Building localised fibre networks on the route E45-Norråker unified Region Jämtlnad/Härjedalen’s needs inventory, called route 23. (Q2661274): Difference between revisions
Jump to navigation
Jump to search
(Removed claims) |
(Changed an Item: Fix budget) |
||||||||||||||
Property / budget | |||||||||||||||
487,883.62 Euro
| |||||||||||||||
Property / budget: 487,883.62 Euro / rank | |||||||||||||||
Preferred rank | |||||||||||||||
Property / budget: 487,883.62 Euro / qualifier | |||||||||||||||
exchange rate to Euro: 0.097576724 Euro
| |||||||||||||||
Property / budget: 487,883.62 Euro / qualifier | |||||||||||||||
point in time: 16 December 2021
| |||||||||||||||
Property / budget | |||||||||||||||
5,000,000.0 Swedish krona
| |||||||||||||||
Property / budget: 5,000,000.0 Swedish krona / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / EU contribution | |||||||||||||||
243,941.81 Euro
| |||||||||||||||
Property / EU contribution: 243,941.81 Euro / rank | |||||||||||||||
Preferred rank | |||||||||||||||
Property / EU contribution: 243,941.81 Euro / qualifier | |||||||||||||||
exchange rate to Euro: 0.097576724 Euro
| |||||||||||||||
Property / EU contribution: 243,941.81 Euro / qualifier | |||||||||||||||
point in time: 16 December 2021
| |||||||||||||||
Property / EU contribution | |||||||||||||||
2,500,000 Swedish krona
| |||||||||||||||
Property / EU contribution: 2,500,000 Swedish krona / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / co-financing rate | |||||||||||||||
50.0 percent
| |||||||||||||||
Property / co-financing rate: 50.0 percent / rank | |||||||||||||||
Normal rank |
Revision as of 14:26, 16 December 2021
Project Q2661274 in Sweden
Language | Label | Description | Also known as |
---|---|---|---|
English | Building localised fibre networks on the route E45-Norråker unified Region Jämtlnad/Härjedalen’s needs inventory, called route 23. |
Project Q2661274 in Sweden |
Statements
2,500,000 Swedish krona
0 references
5,000,000.0 Swedish krona
0 references
50.0 percent
0 references
1 October 2020
0 references
30 April 2023
0 references
Tåsjöbergets Fritidsanläggningar Ek. För.
0 references
83359
0 references
Projektets mål är att bygga bredband längs de sträckor som projektet söker stöd för baserat på prioriterade sträckor som finns med i behovskartläggningen för Region Jämtland Härjedalen. Syftet är att genom investering i de ortsammanbindande sträckorna möjliggöra för 43 företag att ansluta sig till bredband med minst 100Mbit/ s. Sökt sträcka är: E45-Norråker (23), Sträckan kortast ner och berör södra sidan av Tåsjön, det gäller följande byar: Rotnäset (Norråker) Skansnäset, Västertåsjö Svedje samt Tåsjöedet till Lövvik. (Swedish)
0 references
The goal of the project is to build broadband along the routes for which the project is seeking support based on priority routes included in the map of the Jämtland Härjedalen Region. The aim is to enable 43 companies to connect to broadband with at least 100Mbit/s through investment in the localised routes. E45-Norråker (23), The stretch shortest down and touches the south side of Tåsjön, which applies to the following villages: Rotnäset (Norråker) Skansnäset, Västertåsjö Svedje and Tåsjöedet to Lövvik. (English)
29 April 2021
0 references
L’objectif du projet est de construire le haut débit le long des tronçons pour lesquels le projet sollicite un soutien sur la base des sections prioritaires incluses dans la carte des besoins pour la région Jämtland Härjedalen. L’objectif est de permettre à 43 entreprises de se connecter au haut débit d’au moins 100 Mbit/s en investissant dans les liaisons urbaines. E45-Norråker (23), La distance la plus courte vers le bas et touche le côté sud du lac de Tåsjön, il concerne les villages suivants: Rotnäset (Norråker) Skansnäset, Västertåsjö Svedje et Tåsjöedet à Lövvik. (French)
25 November 2021
0 references
Ziel des Projekts ist der Aufbau von Breitbandverbindungen entlang der Abschnitte, für die das Projekt Unterstützung auf der Grundlage von vorrangigen Abschnitten in der Bedarfskarte für die Region Jämtland Härjedalen beantragt. Ziel ist es, 43 Unternehmen in die Lage zu versetzen, Breitbandverbindungen mit mindestens 100 Mbit/s zu erreichen, indem sie in die Städteanbindungsrouten investieren. E45-Norråker (23), Die kürzeste Strecke und berührt die Südseite des Tåsjön Sees, es betrifft die folgenden Dörfer: Rotnäset (Norråker) Skansnäset, Västertåsjö Svedje und Tåsjöedet nach Lövvik. (German)
27 November 2021
0 references
Doel van het project is breedband te bouwen langs de trajecten waarvoor het project steun zoekt op basis van prioritaire onderdelen die zijn opgenomen in de behoeftenkaart voor regio Jämtland Härjedalen. Het doel is 43 bedrijven in staat te stellen verbinding te maken met breedband met ten minste 100Mbit/s door te investeren in de verbindingen tussen steden. E45-Norråker (23), De afstand kortst naar beneden en raakt de zuidkant van het meer van Tåsjön, het betreft de volgende dorpen: Rotnäset (Norråker) Skansnäset, Västertåsjö Svedje en Tåsjöedet naar Lövvik. (Dutch)
28 November 2021
0 references
Identifiers
20292948
0 references