Health Network of the BEMPOSTA-OLIVEIRA PINESS OF AZEMIES — Good Pine Subsystem (Q3389385): Difference between revisions
Jump to navigation
Jump to search
(Changed label, description and/or aliases in de, and other parts: Adding German translations) |
(Changed label, description and/or aliases in nl, and other parts: Adding Dutch translations) |
||||||||||||||
label / nl | label / nl | ||||||||||||||
Gezondheidsnetwerk van het Bemposta-OLIVEIRA PINESS OF AZEMIES — Good Pine Subsystem | |||||||||||||||
Property / summary | |||||||||||||||
Deze operatie is gericht op de installatie van het afvoernet van restwater op nog niet bediende locaties, namelijk in de parochie van Pinheiro da Bemposta, met inbegrip van de bouw van een RWZI die het verzamelde afvalwater zal behandelen. De realisatie van de operatie maakt de komst van nog eens 2 093 inwoners mogelijk, wat zich vertaalt in een verhoging van het dekkingspercentage in de gemeente als geheel met 3,1 %. (Dutch) | |||||||||||||||
Property / summary: Deze operatie is gericht op de installatie van het afvoernet van restwater op nog niet bediende locaties, namelijk in de parochie van Pinheiro da Bemposta, met inbegrip van de bouw van een RWZI die het verzamelde afvalwater zal behandelen. De realisatie van de operatie maakt de komst van nog eens 2 093 inwoners mogelijk, wat zich vertaalt in een verhoging van het dekkingspercentage in de gemeente als geheel met 3,1 %. (Dutch) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: Deze operatie is gericht op de installatie van het afvoernet van restwater op nog niet bediende locaties, namelijk in de parochie van Pinheiro da Bemposta, met inbegrip van de bouw van een RWZI die het verzamelde afvalwater zal behandelen. De realisatie van de operatie maakt de komst van nog eens 2 093 inwoners mogelijk, wat zich vertaalt in een verhoging van het dekkingspercentage in de gemeente als geheel met 3,1 %. (Dutch) / qualifier | |||||||||||||||
point in time: 20 December 2021
|
Revision as of 16:11, 20 December 2021
Project Q3389385 in Portugal
Language | Label | Description | Also known as |
---|---|---|---|
English | Health Network of the BEMPOSTA-OLIVEIRA PINESS OF AZEMIES — Good Pine Subsystem |
Project Q3389385 in Portugal |
Statements
1,600,000.0 Euro
0 references
2,147,843.0 Euro
0 references
74.49 percent
0 references
30 June 2021
0 references
29 June 2023
0 references
MUNICÃPIO DE OLIVEIRA DE AZEMÃIS
0 references
Esta operação visa a instalação da rede de drenagem de águas residuais em localidades ainda não servidas, nomeadamente na Freguesia de Pinheiro da Bemposta, incluindo a construção de uma ETAR que tratará o efluente recolhido.A concretização da operação permitirá chegar a mais 2 093 habitantes, o que se traduz num aumento de taxa de cobertura na ordem dos 3,1% no conjunto do concelho. (Portuguese)
0 references
This operation aims at the installation of the drainage network of residual waters in locations not yet served, namely in the parish of Pinheiro da Bemposta, including the construction of a WWTP that will treat the collected effluent. The realisation of the operation allows the arrival of an additional 2 093 inhabitants, which translates into an increase in the coverage rate in the order of 3.1 % in the municipality as a whole. (English)
29 November 2021
0 references
Cette opération vise l’installation du réseau de drainage des eaux résiduelles dans des endroits non encore desservis, à savoir dans la paroisse de Pinheiro da Bemposta, y compris la construction d’une station d’épuration qui traitera les effluents collectés. La réalisation de l’opération permet l’arrivée de 2 093 habitants supplémentaires, ce qui se traduit par une augmentation du taux de couverture de l’ordre de 3,1 % dans l’ensemble de la commune. (French)
7 December 2021
0 references
Ziel dieses Vorhabens ist die Errichtung des Kanalisationsnetzes von Restgewässern an Orten, die noch nicht bedient werden, nämlich in der Pfarrei Pinheiro da Bemposta, einschließlich des Baus eines WWTP, das das gesammelte Abwasser behandeln wird. Die Durchführung des Vorhabens ermöglicht die Ankunft weiterer 2 093 Einwohner, was zu einer Erhöhung der Deckungsrate in Höhe von 3,1 % in der Gemeinde insgesamt führt. (German)
16 December 2021
0 references
Deze operatie is gericht op de installatie van het afvoernet van restwater op nog niet bediende locaties, namelijk in de parochie van Pinheiro da Bemposta, met inbegrip van de bouw van een RWZI die het verzamelde afvalwater zal behandelen. De realisatie van de operatie maakt de komst van nog eens 2 093 inwoners mogelijk, wat zich vertaalt in een verhoging van het dekkingspercentage in de gemeente als geheel met 3,1 %. (Dutch)
20 December 2021
0 references
Oliveira de Azeméis, Ãrea Metropolitana do Porto, Norte
0 references
Identifiers
POSEUR-03-2012-FC-001454
0 references