Extension of the Water Supply Network in the Municipality of Penela (Q2982493): Difference between revisions
Jump to navigation
Jump to search
(Changed label, description and/or aliases in de, and other parts: Adding German translations) |
(Changed label, description and/or aliases in nl, and other parts: Adding Dutch translations) |
||||||||||||||
label / nl | label / nl | ||||||||||||||
Uitbreiding van het watervoorzieningsnetwerk in de gemeente Penela | |||||||||||||||
Property / summary | |||||||||||||||
De operatie bestaat uit de uitvoering van kanalen met een totale lengte van 8,296 m, twee reservoirs en een hefstation, met aansluiting op het systeem in Alta, om de efficiëntie van dit systeem te garanderen.De operatie omvat de bouw van deze adductoren die de levering van water aan de plaatsen Besteiro, Rabaçal, Podentes, S. Domingos, Vouzela en Fonte Redoiça zullen garanderen met aansluiting op het systeem op hoog niveau. (Dutch) | |||||||||||||||
Property / summary: De operatie bestaat uit de uitvoering van kanalen met een totale lengte van 8,296 m, twee reservoirs en een hefstation, met aansluiting op het systeem in Alta, om de efficiëntie van dit systeem te garanderen.De operatie omvat de bouw van deze adductoren die de levering van water aan de plaatsen Besteiro, Rabaçal, Podentes, S. Domingos, Vouzela en Fonte Redoiça zullen garanderen met aansluiting op het systeem op hoog niveau. (Dutch) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: De operatie bestaat uit de uitvoering van kanalen met een totale lengte van 8,296 m, twee reservoirs en een hefstation, met aansluiting op het systeem in Alta, om de efficiëntie van dit systeem te garanderen.De operatie omvat de bouw van deze adductoren die de levering van water aan de plaatsen Besteiro, Rabaçal, Podentes, S. Domingos, Vouzela en Fonte Redoiça zullen garanderen met aansluiting op het systeem op hoog niveau. (Dutch) / qualifier | |||||||||||||||
point in time: 20 December 2021
|
Revision as of 09:22, 20 December 2021
Project Q2982493 in Portugal
Language | Label | Description | Also known as |
---|---|---|---|
English | Extension of the Water Supply Network in the Municipality of Penela |
Project Q2982493 in Portugal |
Statements
700,833.0 Euro
0 references
824,509.0 Euro
0 references
85.0 percent
0 references
1 April 2017
0 references
31 March 2020
0 references
MUNICÍPIO DE PENELA
0 references
Q2990366 (Deleted Item)
0 references
A operação consiste na execução de condutas adutoras uma extensão total de 8.296m, dois reservatórios e uma estação elevatória, com ligação ao sistema em Alta, no sentido de garantir a eficiência deste sistema.A operação contempla a construção destas adutoras que irão garantir o abastecimento de água às localidades de Besteiro, Rabaçal, Podentes, S. Domingos, Vouzela e Fonte Redoiça com ligação ao sistema em alta. (Portuguese)
0 references
The operation consists of the execution of pipelines a total length of 8,296 m, two reservoirs and a lifting station, with connection to the system in Alta, in order to ensure the efficiency of this system.The operation includes the construction of these pumps that will guarantee the supply of water to the localities of Besteiro, Rabaçal, Podentes, S. Domingos, Vouzela and Redoiça with connection to the system in high. (English)
9 July 2021
0 references
L’opération consiste en l’exécution de conduits d’une longueur totale de 8,296 m, deux réservoirs et une station de levage, avec raccordement au système à Alta, afin de garantir l’efficacité de ce système.L’opération comprend la construction de ces adducteurs qui garantiront l’approvisionnement en eau aux localités de Besteiro, Rabaçal, Podentes, S. Domingos, Vouzela et Fonte Redoiça avec connexion au système à haute. (French)
7 December 2021
0 references
Der Betrieb besteht aus der Ausführung von Kanälen eine Gesamtlänge von 8,296 m, zwei Stauseen und eine Hebestation, mit Verbindung zu dem System in Alta, um die Effizienz dieses Systems zu gewährleisten.Der Betrieb umfasst den Bau dieser Adduktoren, die die Versorgung mit dem Wasser zu den Ortschaften Besteiro, Rabaçal, Podentes, S. Domingos, Vouzela und Fonte Redoiça mit Verbindung zu dem System auf hohem Niveau garantieren werden. (German)
15 December 2021
0 references
De operatie bestaat uit de uitvoering van kanalen met een totale lengte van 8,296 m, twee reservoirs en een hefstation, met aansluiting op het systeem in Alta, om de efficiëntie van dit systeem te garanderen.De operatie omvat de bouw van deze adductoren die de levering van water aan de plaatsen Besteiro, Rabaçal, Podentes, S. Domingos, Vouzela en Fonte Redoiça zullen garanderen met aansluiting op het systeem op hoog niveau. (Dutch)
20 December 2021
0 references
Penela
0 references
Identifiers
POSEUR-03-2012-FC-000704
0 references