EXTENSION WORKS HOTEL CHERZ (Q2075431): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement) |
(Changed label, description and/or aliases in fr, and other parts: Adding French translations) |
||||||||||||||
label / fr | label / fr | ||||||||||||||
TRAVAUX D’EXTENSION ET DE MODERNISATION DE L’HÔTEL MONTE CHERZ | |||||||||||||||
Property / summary | |||||||||||||||
LE PROJET COMPREND UNE EXTENSION DE L’IMMEUBLE À MONTE DU BÂTIMENT VERS LE NORD POUR LA CONSTRUCTION D’UN BÂTIMENT SÉPARÉ MAIS RELIÉ À L’EXISTANT POUR SERVIR DE LOCAUX POUR LE PERSONNEL AU REZ-DE-CHAUSSÉE, CENTRE DE BIEN-ÊTRE AVEC PISCINE AU PREMIER ÉTAGE ET SALLE DE CONFÉRENCE AU DEUXIÈME ÉTAGE. (French) | |||||||||||||||
Property / summary: LE PROJET COMPREND UNE EXTENSION DE L’IMMEUBLE À MONTE DU BÂTIMENT VERS LE NORD POUR LA CONSTRUCTION D’UN BÂTIMENT SÉPARÉ MAIS RELIÉ À L’EXISTANT POUR SERVIR DE LOCAUX POUR LE PERSONNEL AU REZ-DE-CHAUSSÉE, CENTRE DE BIEN-ÊTRE AVEC PISCINE AU PREMIER ÉTAGE ET SALLE DE CONFÉRENCE AU DEUXIÈME ÉTAGE. (French) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: LE PROJET COMPREND UNE EXTENSION DE L’IMMEUBLE À MONTE DU BÂTIMENT VERS LE NORD POUR LA CONSTRUCTION D’UN BÂTIMENT SÉPARÉ MAIS RELIÉ À L’EXISTANT POUR SERVIR DE LOCAUX POUR LE PERSONNEL AU REZ-DE-CHAUSSÉE, CENTRE DE BIEN-ÊTRE AVEC PISCINE AU PREMIER ÉTAGE ET SALLE DE CONFÉRENCE AU DEUXIÈME ÉTAGE. (French) / qualifier | |||||||||||||||
point in time: 16 December 2021
|
Revision as of 14:20, 16 December 2021
Project Q2075431 in Italy
Language | Label | Description | Also known as |
---|---|---|---|
English | EXTENSION WORKS HOTEL CHERZ |
Project Q2075431 in Italy |
Statements
129,931.19 Euro
0 references
259,862.38 Euro
0 references
50.0 percent
0 references
31 May 2019
0 references
1 April 2021
0 references
HOTEL MONTE CHERZ DI DE DORIGO GIORGIO AND C. SNC
0 references
IL PROGETTO PREVEDE UN AMPLIAMENTO DELL¿IMMOBILE A MONTE DELL¿EDIFICIO VERSO NORD PER LA REALIZZAZIONE DI UN CORPO DI FABBRICA A SE STANTE MA COLLEGATO ALL¿ESISTENTE DA ADIBIRE A CAMERE PER IL PERSONALE AL PIANO TERRA, CENTRO BENESSERE CON PISCINA AL PRIMO PIANO E SALA CONGRESSI AL SECONDO PIANO. (Italian)
0 references
THE PROJECT PROVIDES FOR AN EXTENSION OF THE PROPERTY TO BE EXTENDED UPSTREAM OF THE BUILDING TO THE NORTH FOR THE PURPOSE OF CARRYING OUT A SEPARATE WORKS OF CONSTRUCTION WORKS IN ITS OWN RIGHT BUT ATTACHED TO THE EXISTING ZONE TO BE USED BY CHAMBERS FOR STAFF ON THE GROUND FLOOR, WELLNESS WITH A SWIMMING POOL AT THE FIRST FLOOR AND CONFERENCE ROOM ON THE SECOND FLOOR. (English)
0 references
LE PROJET COMPREND UNE EXTENSION DE L’IMMEUBLE À MONTE DU BÂTIMENT VERS LE NORD POUR LA CONSTRUCTION D’UN BÂTIMENT SÉPARÉ MAIS RELIÉ À L’EXISTANT POUR SERVIR DE LOCAUX POUR LE PERSONNEL AU REZ-DE-CHAUSSÉE, CENTRE DE BIEN-ÊTRE AVEC PISCINE AU PREMIER ÉTAGE ET SALLE DE CONFÉRENCE AU DEUXIÈME ÉTAGE. (French)
16 December 2021
0 references
Identifiers
B91G19000120009
0 references