ENERGY EFFICIENCY AND ENERGY EFFICIENCY (Q2074804): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement)
(‎Changed label, description and/or aliases in fr, and other parts: Adding French translations)
label / frlabel / fr
 
EFFICACITÉ ÉNERGÉTIQUE SPM SAS
Property / summary
 
LE PROJET COMPREND: INSTALLATION D’UN SYSTÈME PHOTOVOLTAÏQUE DE 80 KWP — INSTALLATION D’ONDULEURS N.2 SUR LES SYSTÈMES D’ASPIRATION DE FUMÉE — ACHAT N.1 COÛT DE PONCEUSE MOD.WD7 — CCCCC 600 AVEC HAUTE EFFICACITÉ ÉNERGÉTIQUE — INSTALLATION D’APPAREILS D’ÉCLAIRAGE À HAUT RENDEMENT N.20 — ACHAT DE MOTEURS IE4 À HAUT RENDEMENT N.2 POUR SYSTÈMES D’ASPIRATION. (French)
Property / summary: LE PROJET COMPREND: INSTALLATION D’UN SYSTÈME PHOTOVOLTAÏQUE DE 80 KWP — INSTALLATION D’ONDULEURS N.2 SUR LES SYSTÈMES D’ASPIRATION DE FUMÉE — ACHAT N.1 COÛT DE PONCEUSE MOD.WD7 — CCCCC 600 AVEC HAUTE EFFICACITÉ ÉNERGÉTIQUE — INSTALLATION D’APPAREILS D’ÉCLAIRAGE À HAUT RENDEMENT N.20 — ACHAT DE MOTEURS IE4 À HAUT RENDEMENT N.2 POUR SYSTÈMES D’ASPIRATION. (French) / rank
 
Normal rank
Property / summary: LE PROJET COMPREND: INSTALLATION D’UN SYSTÈME PHOTOVOLTAÏQUE DE 80 KWP — INSTALLATION D’ONDULEURS N.2 SUR LES SYSTÈMES D’ASPIRATION DE FUMÉE — ACHAT N.1 COÛT DE PONCEUSE MOD.WD7 — CCCCC 600 AVEC HAUTE EFFICACITÉ ÉNERGÉTIQUE — INSTALLATION D’APPAREILS D’ÉCLAIRAGE À HAUT RENDEMENT N.20 — ACHAT DE MOTEURS IE4 À HAUT RENDEMENT N.2 POUR SYSTÈMES D’ASPIRATION. (French) / qualifier
 
point in time: 16 December 2021
Timestamp+2021-12-16T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 14:23, 16 December 2021

Project Q2074804 in Italy
Language Label Description Also known as
English
ENERGY EFFICIENCY AND ENERGY EFFICIENCY
Project Q2074804 in Italy

    Statements

    0 references
    36,679.22 Euro
    0 references
    73,358.43 Euro
    0 references
    50.0 percent
    0 references
    8 June 2018
    0 references
    22 March 2019
    0 references
    14 December 2018
    0 references
    SPM S.A.S. DI AZZOLIN MARINO AND C.
    0 references
    0 references
    0 references

    45°44'22.52"N, 11°32'53.84"E
    0 references
    IL PROGETTO PREVEDE: INSTALLAZIONE DI IMPIANTO FOTOVOLTAICO 80 KWP - INSTALLAZIONE DI N.2 INVERTER SU IMPIANTI ASPIRAZIONE FUMI - ACQUISTO N.1 LEVIGATRICE COSTA MOD.WD7 - CCCCC 600 AD ALTA EFFICIENZA ENERGETICA - INSTALLAZIONE DI N.20 APPARECCHI DI ILLUMINAZIONE AD ALTA EFFICIENZA - ACQUISTO N.2 MOTORI IE4 A ELEVATA EFFICIENZA PER IMPIANTI ASPIRAZIONE. (Italian)
    0 references
    THE PROJECT INCLUDES: INSTALLATION OF PV INSTALLATION 80 KWP — INSTALLATION OF N.2 INVERTERS ON INTAKE GAS, PURCHASE N.1 SMOOTHING COAST MOD.WD7 — CCCCC 600 IN HIGH ENERGY EFFICIENCY — INSTALLATION OF N.20 HIGH-EFFICIENCY LIGHTING EQUIPMENT — PURCHASE N.2 HIGH-EFFICIENCY IE4 ENGINES FOR SUCTION SYSTEMS. (English)
    0 references
    LE PROJET COMPREND: INSTALLATION D’UN SYSTÈME PHOTOVOLTAÏQUE DE 80 KWP — INSTALLATION D’ONDULEURS N.2 SUR LES SYSTÈMES D’ASPIRATION DE FUMÉE — ACHAT N.1 COÛT DE PONCEUSE MOD.WD7 — CCCCC 600 AVEC HAUTE EFFICACITÉ ÉNERGÉTIQUE — INSTALLATION D’APPAREILS D’ÉCLAIRAGE À HAUT RENDEMENT N.20 — ACHAT DE MOTEURS IE4 À HAUT RENDEMENT N.2 POUR SYSTÈMES D’ASPIRATION. (French)
    16 December 2021
    0 references

    Identifiers

    B87B18000070009
    0 references