Strengthening the Institutional Capacity of Social Partners with Coxia in the CPCS (Q2977970): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in de, and other parts: Adding German translations)
(‎Changed label, description and/or aliases in nl, and other parts: Adding Dutch translations)
label / nllabel / nl
 
Versterking van de institutionele opleiding van sociale partners met zetel in het CPCS
Property / summary
 
In de periode van 1/06/2018 tot en met 31/12/2020 is het GLB van plan om in het kader van de POISE de institutionele capaciteit van de sociale partners in het kader van het CPCS te versterken, de modernisering van prioritaire investeringen op de arbeidsmarkt, prioritaire as 1 ter bevordering van duurzaamheid en kwaliteit van de werkgelegenheid, een reeks van 19 activiteiten ter bevordering van de werkgelegenheid en de sociale cohesie in zijn sector. (Dutch)
Property / summary: In de periode van 1/06/2018 tot en met 31/12/2020 is het GLB van plan om in het kader van de POISE de institutionele capaciteit van de sociale partners in het kader van het CPCS te versterken, de modernisering van prioritaire investeringen op de arbeidsmarkt, prioritaire as 1 ter bevordering van duurzaamheid en kwaliteit van de werkgelegenheid, een reeks van 19 activiteiten ter bevordering van de werkgelegenheid en de sociale cohesie in zijn sector. (Dutch) / rank
 
Normal rank
Property / summary: In de periode van 1/06/2018 tot en met 31/12/2020 is het GLB van plan om in het kader van de POISE de institutionele capaciteit van de sociale partners in het kader van het CPCS te versterken, de modernisering van prioritaire investeringen op de arbeidsmarkt, prioritaire as 1 ter bevordering van duurzaamheid en kwaliteit van de werkgelegenheid, een reeks van 19 activiteiten ter bevordering van de werkgelegenheid en de sociale cohesie in zijn sector. (Dutch) / qualifier
 
point in time: 20 December 2021
Timestamp+2021-12-20T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 08:39, 20 December 2021

Project Q2977970 in Portugal
Language Label Description Also known as
English
Strengthening the Institutional Capacity of Social Partners with Coxia in the CPCS
Project Q2977970 in Portugal

    Statements

    0 references
    514,019.0 Euro
    0 references
    604,728.0 Euro
    0 references
    85.0 percent
    0 references
    18 June 2018
    0 references
    31 December 2020
    0 references
    CONFEDERAÇÃO DOS AGRICULTORES DE PORTUGAL
    0 references
    Q3003304 (Deleted Item)
    0 references
    0 references
    Durante o período de 1/06/2018 a 31/12/2020, a CAP pretende realizar no âmbito do POISE, reforço da capacidade institucional dos parceiros sociais com assento na CPCS, prioridade investimento – modernização do mercado de trabalho, do eixo prioritário 1 – promover a sustentabilidade e a qualidade do emprego, um conjunto de 19 atividades de forma a promover o emprego e a coesão social no seu setor de atuação. (Portuguese)
    0 references
    During the period from 1/06/2018 to 31/12/2020, CAP intends to carry out within the framework of the POISE, strengthening the institutional capacity of social partners with coxia in the CPCS, priority investment modernisation of the labour market, priority 1 to promote sustainability and quality of employment, a set of 19 activities in order to promote employment and social cohesion in its sector. (English)
    9 July 2021
    0 references
    Au cours de la période allant du 1er juin 2018 au 31 décembre 2020, la PAC a l’intention de réaliser, dans le cadre du POISE, le renforcement de la capacité institutionnelle des partenaires sociaux basés dans le SCPC, la modernisation prioritaire des investissements du marché du travail, l’axe prioritaire 1 visant à promouvoir la durabilité et la qualité de l’emploi, un ensemble de 19 activités visant à promouvoir l’emploi et la cohésion sociale dans son secteur d’activité. (French)
    7 December 2021
    0 references
    Im Zeitraum vom 1.6.2018 bis zum 31.12.2020 beabsichtigt die GAP, im Rahmen des POISE die institutionellen Kapazitäten der im CPCS ansässigen Sozialpartner zu stärken, vorrangige Investitionen auf dem Arbeitsmarkt zu modernisieren, Prioritätsachse 1 zur Förderung von Nachhaltigkeit und Qualität der Beschäftigung, 19 Tätigkeiten zur Förderung der Beschäftigung und des sozialen Zusammenhalts in ihrem Tätigkeitsbereich. (German)
    15 December 2021
    0 references
    In de periode van 1/06/2018 tot en met 31/12/2020 is het GLB van plan om in het kader van de POISE de institutionele capaciteit van de sociale partners in het kader van het CPCS te versterken, de modernisering van prioritaire investeringen op de arbeidsmarkt, prioritaire as 1 ter bevordering van duurzaamheid en kwaliteit van de werkgelegenheid, een reeks van 19 activiteiten ter bevordering van de werkgelegenheid en de sociale cohesie in zijn sector. (Dutch)
    20 December 2021
    0 references

    Identifiers

    POISE-01-3726-FSE-000010
    0 references