REFURBISHMENT AND UPGRADING OF HOTEL ROYAL (Q2075436): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement) |
(Changed label, description and/or aliases in fr, and other parts: Adding French translations) |
||||||||||||||
label / fr | label / fr | ||||||||||||||
MODERNISATION ET RÉAMÉNAGEMENT DE L’HÔTEL ROYAL | |||||||||||||||
Property / summary | |||||||||||||||
LE PROJET PRÉVOIT LA CRÉATION DE 8 NOUVELLES CHAMBRES/SUITES ET DE 14 SALLES DE BAINS AUX DEUXIÈME ET TROISIÈME ÉTAGES, DANS LESQUELLES DE NOUVEAUX SERVICES SERONT AJOUTÉS, TELS QUE DES CHAMBRES PLUS LUXUEUSES CONTENANT UN MINIBAR, UN BAIN À REMOUS OU UNE DOUCHE SPA. PLANIFIÉ LA RÉNOVATION DES DEUXIÈME ET TROISIÈME ÉTAGES AVEC LA DÉMOLITION ET LA RECONSTRUCTION COMPLÈTE DU PLANCHER ET DES MURS, PUIS A PROCÉDÉ À LA CONSTRUCTION DE QUATORZE NOUVELLES GRANDES SALLES (French) | |||||||||||||||
Property / summary: LE PROJET PRÉVOIT LA CRÉATION DE 8 NOUVELLES CHAMBRES/SUITES ET DE 14 SALLES DE BAINS AUX DEUXIÈME ET TROISIÈME ÉTAGES, DANS LESQUELLES DE NOUVEAUX SERVICES SERONT AJOUTÉS, TELS QUE DES CHAMBRES PLUS LUXUEUSES CONTENANT UN MINIBAR, UN BAIN À REMOUS OU UNE DOUCHE SPA. PLANIFIÉ LA RÉNOVATION DES DEUXIÈME ET TROISIÈME ÉTAGES AVEC LA DÉMOLITION ET LA RECONSTRUCTION COMPLÈTE DU PLANCHER ET DES MURS, PUIS A PROCÉDÉ À LA CONSTRUCTION DE QUATORZE NOUVELLES GRANDES SALLES (French) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: LE PROJET PRÉVOIT LA CRÉATION DE 8 NOUVELLES CHAMBRES/SUITES ET DE 14 SALLES DE BAINS AUX DEUXIÈME ET TROISIÈME ÉTAGES, DANS LESQUELLES DE NOUVEAUX SERVICES SERONT AJOUTÉS, TELS QUE DES CHAMBRES PLUS LUXUEUSES CONTENANT UN MINIBAR, UN BAIN À REMOUS OU UNE DOUCHE SPA. PLANIFIÉ LA RÉNOVATION DES DEUXIÈME ET TROISIÈME ÉTAGES AVEC LA DÉMOLITION ET LA RECONSTRUCTION COMPLÈTE DU PLANCHER ET DES MURS, PUIS A PROCÉDÉ À LA CONSTRUCTION DE QUATORZE NOUVELLES GRANDES SALLES (French) / qualifier | |||||||||||||||
point in time: 16 December 2021
|
Revision as of 14:20, 16 December 2021
Project Q2075436 in Italy
Language | Label | Description | Also known as |
---|---|---|---|
English | REFURBISHMENT AND UPGRADING OF HOTEL ROYAL |
Project Q2075436 in Italy |
Statements
70,868.57 Euro
0 references
141,737.13 Euro
0 references
50.0 percent
0 references
31 May 2019
0 references
1 April 2021
0 references
HOTEL ROYAL SRL
0 references
IL PROGETTO PREVEDE LA CREAZIONE DI 8 NUOVE STANZE/SUITE E 14 BAGNI AL SECONDO E TERZO PIANO NELLE QUALI VERRANNO AGGIUNTI NUOVI SERVIZI QUALI CAMERE PIU'` LUSSUOSE CONTENENTI FRIGO BAR, VASCA IDROMASSAGGIO O DOCCIA SPA. ¿PREVISTO IL RIFACIMENTO DEL SECONDO E DEL TERZO PIANO CON LA DEMOLIZIONE E LA RICOSTRUZIONE COMPLETA DEL SOLAIO E DEI MURI, PROCEDENDO POI ALLA REALIZZAZIONE DI QUATTORDICI NUOVE GRANDI CAMERE (Italian)
0 references
THE PROJECT PROVIDES FOR THE CREATION OF 8 NEW ROOMS/SUITE AND 14 BATHROOMS TO THE SECOND AND THIRD FLOORS IN WHICH NEW SERVICES WILL BE ADDED AS THE MORE ‘LUXURIOUS’ CHAMBERS CONTAINING COLD BARS, HYDROTASTING OR SHOWER. THIS WILL INCLUDE THE REFURBISHMENT OF THE SECOND AND THIRD FLOORS WITH THE DEMOLITION AND FULL RECONSTRUCTION OF THE FLOOR AND WALLS AND FOURTEEN NEW LARGE ROOMS. (English)
0 references
LE PROJET PRÉVOIT LA CRÉATION DE 8 NOUVELLES CHAMBRES/SUITES ET DE 14 SALLES DE BAINS AUX DEUXIÈME ET TROISIÈME ÉTAGES, DANS LESQUELLES DE NOUVEAUX SERVICES SERONT AJOUTÉS, TELS QUE DES CHAMBRES PLUS LUXUEUSES CONTENANT UN MINIBAR, UN BAIN À REMOUS OU UNE DOUCHE SPA. PLANIFIÉ LA RÉNOVATION DES DEUXIÈME ET TROISIÈME ÉTAGES AVEC LA DÉMOLITION ET LA RECONSTRUCTION COMPLÈTE DU PLANCHER ET DES MURS, PUIS A PROCÉDÉ À LA CONSTRUCTION DE QUATORZE NOUVELLES GRANDES SALLES (French)
16 December 2021
0 references
Identifiers
B41G19000240009
0 references