Intervention in the Terrestrial Logistic Circuits of the Third? Rehabilitation and Benefit of the Sections of the Circular of Angra do Heroísmo and the Ramal of E.R. 1-1.ª access to the Port of Cinco Ribeiras (Q2854035): Difference between revisions
Jump to navigation
Jump to search
(Changed label, description and/or aliases in de, and other parts: Adding German translations) |
(Changed label, description and/or aliases in nl, and other parts: Adding Dutch translations) |
||||||||||||||
label / nl | label / nl | ||||||||||||||
Interventie in Derde Terrestrial Logistic Circuits? Rehabilitatie en Begunstiging van de secties van de circulaire van Angra do Heroísmo en de Ramal van E.R. 1-1e toegang tot de haven van de vijf Ribeiras | |||||||||||||||
Property / summary | |||||||||||||||
Het project omvat de bouw en prijsherziening van de bouw van het contract voor interventie in de Terrestrial Logistic Circuits of Terceira — Revalidatie en Begunstiging van de secties van de circulaire van Angra do Heroísmo en de Ramal da E.R. nr. 1-1 toegang tot de haven van Five Ribeiras, die zich vertaalt in het herstel van de wegvloer, door de bestaande bestrating in bitumineuze, regularisatie en herprofilering van de wegvloer te malen (Dutch) | |||||||||||||||
Property / summary: Het project omvat de bouw en prijsherziening van de bouw van het contract voor interventie in de Terrestrial Logistic Circuits of Terceira — Revalidatie en Begunstiging van de secties van de circulaire van Angra do Heroísmo en de Ramal da E.R. nr. 1-1 toegang tot de haven van Five Ribeiras, die zich vertaalt in het herstel van de wegvloer, door de bestaande bestrating in bitumineuze, regularisatie en herprofilering van de wegvloer te malen (Dutch) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: Het project omvat de bouw en prijsherziening van de bouw van het contract voor interventie in de Terrestrial Logistic Circuits of Terceira — Revalidatie en Begunstiging van de secties van de circulaire van Angra do Heroísmo en de Ramal da E.R. nr. 1-1 toegang tot de haven van Five Ribeiras, die zich vertaalt in het herstel van de wegvloer, door de bestaande bestrating in bitumineuze, regularisatie en herprofilering van de wegvloer te malen (Dutch) / qualifier | |||||||||||||||
point in time: 18 December 2021
|
Revision as of 17:35, 18 December 2021
Project Q2854035 in Portugal
Language | Label | Description | Also known as |
---|---|---|---|
English | Intervention in the Terrestrial Logistic Circuits of the Third? Rehabilitation and Benefit of the Sections of the Circular of Angra do Heroísmo and the Ramal of E.R. 1-1.ª access to the Port of Cinco Ribeiras |
Project Q2854035 in Portugal |
Statements
554,849.0 Euro
0 references
652,764.0 Euro
0 references
85.0 percent
0 references
31 March 2017
0 references
14 May 2018
0 references
SECRETARIA REGIONAL DAS OBRAS PÚBLICAS E COMUNICAÇÕES
0 references
O projeto contempla as componentes de construção e de revisão de preços da construção da empreitada de Intervenção nos Circuitos Logísticos Terrestres da Terceira - Reabilitação e Beneficiação dos troços da Circular de Angra do Heroísmo e do Ramal da E. R. N.º 1-1.ª de acesso ao Porto das Cinco Ribeiras, que se traduz na reabilitação do pavimento das vias, mediante a fresagem do pavimento existente em betuminoso, regularização e reperfilamento da (Portuguese)
0 references
The project includes the components of construction and price revision of the construction of the Intervention contract in Terrestrial Logistic Circuits of Terceira – Rehabilitation and Benefit of the sections of the Circular of Angra do Heroísmo and the Branch of E. R. No. 1-1ª of access to the Port of Cinco Ribeiras, which translates into the rehabilitation of the road pavement, by milling the existing pavement in bituminous, regularisation and refilling of the roads (English)
6 July 2021
0 references
Le projet comprend les éléments de construction et de révision des prix de la construction du contrat d’intervention dans les circuits logistiques terrestres de Terceira — Réhabilitation et bien-être des sections de la circulaire d’Angra do Heroísmo et du Ramal da E.R. no 1-1 accès au port des Cinq Ribeiras, ce qui se traduit par la réhabilitation du plancher routier, en fraisant le trottoir existant en bitumineux, régularisation et repositionnement de la (French)
4 December 2021
0 references
Das Projekt umfasst die Bau- und Preisrevisionskomponenten des Baus des Vertrags über die Intervention in den terrestrischen Logistikkreisen von Terceira – Rehabilitation und Förderung der Abschnitte des Rundschreibens von Angra do Heroísmo und der Ramal da E.R. Nr. 1-1 Zugang zum Hafen von Five Ribeiras, der sich in die Sanierung des Straßenbodens durch Fräsen des bestehenden Pflasters in bituminöser, Regularisierung und Neuprofilierung des Straßenbodens niederschlägt. (German)
13 December 2021
0 references
Het project omvat de bouw en prijsherziening van de bouw van het contract voor interventie in de Terrestrial Logistic Circuits of Terceira — Revalidatie en Begunstiging van de secties van de circulaire van Angra do Heroísmo en de Ramal da E.R. nr. 1-1 toegang tot de haven van Five Ribeiras, die zich vertaalt in het herstel van de wegvloer, door de bestaande bestrating in bitumineuze, regularisatie en herprofilering van de wegvloer te malen (Dutch)
18 December 2021
0 references
Angra do Heroísmo
0 references
Identifiers
ACORES-07-2756-FEDER-000015
0 references