REQUALIFICATION OF PUBLIC SPACE – PHASE 1: GREEN SOURCE WIDE STRUCTURE RENOVATION (Q2878053): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in de, and other parts: Adding German translations)
(‎Changed label, description and/or aliases in nl, and other parts: Adding Dutch translations)
label / nllabel / nl
 
HERKWALIFICATIE VAN DE OPENBARE RUIMTE — FASE 1: GROEN AANBOD BREDE STRUCTUUR VERNIEUWING
Property / summary
 
Het eerste amendement is van fysieke, financiële en temporele aard. De investering van de component Studies, Adviezen, Projecten en Consulting werd geannuleerd. De investering van de component Diversen werd aangepast aan de opdracht voor werken en de uitvoeringsperiode werd gewijzigd. (Dutch)
Property / summary: Het eerste amendement is van fysieke, financiële en temporele aard. De investering van de component Studies, Adviezen, Projecten en Consulting werd geannuleerd. De investering van de component Diversen werd aangepast aan de opdracht voor werken en de uitvoeringsperiode werd gewijzigd. (Dutch) / rank
 
Normal rank
Property / summary: Het eerste amendement is van fysieke, financiële en temporele aard. De investering van de component Studies, Adviezen, Projecten en Consulting werd geannuleerd. De investering van de component Diversen werd aangepast aan de opdracht voor werken en de uitvoeringsperiode werd gewijzigd. (Dutch) / qualifier
 
point in time: 18 December 2021
Timestamp+2021-12-18T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 22:26, 18 December 2021

Project Q2878053 in Portugal
Language Label Description Also known as
English
REQUALIFICATION OF PUBLIC SPACE – PHASE 1: GREEN SOURCE WIDE STRUCTURE RENOVATION
Project Q2878053 in Portugal

    Statements

    0 references
    752,520.0 Euro
    0 references
    885,318.0 Euro
    0 references
    85.0 percent
    0 references
    15 April 2020
    0 references
    30 June 2021
    0 references
    MUNICÍPIO DE SABUGAL
    0 references
    Q2990931 (Deleted Item)
    0 references

    40°21'6.59"N, 7°5'22.74"W
    0 references
    A primeira alteração proposta é de natureza física, financeira e temporal. Foi anulado o investimento da componente Estudos, Pareceres, Projetos e Consultoria. Foi ajustado o investimento da componente Construções diversas, de acordo com o contrato de empreitada, e alterado o prazo de execução. (Portuguese)
    0 references
    The first amendment proposed is of a physical, financial and temporal nature. The investment of the Studies, Opinions, Projects and Consulting component was cancelled. The investment of the Miscellaneous Constructions component was adjusted according to the contract, and the execution period changed. (English)
    7 July 2021
    0 references
    Le premier amendement proposé est de nature physique, financière et temporelle. L’investissement du volet «Études, avis, projets et conseils» a été annulé. L’investissement de la composante Constructions diverses a été ajusté en fonction du contrat de travaux et la période d’exécution a été modifiée. (French)
    4 December 2021
    0 references
    Die erste vorgeschlagene Änderung ist materieller, finanzieller und zeitlicher Natur. Die Investition der Komponente Studien, Meinungen, Projekte und Beratung wurde annulliert. Die Investition der Komponente Verschiedene Bauten wurde entsprechend dem Bauauftrag angepasst und die Ausführungsfrist geändert. (German)
    13 December 2021
    0 references
    Het eerste amendement is van fysieke, financiële en temporele aard. De investering van de component Studies, Adviezen, Projecten en Consulting werd geannuleerd. De investering van de component Diversen werd aangepast aan de opdracht voor werken en de uitvoeringsperiode werd gewijzigd. (Dutch)
    18 December 2021
    0 references
    Sabugal, União das freguesias do Sabugal e Aldeia de Santo António
    0 references

    Identifiers

    CENTRO-07-2316-FEDER-000258
    0 references