REPLACING HYDRAULIC PRESS PRESS WITH ELECTRICAL PRESS REVAMPS OF HIGH EFFICACY LED LIGHTING AND FTV SYSTEM (Q2074119): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement)
(‎Changed label, description and/or aliases in fr, and other parts: Adding French translations)
label / frlabel / fr
 
REMPLACEMENT DE PRESSE HYDRAULIQUE AVEC PRESSE ÉLECTRIQUE, SYSTÈME D’ÉCLAIRAGE DE RÉNOVATION AVEC LED À HAUTE EFFICACITÉ ET SYSTÈME FTV
Property / summary
 
AFIN DE RÉDUIRE LA CONSOMMATION DANS LE DÉPARTEMENT DE MOULAGE, LE REMPLACEMENT D’UNE PRESSE HYDRAULIQUE PAR UNE PRESSE ÉLECTRIQUE DU MÊME TONNAGE A ÉTÉ IDENTIFIÉ. POUR AUGMENTER L’EFFICACITÉ DE L’ÉCLAIRAGE, IL A ÉTÉ DÉCIDÉ DE REMPLACER COMPLÈTEMENT L’ÉCLAIRAGE DE L’AIRE DE PRODUCTION PAR L’INSTALLATION DE LAMPES LED TANDIS QUE POUR LE CONFINEMENT DE L’ÉNERGIE PRÉLEVÉE SUR LE RÉSEAU ET LA RÉDUCTION CONSÉQUENTE DES ÉMISSIONS DE CO2, IL EST PRÉVU L’INSTALLATION DU SYSTÈME PHOTOVOLTAÏQUE DE 67 KWP (French)
Property / summary: AFIN DE RÉDUIRE LA CONSOMMATION DANS LE DÉPARTEMENT DE MOULAGE, LE REMPLACEMENT D’UNE PRESSE HYDRAULIQUE PAR UNE PRESSE ÉLECTRIQUE DU MÊME TONNAGE A ÉTÉ IDENTIFIÉ. POUR AUGMENTER L’EFFICACITÉ DE L’ÉCLAIRAGE, IL A ÉTÉ DÉCIDÉ DE REMPLACER COMPLÈTEMENT L’ÉCLAIRAGE DE L’AIRE DE PRODUCTION PAR L’INSTALLATION DE LAMPES LED TANDIS QUE POUR LE CONFINEMENT DE L’ÉNERGIE PRÉLEVÉE SUR LE RÉSEAU ET LA RÉDUCTION CONSÉQUENTE DES ÉMISSIONS DE CO2, IL EST PRÉVU L’INSTALLATION DU SYSTÈME PHOTOVOLTAÏQUE DE 67 KWP (French) / rank
 
Normal rank
Property / summary: AFIN DE RÉDUIRE LA CONSOMMATION DANS LE DÉPARTEMENT DE MOULAGE, LE REMPLACEMENT D’UNE PRESSE HYDRAULIQUE PAR UNE PRESSE ÉLECTRIQUE DU MÊME TONNAGE A ÉTÉ IDENTIFIÉ. POUR AUGMENTER L’EFFICACITÉ DE L’ÉCLAIRAGE, IL A ÉTÉ DÉCIDÉ DE REMPLACER COMPLÈTEMENT L’ÉCLAIRAGE DE L’AIRE DE PRODUCTION PAR L’INSTALLATION DE LAMPES LED TANDIS QUE POUR LE CONFINEMENT DE L’ÉNERGIE PRÉLEVÉE SUR LE RÉSEAU ET LA RÉDUCTION CONSÉQUENTE DES ÉMISSIONS DE CO2, IL EST PRÉVU L’INSTALLATION DU SYSTÈME PHOTOVOLTAÏQUE DE 67 KWP (French) / qualifier
 
point in time: 16 December 2021
Timestamp+2021-12-16T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 14:10, 16 December 2021

Project Q2074119 in Italy
Language Label Description Also known as
English
REPLACING HYDRAULIC PRESS PRESS WITH ELECTRICAL PRESS REVAMPS OF HIGH EFFICACY LED LIGHTING AND FTV SYSTEM
Project Q2074119 in Italy

    Statements

    0 references
    39,857.67 Euro
    0 references
    79,715.34 Euro
    0 references
    50.0 percent
    0 references
    27 November 2017
    0 references
    4 October 2018
    0 references
    16 July 2018
    0 references
    TECNOPLAST S.R.L.
    0 references
    0 references
    0 references

    45°47'46.46"N, 11°45'30.20"E
    0 references
    PER RIDURRE I CONSUMI NEL REPARTO DI STAMPAGGIO SI E' INDIVIDUATA LA SOSTITUZIONE DI UNA PRESSA IDRAULICA CON UNA PRESSA ELETTRICA DEL MEDESIMO TONNELLAGGIO. PER AUMENTARE L'EFFICENZA DI ILLUMINAZIONE SI E' DECISO DI SOSTITUIRE COMPLETAMENTE L'ILLUMINAZIONE DELLA ZONA DI PRODUZIONE INSTALLANDO LAMPADE A LED MENTRE PER IL CONTENIMENTO DELL'ENERGIA PRELEVATA DALLA RETE E LA CONSEGUENTE RIDUZIONE DELLE EMISSIONI DI CO2 SI PREVEDE L'INSTALLAZIONE DI IMPIANTO FOTOVOLTAICO DA 67 KWP (Italian)
    0 references
    TO REDUCE CONSUMPTION IN THE MOULDING DEPARTMENT, THE REPLACEMENT OF A HYDRAULIC PRESS WITH AN ELECTRICAL PRESS OF THE SAME TONNAGE HAS BEEN IDENTIFIED. IN ORDER TO INCREASE THE ILLUMINATION, IT WAS DECIDED TO FULLY REPLACE THE LIGHTING OF THE PRODUCTION AREA BY INSTALLING LED LAMPS WHILE FOR THE CONTAINMENT OF THE ENERGY TAKEN FROM THE GRID AND THE RESULTING REDUCTION IN CO2 EMISSIONS THE INSTALLATION OF 67 KWP OF PV EQUIPMENT IS FORESEEN. (English)
    0 references
    AFIN DE RÉDUIRE LA CONSOMMATION DANS LE DÉPARTEMENT DE MOULAGE, LE REMPLACEMENT D’UNE PRESSE HYDRAULIQUE PAR UNE PRESSE ÉLECTRIQUE DU MÊME TONNAGE A ÉTÉ IDENTIFIÉ. POUR AUGMENTER L’EFFICACITÉ DE L’ÉCLAIRAGE, IL A ÉTÉ DÉCIDÉ DE REMPLACER COMPLÈTEMENT L’ÉCLAIRAGE DE L’AIRE DE PRODUCTION PAR L’INSTALLATION DE LAMPES LED TANDIS QUE POUR LE CONFINEMENT DE L’ÉNERGIE PRÉLEVÉE SUR LE RÉSEAU ET LA RÉDUCTION CONSÉQUENTE DES ÉMISSIONS DE CO2, IL EST PRÉVU L’INSTALLATION DU SYSTÈME PHOTOVOLTAÏQUE DE 67 KWP (French)
    16 December 2021
    0 references

    Identifiers

    B92E17002360007
    0 references