Replacement and improvement of the boilers of the Pilkington plant (Sagunto) to reduce its energy consumption. (Q3158482): Difference between revisions
Jump to navigation
Jump to search
(Changed label, description and/or aliases in de, and other parts: Adding German translations) |
(Changed label, description and/or aliases in nl, and other parts: Adding Dutch translations) |
||||||||||||||
label / nl | label / nl | ||||||||||||||
Vervanging en verbetering van de ketels van de Pilkington-fabriek (Sagunto) om het energieverbruik te verminderen. | |||||||||||||||
Property / summary | |||||||||||||||
Het doel van het project is de vervanging van ketels die een verbetering van de energie-efficiëntie in de Sagunto-installatie bereiken (Dutch) | |||||||||||||||
Property / summary: Het doel van het project is de vervanging van ketels die een verbetering van de energie-efficiëntie in de Sagunto-installatie bereiken (Dutch) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: Het doel van het project is de vervanging van ketels die een verbetering van de energie-efficiëntie in de Sagunto-installatie bereiken (Dutch) / qualifier | |||||||||||||||
point in time: 17 December 2021
|
Revision as of 12:45, 17 December 2021
Project Q3158482 in Spain
Language | Label | Description | Also known as |
---|---|---|---|
English | Replacement and improvement of the boilers of the Pilkington plant (Sagunto) to reduce its energy consumption. |
Project Q3158482 in Spain |
Statements
109,450.0 Euro
0 references
218,900.0 Euro
0 references
50.0 percent
0 references
31 May 2018
0 references
6 May 2021
0 references
PILKINGTON AUTOMOTIVE ESPAÑA SA
0 references
46220
0 references
El objeto del proyecto es la sustitucion de calderas consiguiendo una mejora de la eficiencia energética en la planta de Sagunto (Spanish)
0 references
The aim of the project is to replace boilers achieving an improvement in energy efficiency in the Sagunto plant (English)
12 October 2021
0 references
L’objectif du projet est de remplacer les chaudières afin d’améliorer l’efficacité énergétique de l’usine de Sagunto. (French)
4 December 2021
0 references
Ziel des Projekts ist es, Kessel zu ersetzen, die eine Verbesserung der Energieeffizienz im Werk Sagunto erreichen (German)
9 December 2021
0 references
Het doel van het project is de vervanging van ketels die een verbetering van de energie-efficiëntie in de Sagunto-installatie bereiken (Dutch)
17 December 2021
0 references
Sagunto/Sagunt
0 references
Identifiers
FN17IND02222
0 references