Property / summary
 
Met deze operatie is het van plan om vier bestaande gebouwen in Quinta do Moinho Velho te renoveren voor de installatie van het Social Opportunities Center, samen met de interventie van restauratie en milieu- en landschapsverbetering van de buitenruimten van het omliggende gebied, evenals de herkwalificatie/aanleg van toegangen tot Quinta do Moinho Velho, waardoor het probleem van de stedelijke integratie van deze ruimte wordt opgelost. (Dutch)
Property / summary: Met deze operatie is het van plan om vier bestaande gebouwen in Quinta do Moinho Velho te renoveren voor de installatie van het Social Opportunities Center, samen met de interventie van restauratie en milieu- en landschapsverbetering van de buitenruimten van het omliggende gebied, evenals de herkwalificatie/aanleg van toegangen tot Quinta do Moinho Velho, waardoor het probleem van de stedelijke integratie van deze ruimte wordt opgelost. (Dutch) / rank
 
Normal rank
Property / summary: Met deze operatie is het van plan om vier bestaande gebouwen in Quinta do Moinho Velho te renoveren voor de installatie van het Social Opportunities Center, samen met de interventie van restauratie en milieu- en landschapsverbetering van de buitenruimten van het omliggende gebied, evenals de herkwalificatie/aanleg van toegangen tot Quinta do Moinho Velho, waardoor het probleem van de stedelijke integratie van deze ruimte wordt opgelost. (Dutch) / qualifier
 
point in time: 18 December 2021
Timestamp+2021-12-18T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 22:29, 18 December 2021

Project Q2878252 in Portugal
Language Label Description Also known as
English
Installation of the Centre for Social Opportunities of the Old Mill
Project Q2878252 in Portugal

    Statements

    0 references
    2,244,092.0 Euro
    0 references
    2,640,108.0 Euro
    0 references
    85.0 percent
    0 references
    5 September 2016
    0 references
    31 July 2021
    0 references
    MUNICIPIO DE CASTELO BRANCO
    0 references

    39°49'35.87"N, 7°29'30.95"W
    0 references
    Com a presente operação pretende a recuperação de quatro edifícios existentes na Quinta do Moinho Velho para instalação do Centro de Oportunidades Sociais, a par da intervenção de recuperação e valorização ambiental e paisagística dos espaços exteriores da área envolvente ao edificado, bem como pela requalificação/construção de acessos à Quinta do Moinho Velho, resolvendo o problema de integração urbanística deste espaço. (Portuguese)
    0 references
    With the present operation aims to recover four existing buildings in Quinta do Moinho Velho for the installation of the Center for Social Opportunities, along with the intervention of environmental and landscape recovery and enhancement of the outer spaces of the area surrounding the building, as well as the requalification/construction of accesses to Quinta do Moinho Velho, solving the problem of urban integration of this space. (English)
    7 July 2021
    0 references
    Avec cette opération, il a l’intention de rénover quatre bâtiments existants à Quinta do Moinho Velho pour l’installation du Centre d’Opportunités Sociales, ainsi que l’intervention de la restauration et de l’amélioration de l’environnement et du paysage des espaces extérieurs de la zone environnante à la construction, ainsi que la requalification/construction des accès à Quinta do Moinho Velho, résoudre le problème de l’intégration urbaine de cet espace. (French)
    4 December 2021
    0 references
    Mit dieser Operation beabsichtigt es, vier bestehende Gebäude in Quinta do Moinho Velho für die Installation des Social Opportunities Center zu sanieren, zusammen mit dem Eingreifen von Restaurierung und Umwelt- und Landschaftsverbesserung der Außenräume der Umgebung zum Bau, sowie die Umschulung/Konstruktion von Zugängen zu Quinta do Moinho Velho, das Problem der urbanen Integration dieses Raumes zu lösen. (German)
    13 December 2021
    0 references
    Met deze operatie is het van plan om vier bestaande gebouwen in Quinta do Moinho Velho te renoveren voor de installatie van het Social Opportunities Center, samen met de interventie van restauratie en milieu- en landschapsverbetering van de buitenruimten van het omliggende gebied, evenals de herkwalificatie/aanleg van toegangen tot Quinta do Moinho Velho, waardoor het probleem van de stedelijke integratie van deze ruimte wordt opgelost. (Dutch)
    18 December 2021
    0 references
    Castelo Branco, Castelo Branco
    0 references

    Identifiers

    CENTRO-09-2316-FEDER-000080
    0 references