ADAPTING SMES 2020 (Q2870608): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in de, and other parts: Adding German translations)
(‎Changed label, description and/or aliases in nl, and other parts: Adding Dutch translations)
label / nllabel / nl
 
AANPASSEN VAN KMO’S 2020
Property / summary
 
Project om de vestiging aan te passen aan beschermingsmaatregelen en steun aan de nieuwe omgeving die is opgelegd door COVID-19 (Dutch)
Property / summary: Project om de vestiging aan te passen aan beschermingsmaatregelen en steun aan de nieuwe omgeving die is opgelegd door COVID-19 (Dutch) / rank
 
Normal rank
Property / summary: Project om de vestiging aan te passen aan beschermingsmaatregelen en steun aan de nieuwe omgeving die is opgelegd door COVID-19 (Dutch) / qualifier
 
point in time: 18 December 2021
Timestamp+2021-12-18T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 22:13, 18 December 2021

Project Q2870608 in Portugal
Language Label Description Also known as
English
ADAPTING SMES 2020
Project Q2870608 in Portugal

    Statements

    0 references
    2,755.0 Euro
    0 references
    5,510.0 Euro
    0 references
    50.0 percent
    0 references
    15 June 2020
    0 references
    31 March 2021
    0 references
    UNIPINHO, PRODUTOS PARA CABELEIREIROS LDA
    0 references
    0 references

    40°22'44.69"N, 7°51'25.85"W
    0 references
    Projecto para adaptar o establecimento com medidas de proteção e suporte à nova conjuntura imposta pelo COVID 19 (Portuguese)
    0 references
    Project to adapt the facility with protective measures and support for the new environment imposed by COVID 19 (English)
    7 July 2021
    0 references
    Projet visant à adapter l’établissement au moyen de mesures de protection et de soutien au nouvel environnement imposé par la COVID 19 (French)
    4 December 2021
    0 references
    Projekt zur Anpassung der Betriebsstätte mit Schutzmaßnahmen und Unterstützung an die durch COVID-19 auferlegte neue Umwelt (German)
    13 December 2021
    0 references
    Project om de vestiging aan te passen aan beschermingsmaatregelen en steun aan de nieuwe omgeving die is opgelegd door COVID-19 (Dutch)
    18 December 2021
    0 references
    Oliveira do Hospital
    0 references

    Identifiers

    CENTRO-02-08B9-FEDER-069547
    0 references