Requalification of Largos December 1, Santa Cameroon, Combatants and Liaison Route – Rua Viscount de Ovar (Q2878320): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in de, and other parts: Adding German translations)
(‎Changed label, description and/or aliases in nl, and other parts: Adding Dutch translations)
label / nllabel / nl
 
Herkwalificatie van Largos 1 december, Santa Kameroen, Combatants en Link Path — Viscount Street of Ovar
Property / summary
 
Herkwalificatie van Largos 1 december, Santa Camarão, Combatentes en Link Route — Visconde de Ovar Street, voor een totale lengte van ongeveer 1,7 kilometer, over een oppervlakte van ongeveer 3 hectare (30 000,00 m²). (Dutch)
Property / summary: Herkwalificatie van Largos 1 december, Santa Camarão, Combatentes en Link Route — Visconde de Ovar Street, voor een totale lengte van ongeveer 1,7 kilometer, over een oppervlakte van ongeveer 3 hectare (30 000,00 m²). (Dutch) / rank
 
Normal rank
Property / summary: Herkwalificatie van Largos 1 december, Santa Camarão, Combatentes en Link Route — Visconde de Ovar Street, voor een totale lengte van ongeveer 1,7 kilometer, over een oppervlakte van ongeveer 3 hectare (30 000,00 m²). (Dutch) / qualifier
 
point in time: 18 December 2021
Timestamp+2021-12-18T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 22:37, 18 December 2021

Project Q2878320 in Portugal
Language Label Description Also known as
English
Requalification of Largos December 1, Santa Cameroon, Combatants and Liaison Route – Rua Viscount de Ovar
Project Q2878320 in Portugal

    Statements

    0 references
    1,181,973.0 Euro
    0 references
    1,390,556.0 Euro
    0 references
    85.0 percent
    0 references
    1 April 2020
    0 references
    30 August 2021
    0 references
    MUNICÍPIO DE OVAR
    0 references
    Q2990942 (Deleted Item)
    0 references

    40°51'34.13"N, 8°37'30.79"W
    0 references
    Requalificação dos Largos 1.º de Dezembro, Santa Camarão, Combatentes e Percurso de Ligação - Rua Visconde de Ovar, numa extensão total de aproximadamente 1,7 quilómetros, numa área de cerca de 3 hectares (30.000,00 m2). (Portuguese)
    0 references
    Requalification of Largos 1 December, Santa Cameroon, Combatentes and Liaison Route – Rua Viscount de Ovar, for a total length of approximately 1.7 kilometers, in an area of about 3 hectares (30000.00 m²). (English)
    7 July 2021
    0 references
    Requalification de Largos le 1er décembre, Santa Camarão, Combatentes and Link Route — Visconde de Ovar Street, pour une longueur totale d’environ 1,7 km, sur une superficie d’environ 3 hectares (30 000,00 m²). (French)
    5 December 2021
    0 references
    Requalifizierung Largos 1. Dezember, Santa Camarão, Combatentes und Link Route – Visconde de Ovar Street, für eine Gesamtlänge von ca. 1,7 km, auf einer Fläche von etwa 3 Hektar (30 000,00 m²). (German)
    13 December 2021
    0 references
    Herkwalificatie van Largos 1 december, Santa Camarão, Combatentes en Link Route — Visconde de Ovar Street, voor een totale lengte van ongeveer 1,7 kilometer, over een oppervlakte van ongeveer 3 hectare (30 000,00 m²). (Dutch)
    18 December 2021
    0 references
    Ovar, União das freguesias de Ovar, São João, Arada e São Vicente de Pereira Jusã
    0 references

    Identifiers

    CENTRO-09-2316-FEDER-000161
    0 references