EFFICIENCY MEASURES IN THE ROUTINE SYSTEM OF EXTRUSION 2 LINES, RECOVERY CYCLE FOR TRIMMINGS/SCRAP, PHOTOVOLTAIC, LIGHTING AND INSULATION INCLUDING ASBESTOS REMOVAL (Q2071820): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement)
(‎Changed label, description and/or aliases in fr, and other parts: Adding French translations)
label / frlabel / fr
 
INTERVENTIONS EFFICACES EN RÉGIME ORDINAIRE SUR 2 LIGNES TÊTES D’EXTRUSION, CYCLE DE REGRANULATION POUR LA RÉCUPÉRATION DES DÉCHETS/DÉCHETS, PHOTOVOLTAÏQUE, ÉCLAIRAGE ET ISOLATION OPIFICIO Y COMPRIS L’ÉLIMINATION DE L’AMIANTE
Property / summary
 
INTERVENTIONS EFFICACES EN RÉGIME ORDINAIRE SUR 2 LIGNES TÊTES D’EXTRUSION, CYCLE DE REGRANULATION POUR LA RÉCUPÉRATION DES DÉCHETS/DÉCHETS, PHOTOVOLTAÏQUE, ÉCLAIRAGE ET ISOLATION OPIFICIO Y COMPRIS L’ÉLIMINATION DE L’AMIANTE (French)
Property / summary: INTERVENTIONS EFFICACES EN RÉGIME ORDINAIRE SUR 2 LIGNES TÊTES D’EXTRUSION, CYCLE DE REGRANULATION POUR LA RÉCUPÉRATION DES DÉCHETS/DÉCHETS, PHOTOVOLTAÏQUE, ÉCLAIRAGE ET ISOLATION OPIFICIO Y COMPRIS L’ÉLIMINATION DE L’AMIANTE (French) / rank
 
Normal rank
Property / summary: INTERVENTIONS EFFICACES EN RÉGIME ORDINAIRE SUR 2 LIGNES TÊTES D’EXTRUSION, CYCLE DE REGRANULATION POUR LA RÉCUPÉRATION DES DÉCHETS/DÉCHETS, PHOTOVOLTAÏQUE, ÉCLAIRAGE ET ISOLATION OPIFICIO Y COMPRIS L’ÉLIMINATION DE L’AMIANTE (French) / qualifier
 
point in time: 16 December 2021
Timestamp+2021-12-16T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 14:18, 16 December 2021

Project Q2071820 in Italy
Language Label Description Also known as
English
EFFICIENCY MEASURES IN THE ROUTINE SYSTEM OF EXTRUSION 2 LINES, RECOVERY CYCLE FOR TRIMMINGS/SCRAP, PHOTOVOLTAIC, LIGHTING AND INSULATION INCLUDING ASBESTOS REMOVAL
Project Q2071820 in Italy

    Statements

    0 references
    30,525.0 Euro
    0 references
    61,050.0 Euro
    0 references
    50.0 percent
    0 references
    29 October 2015
    0 references
    24 January 2017
    0 references
    31 December 2017
    0 references
    UMBRO PLAST S.R.L.
    0 references
    0 references
    0 references

    42°54'33.88"N, 12°33'20.95"E
    0 references
    INTERVENTI EFFICIENTAMENTO IN REGIME ORDINARIO SU TESTE ESTRUSIONE 2 LINEE, CICLO DELLA RIGRANULAZIONE PER RECUPERO SFRIDI/SCARTI, FOTOVOLTAICO, ILLUMINAZIONI E COIBENTAZIONE OPIFICIO INCLUSA RIMOZIONE AMIANTO (Italian)
    0 references
    EFFICIENCY MEASURES IN THE ROUTINE SYSTEM OF EXTRUSION 2 LINES, RECOVERY CYCLE FOR TRIMMINGS/SCRAP, PHOTOVOLTAIC, LIGHTING AND INSULATION INCLUDING ASBESTOS REMOVAL (English)
    0 references
    INTERVENTIONS EFFICACES EN RÉGIME ORDINAIRE SUR 2 LIGNES TÊTES D’EXTRUSION, CYCLE DE REGRANULATION POUR LA RÉCUPÉRATION DES DÉCHETS/DÉCHETS, PHOTOVOLTAÏQUE, ÉCLAIRAGE ET ISOLATION OPIFICIO Y COMPRIS L’ÉLIMINATION DE L’AMIANTE (French)
    16 December 2021
    0 references

    Identifiers

    I17H16000580007
    0 references