERMEN TE VERBETEREN. (Dutch)
Property / summary: HET TWEEDE UITTREKSEL VAN DE ACTIE OM DE PIER VAN OVERLOOP TE VOLTOOIEN IS GERICHT OP DE BLOEI VAN DE GEPERFOREERDE KAAP OM DE WERKING EN VEILIGHEID VAN DE HAVEN VAN IMERESE TERMEN TE VERBETEREN. (Dutch) / rank
 
Normal rank
Property / summary: HET TWEEDE UITTREKSEL VAN DE ACTIE OM DE PIER VAN OVERLOOP TE VOLTOOIEN IS GERICHT OP DE BLOEI VAN DE GEPERFOREERDE KAAP OM DE WERKING EN VEILIGHEID VAN DE HAVEN VAN IMERESE TERMEN TE VERBETEREN. (Dutch) / qualifier
 
point in time: 22 December 2021
Timestamp+2021-12-22T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 20:57, 22 December 2021

Project Q2017477 in Italy
Language Label Description Also known as
English
IMERESE HARBOUR COMPLETION WORKS (SECOND EXCERPT OF COMPLETION).
Project Q2017477 in Italy

    Statements

    0 references
    15,000,000.0 Euro
    0 references
    20,000,000.0 Euro
    0 references
    75.0 percent
    0 references
    6 March 2019
    0 references
    30 June 2021
    0 references
    ADSP DEL MARE DI SICILIA OCCIDENTALE
    0 references
    0 references

    37°59'1.14"N, 13°41'43.98"E
    0 references
    IL SECONDO STRALCIO DELL'INTERVENTO DI COMPLETAMENTO DEL MOLO DI SOPRAFLUTTO Ê FINALIZZATO AL RIFIORIMENTO DELLA MANTELLATA FORANEA AL FINE DI MIGLIORARE L'OPERATIVITà E LA SICUREZZA DEL PORTO DI TERMINI IMERESE. (Italian)
    0 references
    THE SECOND PART OF THE WORK TO COMPLETE THE RUNAWAY JETTY IS CARRIED OUT WITH A VIEW TO IMPROVING THE OPERATION AND SAFETY OF THE HARBOUR OF IMERESE. (English)
    0 references
    LE DEUXIÈME EXTRAIT DE L’ACTION POUR COMPLÉTER LA JETÉE DE DÉBORDEMENT VISE À LA FLORAISON DU CAP PERFORÉ AFIN D’AMÉLIORER LE FONCTIONNEMENT ET LA SÉCURITÉ DU PORT D’IMERESE. (French)
    14 December 2021
    0 references
    HET TWEEDE UITTREKSEL VAN DE ACTIE OM DE PIER VAN OVERLOOP TE VOLTOOIEN IS GERICHT OP DE BLOEI VAN DE GEPERFOREERDE KAAP OM DE WERKING EN VEILIGHEID VAN DE HAVEN VAN IMERESE TERMEN TE VERBETEREN. (Dutch)
    22 December 2021
    0 references

    Identifiers

    I64F19000040005
    0 references